Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23319A199 | 3 January 2024 | Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves | Incorporated by reference Surveillance Frequency Control Program |
ML23257A123 | 22 September 2023 | Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 | |
ML23205A213 | 8 September 2023 | Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 | |
ML23171A886 | 24 July 2023 | Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Surveillance Frequency Control Program |
ML23116A247 | 23 May 2023 | Issuance of Amendment Nos. 330, 353, and 313 Regarding Adoption of TSTF-478, Revision 2 for Combustible Gas Control | |
ML23101A110 | 16 May 2023 | Issuance of Amendment Nos. 329, 352, and 312 Regarding Removal of Site Acreage Description from Technical Specifications | |
ML23073A290 | 2 May 2023 | Issuance of Amendment Nos. 328, 351, and 311 Adoption of TSTF-505, Revision 2, for Risk-Informed Completion Times and TSTF-439, Revision 2, to Eliminate Second Completion Times | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program Offsite Circuit |
ML22348A005 | 25 January 2023 | Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements | Cyber Security Pressure Boundary Leakage Fire Protection Program |
ML22349A647 | 20 January 2023 | Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules | Time of Discovery Cyber Security Fire Protection Program |
ML22348A066 | 13 January 2023 | Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary | Shutdown Margin Stroke time Anticipated operational occurrence Incorporated by reference Finite Element Analysis Abnormal operational transient Feedwater Controller Failure MELLLA Time Critical Operator Action Fuel cladding Power change |
ML22271A914 | 7 December 2022 | Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme | Operating Basis Earthquake Earthquake |
ML22327A018 | 1 December 2022 | Correction of Error Incurred During Issuance of License Amendment No. 322 | Surveillance Frequency Control Program |
ML22273A103 | 22 November 2022 | Issuance of Amendment Nos. 323, 346, and 306 Regarding Chilled Water Cross-Tie Modification | Safe Shutdown GOTHIC |
ML22220A260 | 21 November 2022 | Issuance of Amendment Nos. 322, 345, and 305 Regarding Adoption of TSTF Traveler TSTF-205-A, Rev. 3, and TSTF-563-A | Reactor Vessel Water Level Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Large early release frequency |
ML22138A325 | 24 June 2022 | Issuance of Amendment Nos. 321, 344, and 304 Regarding Spent Fuel Pool Criticality Safety Analysis | |
ML22020A228 | 16 March 2022 | Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 | |
ML21285A068 | 28 October 2021 | Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML21214A139 | 30 August 2021 | Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters | Safe Shutdown Anticipated operational occurrence |
ML21173A177 | 27 July 2021 | Issuance of Amendment Nos. 317, 340, and 300 Regarding Adoption of Title 10 of the Code of Federal Register Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components | Hot Short Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Flood Hazard Mitigation Strategies Assessment |
ML21075A076 | 30 April 2021 | Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis | Safe Shutdown High winds Tornado Missile Probabilistic Risk Assessment FLEX Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Large early release frequency TORMIS Tornado Missile Risk Evaluator Fuel cladding |
ML21041A489 | 8 April 2021 | Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 | |
ML20268A082 | 12 January 2021 | Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications | Cyber Security Fire Protection Program |
ML20282A345 | 19 November 2020 | Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements | |
ML20190A105 | 11 August 2020 | Correction to Amendment No. 319 Regarding Revisions to Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation | Water Inventory Control |
ML20085G896 | 26 June 2020 | Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times | |
ML19294A011 | 26 December 2019 | Issuance of Amendment Nos. 311, 334, and 294 Adopt Technical Specifications Task Force Traveler, TSTF-542, Revision 2 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Water Inventory Control Hydrostatic Incorporated by reference Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
ML18277A110 | 27 August 2019 | Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection | Safe Shutdown Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Open Phase Condition Fire Protection Program |
ML19198A001 | 13 August 2019 | Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) | Fire Barrier Cyber Security Fire Protection Program |
ML19037A137 | 2 April 2019 | Revisions to Modifications 85, 102 and 106 Related to National Fire Protection Association 805 Performance-based Standard for Fire Protection of Light Water Reactor Electric Generating Plants | Fire Barrier Cyber Security Fire Protection Program |
ML18241A319 | 9 October 2018 | Issuance of Amendment Nos. 306, 329, and 289 to Revise Approved NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants-Revision | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Cyber Security Fire Protection Program |
ML18251A003 | 27 September 2018 | Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) | Safe Shutdown High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier Fire Protection Program Very Early Warning Fire Detection Grace period |
ML18138A452 | 29 May 2018 | Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 | Spent Fuel Pool Instrumentation |
ML17289A032 | 22 December 2017 | Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) | High winds Ultimate heat sink Water Inventory Control Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML17215A243 | 2 October 2017 | Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) | |
ML17032A120 | 14 August 2017 | Non-Proprietary Issuance of Amendments Regarding Extended Power Uprate | |
ML17034A360 | 27 March 2017 | Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... | |
ML17052A136 | 16 March 2017 | Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Issuance of Amendment Nos. 297, 321, and 281 to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (CAC Nos. MF8125, MF8126, and MF8127) | Cyber Security |
ML16330A158 | 17 January 2017 | Issuance of Amendments Regarding Revisions to Technical Specification 4.3.1.2, Fuel Storage Criticality | |
ML16028A414 | 26 April 2016 | Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML15317A478 | 9 February 2016 | Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence |
ML15344A321 | 7 January 2016 | Issuance of Amendment Regarding Modification of Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits | Hydrostatic Aging Management |
ML15321A472 | 23 December 2015 | Issuance of Amendments Regarding Revision to Table 3.3.6.1-1, Primary Containment Isolation Instrumentation | |
ML15287A213 | 16 December 2015 | Issuance of Amendments Regarding Technical Specification Changes to Reactor Core Safety Limits | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML15324A247 | 14 December 2015 | Issuance of Amendment to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Valves to Licensee Control | |
ML15287A371 | 4 December 2015 | Issuance of Amendments for the Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-535 (CNL-15-029) | Shutdown Margin Anticipated operational occurrence Power change |
ML15212A796 | 28 October 2015 | Issuance of Amendments to Transition to Fire Protection Program NFPA-805 | Hot Short Safe Shutdown Fire Barrier Time to boil Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operator Manual Action Cyber Security Multiple Spurious Operation B.5.b Significance Determination Process Thermoset Large early release frequency Safeguards Contingency Plan Hemyc Exemption Request Fire Protection Program Very Early Warning Fire Detection Fatality Unidentified leakage Power Uprate Exclusive Use |
ML15251A540 | 29 September 2015 | Issuance of Amendment Regarding Control Rod Scram Time Testing Frequency Per TSTF-460, Revision 0 | |
ML15065A049 | 2 June 2015 | Issuance of Amendment Revising Pressure and Temperature Limit Curves | Hydrostatic Pressure and Temperature Limits Report |
ML13254A081 | 13 September 2013 | Issuance of Amendment Under Exigent Circumstances to Remove Notes from Technical Specifications 3.4.9-1 and 3.4.9-2 | Hydrostatic |
ML13199A221 | 30 August 2013 | Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals | Incorporated by reference |