Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24043A0462024-02-16016 February 2024 Summary of Meeting with TVA to Discuss Use of Risk-Informed Process Evaluation (RIPE) for a Proposed LAR Regarding Elimination of Limiting Condition for Operation Actions for Rod Worth Minimizers ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23116A2472023-05-23023 May 2023 Issuance of Amendment Nos. 330, 353, and 313 Regarding Adoption of TSTF-478, Revision 2 for Combustible Gas Control ML23101A1102023-05-16016 May 2023 Issuance of Amendment Nos. 329, 352, and 312 Regarding Removal of Site Acreage Description from Technical Specifications ML23073A2902023-05-0202 May 2023 Issuance of Amendment Nos. 328, 351, and 311 Adoption of TSTF-505, Revision 2, for Risk-Informed Completion Times and TSTF-439, Revision 2, to Eliminate Second Completion Times ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22327A0182022-12-0101 December 2022 Correction of Error Incurred During Issuance of License Amendment No. 322 ML22273A1032022-11-22022 November 2022 Issuance of Amendment Nos. 323, 346, and 306 Regarding Chilled Water Cross-Tie Modification ML22220A2602022-11-21021 November 2022 Issuance of Amendment Nos. 322, 345, and 305 Regarding Adoption of TSTF Traveler TSTF-205-A, Rev. 3, and TSTF-563-A ML22138A3252022-06-24024 June 2022 Issuance of Amendment Nos. 321, 344, and 304 Regarding Spent Fuel Pool Criticality Safety Analysis ML22161A9292022-06-10010 June 2022 Bf 2022-301 Exam Report Items, SRO Written Exam ML22020A2282022-03-16016 March 2022 Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21173A1772021-07-27027 July 2021 Issuance of Amendment Nos. 317, 340, and 300 Regarding Adoption of Title 10 of the Code of Federal Register Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20190A1052020-08-11011 August 2020 Correction to Amendment No. 319 Regarding Revisions to Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times ML19294A0112019-12-26026 December 2019 Issuance of Amendment Nos. 311, 334, and 294 Adopt Technical Specifications Task Force Traveler, TSTF-542, Revision 2 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19198A0012019-08-13013 August 2019 Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) ML19037A1372019-04-0202 April 2019 Revisions to Modifications 85, 102 and 106 Related to National Fire Protection Association 805 Performance-based Standard for Fire Protection of Light Water Reactor Electric Generating Plants ML18241A3192018-10-0909 October 2018 Issuance of Amendment Nos. 306, 329, and 289 to Revise Approved NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants-Revision ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) ML17032A1202017-08-14014 August 2017 Non-Proprietary Issuance of Amendments Regarding Extended Power Uprate ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML17052A1362017-03-16016 March 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendment Nos. 297, 321, and 281 to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (CAC Nos. MF8125, MF8126, and MF8127) ML16330A1582017-01-17017 January 2017 Issuance of Amendments Regarding Revisions to Technical Specification 4.3.1.2, Fuel Storage Criticality ML16028A4142016-04-26026 April 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15317A4782016-02-0909 February 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15344A3212016-01-0707 January 2016 Issuance of Amendment Regarding Modification of Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits ML15321A4722015-12-23023 December 2015 Issuance of Amendments Regarding Revision to Table 3.3.6.1-1, Primary Containment Isolation Instrumentation ML15287A2132015-12-16016 December 2015 Issuance of Amendments Regarding Technical Specification Changes to Reactor Core Safety Limits ML15324A2472015-12-14014 December 2015 Issuance of Amendment to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Valves to Licensee Control ML15287A3712015-12-0404 December 2015 Issuance of Amendments for the Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-535 (CNL-15-029) ML15212A7962015-10-28028 October 2015 Issuance of Amendments to Transition to Fire Protection Program NFPA-805 ML15251A5402015-09-29029 September 2015 Issuance of Amendment Regarding Control Rod Scram Time Testing Frequency Per TSTF-460, Revision 0 ML15065A0492015-06-0202 June 2015 Issuance of Amendment Revising Pressure and Temperature Limit Curves 2024-02-16
[Table view] Category:Safety Evaluation
MONTHYEARML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23116A2472023-05-23023 May 2023 Issuance of Amendment Nos. 330, 353, and 313 Regarding Adoption of TSTF-478, Revision 2 for Combustible Gas Control ML23101A1102023-05-16016 May 2023 Issuance of Amendment Nos. 329, 352, and 312 Regarding Removal of Site Acreage Description from Technical Specifications ML23073A2902023-05-0202 May 2023 Issuance of Amendment Nos. 328, 351, and 311 Adoption of TSTF-505, Revision 2, for Risk-Informed Completion Times and TSTF-439, Revision 2, to Eliminate Second Completion Times ML23054A2902023-03-13013 March 2023 Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22273A1032022-11-22022 November 2022 Issuance of Amendment Nos. 323, 346, and 306 Regarding Chilled Water Cross-Tie Modification ML22220A2602022-11-21021 November 2022 Issuance of Amendment Nos. 322, 345, and 305 Regarding Adoption of TSTF Traveler TSTF-205-A, Rev. 3, and TSTF-563-A ML22298A2852022-11-14014 November 2022 Request for Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(B) and Use of Code Case N-526 ML22138A3252022-06-24024 June 2022 Issuance of Amendment Nos. 321, 344, and 304 Regarding Spent Fuel Pool Criticality Safety Analysis ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22020A2282022-03-16016 March 2022 Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 ML22010A1952022-01-12012 January 2022 Request to Use Later Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21173A1772021-07-27027 July 2021 Issuance of Amendment Nos. 317, 340, and 300 Regarding Adoption of Title 10 of the Code of Federal Register Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20253A1812020-09-23023 September 2020 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times ML19329E3192020-01-0202 January 2020 SE Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC Nos. MF4540, MF4541 and MF4542; EPID No. L-2014-JLD-0044) ML19294A0112019-12-26026 December 2019 Issuance of Amendment Nos. 311, 334, and 294 Adopt Technical Specifications Task Force Traveler, TSTF-542, Revision 2 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19198A0012019-08-13013 August 2019 Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) ML19037A1372019-04-0202 April 2019 Revisions to Modifications 85, 102 and 106 Related to National Fire Protection Association 805 Performance-based Standard for Fire Protection of Light Water Reactor Electric Generating Plants ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML19016A2152019-02-28028 February 2019 Relief from the Requirements of American Association of Mechanical Engineers Code Section XI Inservice Inspection Program, Request for an Alternative ISI-46 ML18323A1722018-12-31031 December 2018 Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds ML18323A0262018-12-0404 December 2018 Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds ML18241A3192018-10-0909 October 2018 Issuance of Amendment Nos. 306, 329, and 289 to Revise Approved NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants-Revision ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML18236A3312018-09-24024 September 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17261A0362017-10-0606 October 2017 Request for Request 3-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Examination Coverage of Inside Radius and Nozzle-to-Vessel Welds ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) ML17032A1202017-08-14014 August 2017 Non-Proprietary Issuance of Amendments Regarding Extended Power Uprate ML17145A5522017-08-11011 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Alternative Request IST-RR-1 for the Fourth 10-Year Inservice Testing Interval (CAC Nos. MF9087, MF9088, and MF9089) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... 2024-01-03
[Table view] Category:Technical Specifications
MONTHYEARCNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20190A1052020-08-11011 August 2020 Correction to Amendment No. 319 Regarding Revisions to Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML18283A8972018-10-10010 October 2018 Enclosure 1: Proposed Changes to Browns Ferry Nuclear Plant Unit 1 Technical Specifications, Attachments 1, 2, & 3 ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects2017-01-20020 January 2017 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects NL-17-015, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Saf2017-01-20020 January 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safe ML16330A1582017-01-17017 January 2017 Issuance of Amendments Regarding Revisions to Technical Specification 4.3.1.2, Fuel Storage Criticality ML16028A4142016-04-26026 April 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15317A4782016-02-0909 February 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15344A3212016-01-0707 January 2016 Issuance of Amendment Regarding Modification of Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits ML15321A4722015-12-23023 December 2015 Issuance of Amendments Regarding Revision to Table 3.3.6.1-1, Primary Containment Isolation Instrumentation ML15287A2132015-12-16016 December 2015 Issuance of Amendments Regarding Technical Specification Changes to Reactor Core Safety Limits ML15324A2472015-12-14014 December 2015 Issuance of Amendment to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Valves to Licensee Control ML15287A3712015-12-0404 December 2015 Issuance of Amendments for the Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-535 (CNL-15-029) ML15212A7962015-10-28028 October 2015 Issuance of Amendments to Transition to Fire Protection Program NFPA-805 ML15251A5402015-09-29029 September 2015 Issuance of Amendment Regarding Control Rod Scram Time Testing Frequency Per TSTF-460, Revision 0 CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. ML15065A0492015-06-0202 June 2015 Issuance of Amendment Revising Pressure and Temperature Limit Curves CNL-15-070, Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-4852015-05-29029 May 2015 Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485 CNL-15-019, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501)2015-03-0909 March 2015 License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) CNL-15-029, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502)2015-03-0909 March 2015 License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502) CNL-15-033, License Amendment Request Under Exigent Circumstances for the Change to Add a Reference to the ATRIUM-10 Xm NRC Safety Evaluation Approval in Technical Specification 5.6.5.b in Support of ATRIUM-10 Xm Fuel Use2015-02-12012 February 2015 License Amendment Request Under Exigent Circumstances for the Change to Add a Reference to the ATRIUM-10 Xm NRC Safety Evaluation Approval in Technical Specification 5.6.5.b in Support of ATRIUM-10 Xm Fuel Use CNL-14-156, Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Withdrawal of Requests and Update to EPU Plans and Schedules2014-09-18018 September 2014 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Withdrawal of Requests and Update to EPU Plans and Schedules NL-14-081, Browns Ferry, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Fer2014-05-16016 May 2014 Browns Ferry, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferr CNL-14-081, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferry2014-05-16016 May 2014 Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferry NL-13-148, Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484)2013-12-18018 December 2013 Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) CNL-13-148, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484)2013-12-18018 December 2013 Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) CNL-13-126, Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-4852013-11-22022 November 2013 Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-485 ML13199A2212013-08-30030 August 2013 Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals ML13092A3932013-03-27027 March 2013 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (Technical Specification Change TS-480) ML13070A3072013-02-28028 February 2013 Technical Specification Change TS-478 - Addition of Analytical Methodologies to Technical Specification 5.6.5 for Browns Ferry 1, 2, & 3, & Revision of Technical Specification 2.1.1.2 for Browns Ferry Unit 2, in Support of ATRIUM-10 Xm Fuel ML11189A2172012-07-30030 July 2012 Issuance of Amendments Regarding Request to Add Technical Specification 3.7.3, Control Room Emergency Ventilation System, Action to Address Two Crev Subsystems Inoperable ML12114A0042012-04-18018 April 2012 Supplement to License Amendment Request to Transition to Areva Fuel ML1011601532010-04-16016 April 2010 Supplemental Information for Technical Specification Change TS-473 - Areva Fuel Transition Amendment Request ML0923700452009-11-19019 November 2009 Issuance of Amendments Regarding Technical Specification Improvement to Adopt Technical Specification Task Force (TSTF) TSTF-476, Revision 1 ML0931402652009-10-31031 October 2009 Attachment 13, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2864(NP), Revision 2, Reload Safety Analysis Report 2024-04-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 July 2, 1992 Docket No. 50-260 Dr. Mark 0. Medford, Vice President Nuclear Assurance, Licensing & Fuels Tennessee Valley Authority 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
Dear Dr. Medford:
SUBJECT:
BROWNS FERRY NUCLEAR PLANT UNIT 2 - ISSUANCE OF AMENDMENT (TAC NO. M83351) (TS 317T)
The Commission has issued the enclosed Amendment No.202 to Facility Operating License No. DPR-52 for the Browns Ferry Nuclear Plant (BFN) Unit 2. This amendment responds to the application by the Tennessee Valley Authority (TVA) dated May 13, 1992.
The amendment revises Technical Specifications Table 3.2.C and Technical Specification 3.5.K/4.5.K to allow continued operation when the Rod Block Monitor (RBM) is inoperable provided that thermal margin defined by the minimum critical power ratio (MCPR) is within specified limits. Technical Specification Bases 3.2 is also changed, summarizing the basis for the revised specifications.
These changes werp requested because BFN Unit 2 has experienced an unusually large number of failures of Local Power Range Monitor (LPRM) instruments which threatens the continued operability of the RBM. The RBM operability issue will be resolved when LPRM problems are addressed during the upcoming BFN Unit 2 refueling outage. Therefore, the amendment is a temporary change, and expires at the end of the current fuel cycle.
~~~ Ej~~
94207100072 920702 Ul PDR ADOCK 05000260 P PDR
Dr. Mark 0. Medford -2 - July 2, 1992 A copy of the staff's safety evaluation of this amendment is provided as Enclosure 2. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Original signed by Joseph F. Williams, Project Manager Project Directorate 11-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No.202 to License No. DPR-52
- 2. Safety Evaluation cc w/enclosures:
See next page "Rr eylay W?.
OFC PDI I-4/LA PDII-4/PM PDII-4/PM uOGC i g- PDII4/D NAME MSanders__
_ _ JWilliams:as TRoss,-.. "jJv.Jv]u) -FHeudonn DATE 6/,_ 2 _9_ 6/.2f/92 6/1z4/92 S/ 1/92 1792 6/
7
Browns Ferry Nuclear Plant Tennessee Valley Authority ATTN: Dr. Mark 0. Medford cc:
Mr. John B. Waters, Director Claude Earl Fox, M.D.
Tennessee Valley Authority State Health Officer ET 12A State Dept. of Public Health 400 West Summit Hill Drive State Office Building Knoxville, Tennessee 37902 Montgomery, Alabama 36130 Mr. J. R. Bynum, Vice President Regional Administrator Nuclear Operations U.S.N.R.C. Region II 3B Lookout Place 101 Marietta Street, N.W.
1101 Market Street Suite 2900 Chattanooga, Tennessee 37402-2801 Atlanta, Georgia 30323 Mr. Charles Patterson Mr. R. R. Baron, Site Licensing Manager Senior Resident Inspector Browns Ferry Nuclear Plant Browns Ferry Nuclear Plant Tennessee Valley Authority U.S.N.R.C.
P.O. Box 2000 Route 12, Box 637 Decatur, Alabama 35602 Athens, Alabama 35611 Mr. 0. J. Zeringue, Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, Alabama 35602 Mr. M. J. Burzynski, Manager Nuclear Licensing and Regulatory Affairs 5B Lookout Place Chattanooga, Tennessee 37402-2801 TVA Representative Tennessee Valley Authority 11921 Rockville Pike Suite 402 Rockville, Maryland 20852 General Counsel Tennessee Valley Authority ET-11H 400 West Summit Hill Drive Knoxville, Tennessee 37902 Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 6
Distribution Docket File NRC PDR Local PDR BFN Rdg. File S. Varga 14-E-4 G. Lainas 14-H-i F. Hebdon M. Sanders J. Williams T. Ross OGC D. Hagan MNBB-3301 G. Hill Pl-37 Wanda Jones P-370 C. Grimes 11-E-22 A. Attard 8-E-23 ACRS(10)
OPA 2-G-5 OC/LMFB MNBB-9112 B. Wilson RII L. Reyes RII
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 202 License No. DPR-52
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated May 13, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9207100077 920702 PDR ADOCK 05000260 P PDR
- 2. Accordingly, the license is amended by changes to the Technical Specifi cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-52 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 202 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance. This amendment is temporary and expires at the end of the current fuel cycle (Cycle 6).
FOR THE NUCLEAR REGULATORY COMMISSION Frederick J. Hebdon, Director Project Directorate 11-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: July 2, 1992
ATTACHMENT TO LICENSE AMENDMENT NO.202 FACILITY OPERATING LICENSE NO. DPR-52 DOCKET NO. 50-260 Revise the Appendix A Technical Specifications by removing the pages identi fied below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 3.2/4.2-26 3.2/4.2-26 3.2/4.2-27 3.2/4.2-27 3.2/4.2-27a*
3.2/4.2-27b*
3.2/4.2-67 3.2/4.2-67**
3.2.4.2-68 3.2/4.2-68 3.5/4.5-18 3.5/4.5-18**
3.5/4.5-19 3.5/4.5-19
NOTES FOR TABLE 3.2.*C"
- 1. The minimum number of OPERABLE channels for each trip function is detailed for the STARTUP and RUN positions of the reactor mode selector switch. The SRM, IRM, and APRM (STARTUP mode), blocks need not be OPERABLE in "RUN" mode, and the APRM (flow biased) rod blocks need not be OPERABLE in "STARTUP" mode.
With the number of OPERABLE channels less than required by the minimum OPERABLE channels per trip function requirement, place at least one inoperable channel in the tripped condition within one hour.
- 2. W is the recirculation loop flow in percent of design. Trip level setting is in percent of rated power (3293 MWt).
- 3. IRM downscale is bypassed when it is on its lowest range.
- 4. SRMs A and C downscale functions are bypassed when IRMs A, C, E, and G are above range 2. SRMs B and D downscale function is bypassed when IRMs B, D, F, and H are above range 2.
SRM detector not in startup position is bypassed when the count rate is 1100 CPS or the above condition is satisfied.
- 5. During repair or calibration of equipment, not more than one SRM or RBM channel nor more than two APRM or IRM channels may be bypassed.
Bypassed channels are not counted as OPERABLE channels to meet the minimum OPERABLE channel requirements. Refer to section 3.10.B for SRM requirements during core alterations.
- 6. IRM channels A, E, C, G all in range 8 or above bypasses SRM channels A and C functions.
IRM channels B, F, D, H all in range 8 or above bypasses SRM channels B and D functions.
- 7. The following operational restraints apply to the RBM only.
- a. Both RBM channels are bypassed when reactor power is 130 percent or when a peripheral (edge) control rod is selected.
- b. The RBM need not be OPERABLE in the "startup" position of the reactor mode selector switch.
- c. Two RBM channels are provided and only one of these may be bypassed with the console selector. The other channel may also be defeated only if the conditions of "e" or "f" are met. If the inoperable channel cannot be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and the conditions of "e" or "f" are not met, the inoperable channel shall be placed in the tripped condition within one hour.
- The provisions of Note 7e and 7f are applicable during unit 2 cycle 6 only.
BFN 3.2-4.2-26 Amendment 202 Unit 2
NOTES FOR TABLE 3.2.i-(-Cont'd)
- 7. (Continued)
- d. With both RBM channels inoperable, and the conditions of "e" or "f" not met, place at least one inoperable rod block monitor channel in the tripped condition within one hour.
- e. The RBM need not be OPERABLE when reactor power is 190 percent and MCPR is 21.40.
- f. The RBM need not be OPERABLE when reactor power is <90 percent and MCPR is Ž1.70.
- 8. This function is bypassed when the mode switch is placed in RUN.
- 9. This function is only active when the mode switch is in RUN. This function is automatically bypassed when the IRM instrumentation is OPERABLE and not high.
- 10. The inoperative trips are produced by the following functions:
- a. SRM and IRM (1) Local "operate-calibrate" switch not in operate.
(2) Power supply voltage low.
(3) Circuit boards not in circuit.
- b. APRM (1) Local "operate-calibrate" switch not in operate.
(2) Less than 14 LPRM inputs.
(3) Circuit boards not in circuit.
- c. RBM (1) Local "operate-calibrate" switch not in operate.
(2) Circuit boards not in circuit.
(3) RBM fails to null.
(4) Less than required number of LPRM inputs for rod selected.
- 11. Detector traverse is adjusted to 114 +/- 2 inches, placing the detector lower position 24 inches below the lower core plate.
- The provisions of Note 7e and 7f are applicable during unit 2 cycle 6 only.
BFN 3.2/4.2-27 Amendment 202 Unit 2
NOTES FOR TABLE 3.2,C (Cont'd)
- 12. This function may be bypassed in the SHUTDOWN or REFUEL mode. If this function is inoperable at a time when OPERABILITY is required the channel shall be tripped or administrative controls shall be immediately imposed to prevent control rod withdrawal.
- 13. RBM upscale flow-biased setpoint clipped at 106 percent rated reactor power.
BFN 3.2/4.2-27a I Amendment 202 Unit 2
THIS PAGE INTENTIONALLY LEFT BLANK BFN 3.2/4.2-27b j Amendment 202 Unit 2
3.2 BASES (Cont'd) flow instrumentation is a backup to the temperature instrumentation. In the event of a loss of the reactor building ventilation system, radiant heating in the vicinity of the main steam lines raises the ambient temperature above 200*F. The temperature increases can cause an unnecessary main steam line isolation and reactor scram. Permission is provided to bypass the temperature trip for four hours to avoid an unnecessary plant transient and allow performance of the secondary containment leak rate test or make repairs necessary to regain normal ventilation.
High radiation monitors in the main steam line tunnel have been provided to detect gross fuel failure as in the control rod drop accident. With the established nominal setting of three times normal background and main steam line isolation valve closure, fission product release is limited so that 10 CFR 100 guidelines are not exceeded for this accident. Reference Section 14.6.2 FSAR. An alarm with a nominal setpoint of 1.5 x normal full-power background is provided also.
Pressure instrumentation is provided to close the main steam isolation valves in RUN Mode when the main steam line pressure drops below 825 psig.
The HPCI high flow and temperature instrumentation are provided to detect a break in the HPCI steam piping. Tripping of this instrumentation results in actuation of HPCI isolation valves. Tripping logic for the high flow is a 1-out-of-2 logic, and all sensors are required to be OPERABLE.
High temperature in the vicinity of the HPCI equipment is sensed by four sets of four bimetallic temperature switches. The 16 temperature switches are arranged in two trip systems with eight temperature switches in each trip system. Each trip system consists of two elements. Each channel contains one temperature switch located in the pump room and three temperature switches located in the torus area. The RCIC high flow and high area temperature sensing instrument channels are arranged in the same manner as the HPCI system.
The HPCI high steam flow trip setting of 90 psid and the RCIC high steam flow trip setting of 450" H2 0 have been selected such that the trip setting is high enough to prevent spurious tripping during pump startup but low enough to prevent core uncovery and maintain fission product releases within 10 CFR 100 limits.
The HPCI and RCIC steam line space temperature switch trip settings are high enough to prevent spurious isolation due to normal temperature excursions in the vicinity of the steam supply piping. Additionally, these trip settings ensure that the primary containment isolation steam supply valves isolate a break within an acceptable time period to prevent core uncovery and maintain fission product releases within 10 CFR 100 limits.
High temperature at the Reactor Water Cleanup (RWCU) System in the main steam valve vault, RWCU pump room 2A, RWCU pump room 2B, RWCU heat exchanger room or in the space near the pipe trench containing RWCU piping could indicate a break in the cleanup system. When high temperature occurs, the cleanup system is isolated.
BFN 3.2/4.2-67 AMENDMEWI" NO. 189 Unit 2
3.2 BASES (Cont'd)
- The instrumentation which initiates CSCS action is arranged in a dual bus system. As for other vital instrumentation arranged in this fashion, the specification preserves the effectiveness of the system even during periods when maintenance or testing is being performed. An exception to this is when logic functional testing is being performed.
The control rod block functions are provided to prevent excessive control rod withdrawal so that MCPR does not decrease to 1.07. The trip logic for this function is 1-out-of-n: e.g., any trip on one of six APRMs, eight IRMs, or four SRMs will result in a rod block.
A General Electric study, GE-NE-770-06-0392 shows for the unit 2 cycle 6 core that if the initial MCPR is as specified in item 7e or 7f of Table 3.2.C, then no single rod withdrawal error can cause the MCPR to decrease below the MCPR safety limit. When core operating conditions have been verified to be within the limits of items 7e or 7f of Table 3.2.C, the RBM is not required. When the RBM is required, the minimum instrument channel requirements apply. These requirements assure sufficient instrumentation to assure the single failure criteria is met. The minimum instrument channel requirements for the RBM may be reduced by one for maintenance, testing, or calibration. This does not significantly increase the risk of an inadvertent control rod withdrawal, as the other channel is available, and the RBM is a backup system to the written sequence for withdrawal of control rods.
The APRM rod block function is flow biased and prevents a significant reduction in MCPR, especially during operation at reduced flow. The APRM provides gross core protection; i.e., limits the gross core power increase from withdrawal of control rods in the normal withdrawal sequence. The trips are set so that MCPR is maintained greater than 1.07.
The RBM rod block function provides local protection of the core; i.e.,
the prevention of critical power in a local region of the core, for a single rod withdrawal error from a limiting control rod pattern.
If the IRM channels are in the worst condition of allowed bypass, the sealing arrangement is such that for unbypassed IRN channels, a rod block signal is generated before the detected neutrons flux has increased by more than a factor of 10.
A downscale indication is an indication the instrument has failed or the instrument is not sensitive enough. In either case the instrument will not respond to changes in control rod motion and thus, control rod motion is prevented.
The refueling interlocks also operate one logic channel, and are required for safety only when the mode switch is in the refueling position.
For effective emergency core cooling for small pipe breaks, the HPCI system must function since reactor pressure does not decrease rapid enough to allow either core spray or LPCI to operate in time. The automatic pressure relief function is provided as a backup to the HPCI in the event the HPCI does not operate. The arrangement of the tripping contacts is such as to provide this function when necessary and minimize spurious operation. The trip settings given in the specification are BFN 3/2/4.2-68 Amendment 202 Unit 2
3.5/4.5 CORE AND CG,_.AINMENT COOLING SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.5.1 Average Planar Linear Heat 4.5.1 Maximum Ma ..i u .
Average Planar
.ra . ......
Generation Rate Linear Heat Generation Rate (MAPLHGR)
During steady-state power operation, The MAPLHGR for each type of the Maximum Average Planar Linear fuel as a function of average Heat Generation Rate (MAPLHGR) for planar exposure shall be each type of fuel as a function of determined daily during average planar exposure shall not reactor operation at . 25%
exceed the limiting value shown in rated thermal power.
I Tables 3.5.1-1, 2, 3, and 4. If at any time during operation it I is determined by normal surveillance that the limiting value for MAPLHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the I MAPLHGR is not returned to within the prescribed limits within two (2) hours, the reactor shall be brought to the COLD SHUTDOWN CONDITION within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Surveillance and corresponding action shall continue until reactor operation is within the prescribed limits.
J. Linear Heat Generation Rate (LHGR) J. Linear Heat Generation Rate (LHGR)
During steady-state power operation, The LHGR shall be checked the linear heat generation rate (LHGR) daily during reactor fuel of any rod in any fuel assembly at operation at 2 25% rated any axial location shall not exceed thermal power.
13.4 kW/ft. If at any time during operation it is determined by normal surveillance that the limiting value for LHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within two (2) hours, the reactor shall be brought to the COLD SHUTDOWN CONDITION within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Surveillance and corresponding action shall continue until reactor operation is within the prescribed limits.
BFN 3.5/4.5-18 AMENDMEfT NO. 1 7 2 Unit 2
3,5/4.5 CORE AND CONTAINMENT COOLING SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REOUIREMENTS LIMITING CONDITIONS FOR OPERATION 3.5.K Minimum Critical Power Ratio 4.5.K Minimum Critical Power (MCPR) Ratio (MCPR)
Except when the provisions of Note 1. MCPR shall be determined daily 7 of Table 3.2.C are being employed during reactor power operation due to the inoperability of the Rod at 2 25% rated thermal power Block Monitor, the minimum critical and following any change in power ratio (MCPR) as a function of power level or distribution scram time and core flow, shall be that would cause operation equal to or greater than shown in with a limiting control rod Figure 3.5.K-1 multiplied by the pattern as described in the Kf shown in Figure 3.5.2, where: bases for Specification 3.3.
Y= 0 or lave- % , whichever is 2. Except as provided by Note 7 TA - T*B greater of Table 3.2.C, the MCPR limit I shall be determined for each A = 0.90 sec (Specification 3.3.C.1 fuel type 8X8, 8X8R, P8X8R, scram time limit to 20% insertion from Figure 3.5.K-1, from fully withdrawn) respectively, using:
1B = 0.710+1.65 nj (0.053) [Ref.2]
n,., 7 1, I ave - S= 1n a. T= 0.0 prior to initial scram time measurements for the cycle, performed n = number of surveillance rod in accordance with tests performed to date in Specification 4.3.C.l.
cycle (including BOC test).
- b. I'as defined in Specifi 0i = Scram time to 20% insertion from cation 3.5.K following the fully withdrawn of the ith rod. conclusion of each scram time surveillance test re N= total number of active rods quired by Specifications measured in Specification 4.3.C.1 and 4.3.C.2.
4.3.C.1 at BOC.
The determination of the If at any time during steady-state limit must be completed operation it is determined by normal within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of each surveillance that the limiting scram-time surveillance value for MCPR is being exceeded, required by Specification action shall be initiated within 4.3.C.
15 minutes to restore operation to within the prescribed limits. If the steady-state MCPR is not returned to within the prescribed limits within two (2) hours, the reactor shall be brought to the Cold Shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, surveillance and corresponding action shall continue until reactor operation is within the prescribed limits.
BFN 3.5/4.. 5-19 Amendment 202 Unit 2
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 ENCLOSURE 2 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 202 TO FACILITY OPERATING LICENSE NO. DPR-52 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-260
1.0 INTRODUCTION
By letter dated May 13, 1992, the Tennessee Valley Authority (the licensee) submitted a request to change the Browns Ferry Nuclear Plant (BFN) Unit 2 Technical Specifications. The proposed changes revise Technical Specification (TS) Table 3.2.C, TS 3.5.K, and TS 4.5.K.2, modifying the operability require ments for the Rod Block Monitor (RBM) system if sufficient thermal margin, as measured by the Minimum Critical Power Ratio (MCPR), can be maintained. These changes were requested because BFN Unit 2 has experienced an unusually large number of failures of Local Power Range Monitor (LPRM) instruments which threaten the continued operability of the RBM. The RBM operability issue will be resolved when LPRM problems are addressed during the upcoming BFN Unit 2 refueling outage. Therefore, the amendment is a temporary change, and expires at the end of the current fuel cycle (Cycle 6).
To support its request, TVA submitted the proposed TS changes, a description and evaluation of the physical and analytical changes, and a General Electric Company (GE) proprietary report (GE-NE-770-06-0392) on the operability requirements for a revised RBM operational analyses for BFN Unit 2 Cycle 6.
The changes requested by TVA are similar to those requested by other utili ties, such as Hatch 1 and 2, Monticello, and Fermi 2.
2.0 EVALUATION 2.1 Rod Block Monitor System The Rod Block Monitor System is used to prevent violation of fuel thermal hydraulic limits in the event of inadvertent continuous withdrawal of a control rod. When a control rod is selected for withdrawal, the surrounding Local Power Range Monitor (LPRM) strings are selected. The RBM system monitors their response to the withdrawal, and will block the withdrawal if that response exceeds certain limits.
In the submittal for BFN Unit 2, TVA proposed changes to the RBM system that are generally identical to those changes previously reviewed and approved for other facilities, including changes to the instrumentation system and the new approaches, analyses and setpoints.
9207100080 920702 PDR ADOCK 05000260 P PDR
2.2 MCPR Requirements The function of the RBM system is to assist the operator in safe plant operation in the power range by:
- a. initiating a rod block to prevent violation of the fuel integrity safety criteria during withdrawal of a single control rod, and
- b. provide a signal to permit operator evaluation of the change in the local relative power during control rod movement.
The probability of an administrative error in selection of rods for withdrawal is not increased, because the proposed amendment only changes the range of the allowable values for the initial MCPR during rod withdrawal. The proposed amendment does not revise the administrative limitations on the selection and withdrawal of rods. GE's analyses showed that, even if the RBM did not intervene, the MCPR would not decrease below the allowable safety limit if the operator withdrew one or more rods erroneously while operating the core within the MCPR limits proposed by this amendment. GE also showed that the proposed initial MCPR requirements during rod withdrawal are bounded by previously analyzed limits and thus do not violate the thermal margin requirements based on other analyzed transients.
The data base as described in the GE report was used to determine the MCPR operating limits with the condition that no rod withdrawal error could lead to exceeding MCPR safety limits. The results of the analysis demonstrated that additional limits on thermal mechanical margin were not required. The analysis also showed that the following limiting MCPR values would provide the required margin for full withdrawal of any control rod:
- a. MCPR greater than or equal to 1.40 with the reactor power greater than or equal to 90 percent of rated thermal power, and
- b. MCPR greater than or equal to 1.70 with the reactor power less than 90 percent of rated thermal power.
Thus, when the operating MCPR is within these limits, the RBM is allowed to be bypassed completely because it is not required to be operable. When the operating MCPR is below these values, the plant is operating with a "limiting control rod pattern," and the RBM system must be operable.
We have reviewed these changes and analyses for the RBM and have concluded that the analyses, methods used, criteria, and setpoints are acceptable.
2.3 Technical Specification Changes Implementing the hardware changes and revised analyses described above requires changes in the BFN Unit 2 Technical Specifications. These changes allow the RBM to be inoperable when the MCPR is within specified limits, and will expire at the end of the current fuel cycle. These changes are discussed below.
Limiting Condition for Operation Table 3.2.C Notes 7.e. and 7.f. are added to provide the thermal margin limits that permit the RBM to be inoperable. These notes read as follows:
7.e. "The RBM need not be OPERABLE when reactor power is greater or equal to 90 percent and the MCPR is greater than or equal to 1.40."
7.f. "The RBM need not be OPERABLE when reactor power is less than 90 percent and the MCPR is greater than or equal to 1.70."
Notes 7.c. and 7.d. are revised to include references to the new notes 7.e.
and 7.f.
Note 7.a. is revised by adding the word "edge" to clarify the meaning of "peripheral control rod." This clarification is acceptable.
These changes to Table 3.2.C and the associated bases are based on the GE study, GE-NE-770-06-0392, for BFN Unit 2 Cycle 6. The study shows that if the initial MCPR is as specified in item 7.e. and 7.f. of Table 3.2.C, then no single rod withdrawal error can cause the MCPR to decrease below the MCPR safety limit. Also, when the core operating conditions have been verified to be within the limits of items 7.e. and 7.f. of Table 3.2.C, the RBM is not required. When the RBM is required, the minimum instrument channel require ments apply. These changes also include requirements for sufficient instru inentation to ensure that the single failure criteria are met.
Limiting Condition for Operation 3.5.K and Surveillance Requirement 4.5.k.2 The change to section 3.5.K stipulates that except when the provisions of note 7 to Table 3.2.C are being employed due to the inoperability of the Rod Block Monitor, the minimum critical power ratio (MCPR) as a function of scram time and core flow, shall be equal to or greater than that shown in TS Figure 3.5.k-1 multiplied by the Kf shown in TS Figure 3.5.2.
The change to section 4.5.K.2 stipulates that except as provided by note 7 of Table 3.2.C, the MCPR safety limit shall be determined for each fuel type.
The changes to the TS allow control rod withdrawal operations appropriate for proper core management at times when thermal margin is sufficient to obviate the need for the RBM. The staff reviewed the analyses provided by TVA and found that the proposed changes are safe, because when no RBM channels are operable, control rods can be withdrawn only during those conditions in which the MCPR is high enough that the RBM need not intervene.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Alabama State official was notified of the proposed issuance of the amendment. The State Official had no comments.
4.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no signifi cant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (57 FR 21833). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR Part 51.22(c)(9). Pursuant to 10 CFR Part 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 CONCLUSION
The NRC staff has reviewed the reports submitted by TVA for the continued operation of BFN Unit 2 Cycle 6 and concludes that the appropriate material was submitted for Technical Specification changes pertaining to the inopera bility of the RBM system. GE's study has shown that these new thermal limits can be met. Therefore, we conclude that the requested TS changes satisfy the staff's positions and requirements in these areas.
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security, or to the health and safety of the public.
Principal Contributor: A. Attard Date: July 2, 1992