2001 Annual Environmental Report
ML021330270
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/26/2002
From: Vonsuskil J
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW020029
Download: ML021330270 (5)


Text

Exelom, Exelon Generation Company, LLC Braidwood Station www.exeloncorp.com Nuclear 35100 South Rt 53, Suite 84 BTaceville, IL 60407-9619 Tel. 815-458-2801 April 26, 2002 BW020029 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

2001 Annual Environmental Report The attached document includes the Annual Environmental Operating Report for Braidwood Station. This report is being submitted in accordance with Appendix B, "Environmental Protection Plan," of Braidwood Station's Facility Operating License, Section 5.4.1, "Routine Reports," and covers the time period from January 2001 through December 2001.

Braidwood Station evaluated the objectives stated in the Environmental Protection Plan, described in Appendix B of Braidwood Station's Facility Operating License, Section 1, "Objectives of the Environmental Protection Plan." It has been determined that these objectives are successfully being met.

The following Attachments are included in this report.

Attachment A - A list of all changes in Station design or operations, tests, and experiments as required by Appendix B, Section 3.1, "Plant Design and Operation."

Attachment B - A list of all non-routine reports as required by Appendix B, Section 5.4.2, "Nonroutine Reports."

Attachment C - A list of non-compliances to the Environmental Protection Plan and the corrective actions.

April 26, 2002 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions regarding this information, please contact Amy Ferko at (815) 417 2699.

Respectfully, eD.von Suskil

'site Vice President Braidwood Station Attachments:

Attachment A Attachment B Attachment C cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station

ATTACHMENT A List of changes in station design or operations, tests, and experiments as required by Appendix B, Section 3.1 of Braidwood Station's Facility Operating License, "Plant Design and Operation."

None - 2001

ATTACHMENT B List of all non-routine reports as required by Appendix B, Section 5.4.2 of Braidwood Station's Facility Operating License, "Nonroutine Reports."

1. Letter from James D. von Suskil (Exelon) to U.S. Nuclear Regulatory Commission, Document Control Desk, "Environmental Non-Routine Event Report for Exelon Generation Company, LLC Braidwood Station," August 20, 2001.
2. Letter from James D. von Suskil (Exelon) to U.S. Nuclear Regulatory Commission, Document Control Desk, "Environmental Non-Routine Event Report for Exelon Generation Company, LLC Braidwood Station," September 17, 2001.

ATTACHMENT C List of non-compliances to the Environmental Protection Plan and the corrective action.

None - 2001