MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
May 7, 2002 Mr. Stuart Greenberg Environmental Health Watch 4115 Bridge Ave. #104 Cleveland, OH 44113
Dear Mr. Greenberg:
I am responding to your letter of March 21, 2002, concerning the recent discovery of a cavity in the reactor pressure vessel (RPV) head at the Davis-Besse Nuclear Power Station (DBNPS).
The Nuclear Regulatory Commission (NRC) fully appreciates your concerns, the significance of this degradation, and the uniqueness of any type of repair. We are aggressively assessing this first-of-a-kind event.
The NRC will be conducting extensive inspections and evaluating any corrective actions the licensee may propose to assure this type of condition will not happen again. We are also creating a lessons learned task force to review our regulatory and inspection processes and have established an oversight panel in accordance with Chapter 0350 of the NRC Inspection Manual. The staff will also be looking at the root cause, both from a technical standpoint and from a programmatic standpoint to assess any performance issues associated with the degradation to the RPV head at Davis-Besse. The NRC will be monitoring corrective actions and evaluating the extent of condition, i.e., whether the conditions that led to the boric acid corrosion of the reactor vessel head can be occurring elsewhere in the plant. In addition, the NRC is evaluating any pertinent issues associated with this degradation that may affect other plants on a generic basis. If we find that certain generic issues are applicable at other plants, the NRC will take appropriate action.
On being informed by the licensee of the cavity in the RPV, the NRC sent an Augmented Inspection Team (AIT) to the Davis-Besse facility to collect, analyze, and document factual information with respect to the degradation to the RPV head. The AIT completed its review and we will post the AIT report on the NRC web site (www.nrc.gov) as soon as it is completed. Now that the AIT has completed its fact finding mission and is in the process of preparing its report, we are conducting an in-depth technical review which will focus on the analysis of data from the AIT report, the licensees RPV visual inspections, root cause analysis, nondestructive examinations, and proposed corrective actions.
The NRC staff will review the licensees proposed repair or modification plan against the NRCs structural integrity requirements which include a requirement that any proposed repair or modification meet the requirements of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code. As a result, substantial technical resources will be involved in reviewing any proposed repair before determining its acceptability. We will focus on issues such as assuring the repair can withstand the environment of an operating reactor and that it meets all of the stringent requirements a new RPV head would have to meet.
In your letter on behalf of the Environmental Health Watch and several other Ohio-based groups, you requested that the NRC require that Davis-Besse undergo a whole plant X-ray examination followed by a full system walk-down and that the plant remain closed until a new RPV head is installed.
Mr. Greenberg If repairs to the reactor head are approved, the repaired RPV head will be examined using X-ray, or radiographic testing (RT) methods. The NRC will determine whether the licensees proposed repair is acceptable and meets NRCs regulations. If the NRC finds the repairs unacceptable, the licensee must then decide what course of action it wants to follow. With respect to whole plant X-ray examination, each full penetration welded joint in the reactor coolant system (RCS) is radiographically inspected as part of the original construction. Under NRCs regulation, licensees implement an inservice inspection program once a plant goes into production. In accordance with the ASME code, this inspection program requires periodic ultrasonic testing (UT) and inspection of a variety of welds and components and also provides for a visual inspection of welds in components that cannot be volumetrically inspected. The purpose of this program is to detect developing flaws within the RCS, to understand the mechanism behind any flaws that are discovered for potential generic consideration, and to repair them.
In conclusion, I appreciate that you have brought your concerns to my attention, and I assure you that NRC shares your concerns. The NRC is performing a comprehensive, in-depth evaluation of all aspects of this event. The plant will not be restarted until we are fully satisfied that the plant is structurally sound, that the licensee has put in place those corrective action programs necessary to assure that all underlying causes have been corrected, and we are assured that the plant can be safely restarted and operated.
If you have any additional questions in this matter, please do not hesitate to contact me.
Sincerely,
/RA by Jon R. Johnson For/
Samuel J. Collins, Director Office of Nuclear Reactor Regulation