|
---|
Category:Letter type:W
MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 2024-09-03
[Table view] Category:Technical Specification
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML11224A0102011-07-20020 July 2011 License Amendment Request, Technical Specification Change Regarding Steam Generator Tube Integrity W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers2008-09-18018 September 2008 License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements2007-07-0303 July 2007 License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 ML0624201532006-08-29029 August 2006 Amendment Technical Specification Pages, Moderator Temperature Coefficient W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation2006-02-15015 February 2006 License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown2005-10-27027 October 2005 License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown ML0513003032005-05-0909 May 2005 Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS Index W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2005-03-17017 March 2005 Supplement to Amendment Request NPF-38-249, Extended Power Uprate 2024-10-16
[Table view] Category:Bases Change
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 20042004-02-26026 February 2004 Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 20032003-07-24024 July 2003 TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 20032003-01-15015 January 2003 Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 20022002-10-14014 October 2002 Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.22002-01-31031 January 2002 Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 20022002-01-16016 January 2002 Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 ML18053A6971991-05-0808 May 1991 License Amendment Request Technical Specification Change Request NPF-38-114 2024-10-16
[Table view] |
Text
Entergy Operations, Inc.
17265 River Road
~Entlelgy Killona, LA 70066 Tel 504 739 6310 Barry S. Allen, P.E.
Director, Engineering Waterford 3 W3F1-2002-0012 January 31, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License Amendment Request TSCR NPF-38-241, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2.
REFERENCES:
- 1. Entergy letter dated July 9 2001, Technical Specification Change Request NPF-38-234, "Replacement of Part-Length Control Element Assemblies.
- 2. Entergy letter dated September 21, 2001, Technical Specification Change Request, NPF-38-238, "Appendix K Margin Recovery Power Uprate Request"
Dear Sir or Madam:
Pursuant to 10CFR50.90, Entergy Operations, Inc. (Entergy) hereby requests the following amendment for Waterford Steam Electric Station, Unit 3 (Waterford 3). This submittal requests a change to Technical Specification (TS) Safety Limit 2.1.1.2, "Peak Linear Heat Rate" (PLHR).
This change will replace the PLHR Safety Limit with a Peak Fuel Centerline Temperature Safety Limit and update the Index accordingly. The associated TS Bases changes are also being provided to appropriately reflect the proposed new Safety Limit.
It was recently determined that the current Safety Limit does not clearly conform to 10 CFR 50.36(c)(1)(ii)(A). The current PLHR Safety Limit of 21 kW/ft adequately addresses normal steady state operations but may be momentarily exceeded during two anticipated operational occurrences (AOOs). From an accident analysis perspective, this is acceptable per NUREG 0800, "Standard Review Plan" because the fuel centerline melting temperature limit is not exceeded. A change to the Safety Limit is needed to more clearly conform to 10 CFR 50.36.
The proposed change will replace the current Peak Linear Heat Rate Safety Limit with a Peak Fuel Centerline Temperature. The proposed approach contained in Attachment 1 has been discussed with the NRC staff.
This License Amendment Request is submitted on an exigent basis. This change is considered exigent since the need to more clearly conform with 10 CFR 50.36 was only recently identified by the NRC staff. Entergy has worked with the staff to expeditiously submit the needed A-b b
WBF 1-2002-0012 Page 2 of 2 Technical Specification change. This change has been requested by the NRC staff to support License Amendment Requests (References 1 & 2), which have been requested for the March 2002 refueling outage. Entergy requests approval of the proposed amendment byFebruary 28, 2002. Once approved, the amendment shall be implemented within 30 days.
The proposed change has been evaluated in accordance with 10CFR50.91(a)(1) using criteria in 10CFR50.92(c) and it has been determined that this change involves no significant hazards considerations. The proposed change does not include any new commitments.
If you have any questions or require additional information, please contact D. Bryan Miller at 504-739-6692.
I declare under penalty of perjury that the foregoing is true and correct. Executed on January 31, 2002.
Sincerely, B.S. Allen Director, Engineering Waterford Steam Electric Station, Unit 3 BSA/DBM/cbh Attachments:
- 1. Analysis of Proposed Technical Specification Change
- 2. Proposed Technical Specification Changes (mark-up)
- 3. Changes to TS Bases pages (mark-up) cc: E.W. Merschoff, NRC Region IV N. Kalyanam, NRC-NRR J. Smith N.S. Reynolds NRC Resident Inspectors Office Louisiana DEQ/Surveillance Division American Nuclear Insurers
Attachment I W3FI -2002-0012 Analysis of Proposed Technical Specification Change Regarding Peak Fuel Centerline Temperature to W3F1-2002-0012 Page 1 of 5 Analysis of Proposed Technical Specification Change Regarding Peak Fuel Centerline Temperature
1.0 DESCRIPTION
This letter is a request to amend Operating License NPF-38 for Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed change will replace the Peak Linear Heat Rate (PLHR) Safety Limit, Technical Specification 2.1.1.2, with a Peak Fuel Centerline Temperature Safety Limit. This change is necessary to more clearly conform with 10 CFR 50.36(c)(1)(ii)(A), which requires that Limiting Safety System Settings prevent a Safety Limit from being exceeded during normal operations and Anticipated Operational Occurrences (AOOs).
2.0 PROPOSED CHANGE
Replace Technical Specification (TS) Safety Limit (SL) 2.1.1.2, "Peak Linear Heat Rate" with a new "Peak Fuel Centerline Temperature" Safety Limit.
Revise TS Index page III to reflect the new SL. contains the marked-up TS pages reflecting the proposed changes.
The Bases for TS 2.1.1 and 2.2.1 are being revised accordingly to reflect the new Peak Fuel Centerline Temperature Safety Limit and provide a reference to the approved Topical Report for determining the new Safety Limit. The Bases for TS 3/4.2.7, "Axial Shape Index" will also be revised to reference the new Safety Limit. Attachment 3 contains the marked-up TS Bases pages reflecting the proposed changes. The Bases pages are provided for information only.
This change deviates from NUREG-1432 1 in that it proposes to replace the PLHR Safety Limit with the Peak Fuel Centerline Temperature Safety Limit. This deviation from NUREG-1432 is necessary to ensure this SL adequately address both AOOs and normal operation. Note, however, that the change is consistent with the standard improved Technical Specifications for the Westinghouse and Babcock and Wilcox plants (see Section 6.0, Precedence).
3.0 BACKGROUND
In preparation for the Spring 2002 refueling outage, Entergy submitted License Amendment Requests (TAC# MB2971 2 & MB2379 3) to increase rated thermal power by 1.5% (Appendix K Margin Recovery) and replace the part-length control element assemblies with full length control element assemblies. During the review of the Waterford 3 Appendix K Margin Recovery Power Uprate request, the NRC staff recognized that the PLHR SL of 21 kW/ft would be exceeded for an AOO. In accordance with 10 CFR 50.36(c)(1)(ii)(A), Limiting Safety System Settings must 1 NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Revision 2 2 Entergy letter dated September 21, 2001, Technical Specification Change Request, NPF-38-238, "Appendix K Margin Recovery - Power Uprate Request" Entergy letter dated July 9 2001, Technical Specification Change Request NPF-38-234, "Replacement of Part-Length Control Element Assemblies" to W3F1-2002-0012 Page 2 of 5 be chosen such that automatic action will prevent a SL from being exceeded. This is applicable during normal operations and AQOs. Therefore conformance with 10 CFR 50.36 was not clearly demonstrated.
While the current steady state limit of 21 kW/ft is momentarily exceeded during the two AQOs; the peak fuel centerline temperature does not exceed the melting point. The AOOs are the Control Element Assembly Withdrawal events from subcritical and low power conditions. The analysis results, including the linear heat rate greater than 21 kW/ft, for these events has been previously reviewed in accordance with the Standard Review Plan 4 (SRP) and found to be acceptable by the NRC staff. This review and acceptance by the staff is documented in the original Waterford 3 Safety Evaluation Report5 and the Safety Evaluation Report for the Waterford 3 Cycle 2 Reload Analysis Report6 .
4.0 TECHNICAL ANALYSIS
The intent of the PLHR SL is to prevent the fuel centerline temperature from reaching the melting point, which conservatively assures there will be no breach in cladding integrity. The current 21 kW/ft limit was chosen because it is the highest steady state linear heat rate at which the fuel can operate without causing the centerline temperature to reach the melting point. This limit adequately addresses steady state operation (normal operation). However, during two short duration AOOs at Waterford 3, PLHR exceeds 21 kW/ft. Due to the short duration of these AQOs, the peak fuel centerline temperature does not exceed the melting point of the fuel.
A more appropriate SL would be one that addresses both normal operation and AQOs such as peak fuel centerline temperature.
In accordance with 10 CFR 50, Appendix A, "General Design Criteria" (GDC) 10, "Reactor Design," and 20, "Protection Systems Functions," the acceptance criteria for normal operation and AQOs is that the Specified Acceptable Fuel Design Limits (SAFDLs) not be exceeded. The SAFDL of interest, in this case, is the Peak Fuel Centerline Temperature limit. This SAFDL is discussed in detail in SRP Section 4.2 , which states:
(//) (A) (2)(e) "Overheatingof Fuel Pellets: It has also been traditionalpractice to assume that failure will occur if centerline melting takes place. ... For normal operation and anticipated operational occurrences, centerline melting is not permitted. ... The centerline melting criterion was established to assure that axial or radial relocation of molten fuel would neither allow molten fuel to come into contact with the cladding nor produce local hot spots. The assumption that centerline melting results in fuel failure is conservative."
Waterford 3 complies with GDC 10 and 20 as discussed in Final Safety Analysis Report (FSAR)
Sections 3.1.6 and 3.1.16. Additionally, FSAR Section 4.4.1, lists the SAFDLs utilized for the design of the Waterford 3 reactor. FSAR Section 4.4.1.3, states:
4 NUREG-0800, "Standard Review Plan," Section 15.4.1, "Uncontrolled Control Rod Assembly Withdrawal From A Subcritical or Low Power Startup Condition," Rev. 2, July 1981 5 NUREG-0787, "Safety Evaluation Report related to the operation of Waterford Steam Electric Station, Unit No. 3," July 1981 6 NRC letter dated January 16, 1987, "Reload Analysis Report for Cycle 2 at Waterford 3" 7 NUREG-0800, Standard Review Plan, Section 4.2, "Fuel System Design," Rev. 2, July 1981
Attachment 1 to W3F1-2002-0012 Page 3 of 5 "The peak temperatureof the fuel shall be less than the melting point ... during steady state operation and anticipatedoperationand anticipatedoperationaloccurrences."
Therefore, a more appropriate SL would be one that is based upon the peak fuel centerline temperature. A peak fuel centerline temperature SL would address both normal operation and ACOs. A peak fuel centerline temperature SL would be consistent with 10 CFR 50 Appendix A, the SRP, the Waterford 3 licensing basis, and 10 CFR 50.36.
The melting point of the fuel is dependent on fuel bumup and the amount and type of burnable poison used in the fuel. The design melting point of new fuel with no burnable poison is 5080 OF. The melting point is adjusted downward from this temperature depending on the amount of bumup and amount and type of burnable poison in the fuel. The adjustment for burnup of 58 OF per 10,000 MWD/MTU is consistent with standard TSs as discussed in Section 6.0 of this attachment. The 58 OF per 10,000 MWD/MTU was accepted by the NRC staff in Topical Report CEN-386-P-A8 . The burnable poison adjustments are determined in accordance with CENPD-382-P-A9 . The adjustment for the erbium burnable poison is considered to be proprietary information and therefore can not be included in the TS.
The mode of applicability and actions required if the limit was exceeded would be the same as they are for the current PLHR SL. CENPD-382-P-A will be appropriately referenced in the TS Bases for the SL.
Therefore, a peak fuel centerline temperature SL of less than 5080 OF (decreasing by 58 OF per 10,0000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-382-P-A) is more appropriate then the current PLHR SL. The peak fuel centerline temperature SL will:
"* address both normal operations and AQOs,
"* be consistent with 10 CFR 50 Appendix A criteria,
"* be consistent with SAFDLs,
"* be consistent with SRP acceptance criteria,
"* be consistent with the Waterford 3 licensing basis,
"* be determined using NRC approved methodologies, and
"* clearly conform to 10 CFR 50.36(c)(1)(ii)(A).
5.0 REGULATORY ANALYSIS
5.1 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met.
' CEN-386-P-A, "Verification of the Acceptability of a 1-Pin Burnup Limit of 60 MWD/kgU for Combustion Engineering 16x16 PWR Fuel," August 1992 9 Topical Report, CENDP-382-P-A, "Methodology for Core Designs Containing Erbium Burnable Absorbers," Revision 0, August 1993 to W3F1-2002-0012 Page 4 of 5 The proposed change is already consistent with the Waterford 3 FSAR and the FSAR will only require a change to indicate that the Safety Limit for fuel temperature is fuel centerline melt and not linear heat rate.
Entergy has determined that the proposed changes do not require any exemptions or relief from regulatory requirements, other than the TS, and do not affect conformance with any GDC differently than described in the FSAR. The approval of this change will clearly establish conformance with 10 CFR 50.36.
5.2 No Significant Hazards Consideration The proposed change will revise the Waterford 3 Technical Specifications to replace the Peak Linear Heat Rate Safety Limit, Technical Specification 2.1.1.2, with a Peak Fuel Centerline Temperature Safety Limit. The value of the new Safety Limit will be the melting point of the fuel (5080 OF (decreasing by 58 OF per 10,0000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-382-P-A). This change is necessary to more clearly conform with 10 CFR 50.36(c)(1)(ii)(A), which requires that Limiting Safety System Settings prevent a Safety Limit from being exceeded during normal operations and Anticipated Operational Occurrences (AOOs.)
Entergy Operations, Inc. has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change does not require any physical change to any plant systems, structures, or components nor does it require any change in systems or plant operations.
The proposed change does not result in any change to safety analysis methods or results. The change to establish the peak fuel centerline temperature as the Safety Limit is consistent with the Waterford 3 licensing basis for ensuring that the fuel design limits are met. Operations and analysis will continue to be in accordance with the Waterford 3 licensing basis. The peak fuel centerline temperature is the basis for protecting the fuel and is consistent with safety analysis.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The Waterford 3 FSAR Chapter 15 accident analysis for AOOs where the peak linear heat rate may exceed the existing Safety Limit of 21 kW/ft is the CEA Withdrawal at subcritical and low power conditions. The analysis for these AOOs indicates that the to W3F1-2002-0012 Page 5 of 5 peak fuel centerline temperature is not exceeded. The existing safety analysis, which is unchanged, does not affect any accident initiators that would create a new accident.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change does not result in any change to safety analysis methods or results. Therefore, by changing the Safety Limit from peak linear heat rate to peak fuel centerline temperature the margin as established in the Waterford 3 Technical Specifications and FSAR are unchanged.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Entergy concludes that the proposed amendment(s) present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.3 Environmental Considerations The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 PRECEDENCE The "Peak Fuel Centerline Temperature Safety Limit" proposed for Waterford 3 is consistent with the "Peak Fuel Centerline Temperature" and "Maximum Local Fuel Pin Centerline Temperature" Safety Limits contained in the Standard Technical Specifications (STS) for Westinghouse 10 and Babcock & Wilcox11 (B&W) plants, respectively. The STS for Westinghouse and B&W contain a formula for decreasing the melting point as a function of burnup. The proposed SL for Waterford 3 does not contain the same formula but instead states that the limit is "decreasing by 58 OF per 10,0000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-382-P-A." This is acceptable because the portion of the adjustment formula accounting for burnable poison is proprietary and can not be placed in the TS. CENPD-382-P-A is an approved NRC methodology.
10 NUREG-1431, Standard Technical Specifications Westinghouse Plants, Revision 2 "1NUREG-1430, Standard Technical Specifications Babcock and Wilcox Plants, Revision 2
Attachment 2 W3F1 -2002-0012 Proposed Technical Specification Changes (mark-up)
W3F1-2002-0012 Page 1 of 3 INDEX SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS PAGE SECTION 2.1 SAFETY LIMITS REACTOR CORE ......................................... 2-1 2.1.1 NSR ..................................................... 2-1 2.1.1.1* L ... ................................ 2-1 2.1.1.2 2.1.2 REACTOR COOLANT SYSTEM PRESSURE.........................21 2.2 LIMITING SAFETY SYSTEM SETTINGS 2-2 2.2.1 REACTOR TRIP SETPOINTS .....................................
BASES PAGE SECTION 2.1 SAFETY LIMITS B 2-1 2.1.1 REACTOR CORE ............................................... B 2-2 2.1.2 REACTOR COOLANT SYSTEM PRESSURE ............................
2.2 LIMITING SAFETY SYSTEM SETTINGS
................................ 8 2-2 2.2.1 REACTOR TRIP SETPOINTS ...
. .,,,,q.,, TTT AMENDMENT NO. 5 WAILKrUftU - -5 W3F1-2002-0012 Page 2 of 3 2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE DNBR 2.1.1.1 The DNBR of the reactor core shall be maintained greater than or equal to 1.26. I APPLICABILITY: MODES 1 and 2.
ACTION:
Whenever the DNBR of the'reactor has decreased to less than 1.26, be in HOT I STANDBY within I hour, and comply with the requirements of Specification 6.7.1.
4 A-"
REACTOR COOLANT SYSTEM PRESSURE 2.1.2 The Reactor Coolant System pressure shall not exceed 2750 psia.
APPLICABILITY: MODES 1, 2, 3, 4, and 5.
ACTION:
MODES I and 2 Whenever the Reactor Coolant System pressure has exceeded 2750 psia, be in HOT STANDBY with the Reactor Coolant System pressure within its limit within I hour, and comply with the requirements of Specification 6.7.1.
MODES 3, 4, and 5 Whenever the Reactor Coolant System pressure has exceeded 2750 psia, reduce the Reactor Coolant System pressure to within its limit within 5 minutes, and comply with the requirements of Specification 6.7.1.
WATERFORO - UNIT 3 2-1 AMiEND14ENT NO. 12
Aftachment 2 W3F1-2002-0012 Page 3 of 3 TS 2.1.1.2 Insert PEAK FUEL CENTERLINE TEMPERATURE 2.1.1.2 The peak fuel centerline temperature shall be maintained less than 5080 OF (decreasing by 58 OF per 10,000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-382 P-A.)
APPLICABILITY: MODES 1 and 2.
ACTION:
Whenever the peak fuel centerline temperature has equaled or exceeded 5080 OF (decreasing by 58 OF per 10,000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-382 P-A), be in HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and comply with the requirements of Specification 6.7.1.
Attachment 3 W3F1 -2002-0012 Changes to Technical Specification Bases Pages (Mark-up)
Aftachment 3 W3F1-2002-0012 Page 1 of 4 2.1 and 2.2 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS BASES 2.1.1 REACTOR CORE The restrictions of these safety limits prevent overheating of the fuel cladding and possible cladding perforation which would result in the release of fission products to the reactor coolant. Overheating of the fuel cladding is prevented by (1) restricting fuel operation to within the nucleate boiling regime where the temperature heat transfer I'sihtly abov coefficient h oln auaintmeaure .andsurface is large and the cladding (2) ma* 11 an . /ft ic wiQ n" ca f eel ni First, by operating within the nucleate boiling regime of heat transfer, the heat transfer coefficient is large enough so that the maximum clad surface temperature is only slightly greater than the coolant saturation temperature.
The upper boundary of the nucleate boiling regime is termed "departure from nucleate boiling" (DNB). At this point, there is a sharp reduction of the heat transfer coefficient, which would result in higher cladding temperatures and the possibility of cladding failure.
Correlations predict DNB and the location of DNB for axially uniform and non-uniform heat flux distributions. The local DNB ratio (ONBR), defined as the ratio of the predicted DNB heat flux at a particular core location to the actual heat flux at that location, is indicative.of the margin to DNB. The minimum value of DNBR during normal operational occurrences is limited to 1.26 for the CE-1 correlation and is established as a Safety Limit. This value is based on a statistical combination of uncertainties. It includes uncertainties in the CHF correlation, allowances for rod bow and hot channel factors (related to fuel manufacturing variations) and allowances for other hot channel calcula tive uncertainties.
Second, operation with a peak linear heat rate below that which would cause fuel centerline melting maintains fuel rod and cladding integrity. Above this peak linear heat rate level (i.e., with some melting in the center), fuel rod integrity would be maintained only if the design and operating conditions are appropriate throughout the life of the fuel rods. Volume changes which accom pany the solid to liquid phase change are significant and require accommodation.
Another consideration involves the redistribution of the fuel which depends on the extent of the melting and the physical state of the fuel rod at the time of mn tin .Because of the above factors, h o s f.1 cnterline melti6 is established Limiting safety system settings for the Low DNBR, High Local Power Density, High Logarithmic Power Level, Low Pressurizer Pressure and High Linear Power Level trips, and limiting conditions for operation on DNBR and kW/ft margin are specified such that there is a high degree of confidence that the specified acceptable fuel design limits are not exceeded during normal operation and design basis anticipated operational occurrences.
WATERFORD - UNIT 3 B 2-1 Amendment No. 12
Aitachment 3 W3F1 -2002-0012 Page 2 of 4 Bases Insert A maintaining the peak fuel centerline temperature below the melting point.
Bases Insert B The design melting point of new fuel with no burnable poison is 5080 OF. The melting point is adjusted downward from this temperature depending on the amount of bumup and amount and type of burnable poison in the fuel. The 58 OF per 10,000 MWD/MTU adjustment for burnup was accepted by the NRC in Topical Report CEN-386-P-A, "Verification of the Acceptability of a 1-Pin Burnup Limit of 60 MWD/kgU for Combustion Engineering 16x16 PWR Fuel," August 1992. Adjustments for burnable poisons are established based on NRC approved Topical Report CENPD-382-P-A, "Methodology for Core Designs Containing Erbium Burnable Absorbers," August 1993.
A steady state peak linear heat rate of 21 kW/ft has been established as the Limiting Safety System Setting to prevent fuel centerline melting during normal steady state operation.
Following design basis anticipated operational occurrences, the transient linear heat rate may exceed 21 kW/ft provided the fuel centerline melt temperature is not exceeded.
W3F1-2002-0012 Page 3 of 4 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS BASES Local Power Density - High (Continued)
The local power density (LPD), the trip variable, calculated by the CPC incorporates uncertainties and dynamic compensation routines. These uncertainties and dynamic compensation routines ensure that a reactor trip occurs when the actual core peak LPD3 is sufficiently less than the fuel design limit such that the increase in actual core peak LPD after the trip will not result in a violation of the Safety Limit. CPC uncertainties related to peak LPD are the same types ued for DNBR calculation. Dynamic compensation for peak LPD is provided for th effects of core fuel centerline temperature delays (relative to changes in ower density), sensor time delays, and protection system equipment time delays.
DNBR - Low The DNBR - Low trip is provided to prevent the DNBR in the limiting coolant channel in the core from exceeding the fuel design limit in the event of anticipated operational occurrences. The DNBR - Low trip incorporates a low pressurizer pressure floor of 1860 psia. At this pressure a DNBR - Low trip will automatically occur. This low pressure trip also provides protection against steam generator tube rupture events. The DNBR is calculated in the CPC utilizing the following information:
- a. Nuclear flux power and axial power distribution from the excore neutron flux monitoring system;
- b. Reactor Coolant System pressure from pressurizer pressure measurement;
- c. Differential temperature (Delta T) power from reactor coolant temperature and coolant flow measurements;
- d. Radial peaking factors from the position measurement for the CFs;
- e. Reactor coolant mass flow rate from reactor coolant pump speed;
- f. Core inlet temperature from reactor coolant cold leg temperature measurements.
The ONOR, the trip variable, calculated by the CPC incorporates various uncertainties and dynamic compensation routines to assure a trip is initiated prior to violation of fuel design limits. These uncertainties and dynamic compensation routines ensure that a reactor trip occurs when the actual core OMBR is sufficiently greater than the fuel design limit such that the decrease WATERFORD - UNIT 3 a 2-5 AMOOMENT NO. 1.2
Aftachment 3 W3F1-2002-0012 Page 4 of 4 POWER DISTRIBUTION LIMITS BASES DNBR MARGIN (Continued)
A DNOR penalty factor has been included in the COLSS and CPC DNBR calcula tions to accommodate the effects of rod bow. The amount of rod bow in each assembly is dependent upon the average burnup experienced by that assembly.
Fuel assemblies that incur higher average burnup will experience a greater magnitude- of rod bow. Conversely, lower burnup assemblies will experience less rod bow. In design calculations, the penalty for each batch required to compensate for rod bow is determined from a batch's maximum average assembly burnup applied to the batch's maximum integrated planar-radial power peak. A single net penalty for COLSS and CPC is then determined from the penalties associated with each batch, accounting for the offsetting margins due to the lower radial power peaks in the higher burnup batches.
3/4.2.5 RCS FLOW RATE This specification is provided to ensure that the actual RCS total flow rate is maintained at or above the minimum value used in the LOCA safety analyses, and that the DNBR is maintained within the safety limit for Anti cipated Operational Occurrences (AOO).
3/4.2.6 REACTOR COOLANT COLD LEG TEMPERATURE This specification is provided to ensure that the actual value of reactor coolant cold leg temperature is maintained within the range of values used in the safety analyses, with adjustment for instrument accuracy of t20F, and that the peak linear heat generation rate and the moderator temperature coefficient effects are validated.
3/4.2.7 AXIAL SHAPE INDEX This specification is provided to ensure that the actual value of AXIAL SHAPE INDEX is maintained within the range of values used in the safety analyses, to ensure that the I h and DNBR remain within the safety limits for Anticipated Opera ona Occurrences (AOO).
3/4.2.8 PRESSURIZER PRESSURE rat s "na ----
This specification is provided to ensure that the actual value of pressurizer pressure is maintained within the range of values used in the safety analyses. The inputs to CPCs and COLSS are the most limiting. The values are adjusted for an instrument accuracy of
B 3/4, 2-A AMENDMENT No. 12 WATERFORD- UNIT 3