ML23101A110
| ML23101A110 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/16/2023 |
| From: | Kimberly Green Plant Licensing Branch II |
| To: | Jim Barstow Tennessee Valley Authority |
| Green K | |
| References | |
| EPID L-2022-LLA-0144 | |
| Download: ML23101A110 (21) | |
Text
May 16, 2023 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 329, 352, AND 312 REGARDING REMOVAL OF SITE ACREAGE DESCRIPTION FROM TECHNICAL SPECIFICATIONS (EPID L-2022-LLA-0144)
Dear Mr. Barstow:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 329, 352, and 312 to Renewed Facility Operating Licenses Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant, Units 1, 2, and 3, respectively. These amendments are in response to your application dated September 29, 2022. The amendments revise the Browns Ferry Nuclear Plant, Units 1, 2, and 3, Technical Specification 4.1, Site Location, to remove the description of the site acreage.
A copy of the Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296
Enclosures:
- 1. Amendment No. 329 to DPR-33
- 2. Amendment No. 352 to DPR-52
- 3. Amendment No. 312 to DPR-68
- 4. Safety Evaluation cc: Listserv
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 329 Renewed License No. DPR-33
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Tennessee Valley Authority (the licensee) dated September 29, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-33 is hereby amended to read, in part, as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 329, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 16, 2023 David J.
Wrona Digitally signed by David J. Wrona Date: 2023.05.16 12:40:22 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 329 BROWNS FERRY NUCLEAR PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-33 DOCKET NO. 50-259 Replace page 3 of Renewed Facility Operating License No. DPR-33 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the areas of change.
Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 4.0-1 4.0-1
BFN-UNIT 1 Renewed License No. DPR-33 Amendment No. 329 (3)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5)
Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 329, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 234 to Facility Operating License DPR-33, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 234. For SRs that existed prior to Amendment 234, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 234.
Design Features 4.0 (continued)
BFN-UNIT 1 4.0-1 Amendment No. 234, 247, 329 4.0 DESIGN FEATURES 4.1 Site Location The BFN site is located on the north shore of Wheeler Lake at Tennessee River Mile 294 in Limestone County, Alabama. The minimum distance from the outside of the secondary containment building to the boundary of the exclusion area as defined in 10 CFR 100.3 is 4000 feet.
4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor shall contain 764 fuel assemblies. Each assembly shall consist of a matrix of Zircalloy fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material, and water rods or channels. Limited substitutions of zirconium alloy or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with NRC staff approved codes and methods and have been shown by tests or analyses to comply with all safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
4.2.2 Control Rod Assemblies The reactor core shall contain 185 cruciform shaped control rod assemblies. The control material shall be boron carbide, hafnium metal, or both, as approved by the NRC.
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 352 Renewed License No. DPR-52
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated September 29, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-52 is hereby amended to read, in part, as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 352, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 16, 2023 David J.
Wrona Digitally signed by David J. Wrona Date: 2023.05.16 12:40:48 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 352 BROWNS FERRY NUCLEAR PLANT, UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-52 DOCKET NO. 50-260 Replace page 3 of Renewed Facility Operating License No. DPR-52 with the attached page 3.
The revised page is identified by amendment number and contains a marginal line indicating the areas of change.
Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 4.0-1 4.0-1
BFN-UNIT 2 Renewed License No. DPR-52 Amendment No. 352 sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5)
Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 352, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 253 to Facility Operating License DPR-52, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 253. For SRs that existed prior to Amendment 253, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 253.
- 3)
The licensee is authorized to relocate certain requirements included in Appendix A and the former Appendix B to licensee-controlled documents.
Implementation of this amendment shall include the relocation of these requirements to the appropriate documents, as described in the licensee's
Design Features 4.0 BFN-UNIT 2 4.0-1 (continued)
Amendment No. 253, 284, 352 4.0 DESIGN FEATURES 4.1 Site Location The BFN site is located on the north shore of Wheeler Lake at Tennessee River Mile 294 in Limestone County, Alabama. The minimum distance from the outside of the secondary containment building to the boundary of the exclusion area as defined in 10 CFR 100.3 is 4000 feet.
4.2 Reactor Core 4.2.1.
Fuel Assemblies The reactor shall contain 764 fuel assemblies. Each assembly shall consist of a matrix of Zircalloy fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material, and water rods or channels. Limited substitutions of zirconium alloy or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with NRC staff approved codes and methods and have been shown by tests or analyses to comply with all safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
4.2.2 Control Rod Assemblies The reactor core shall contain 185 cruciform shaped control rod assemblies. The control material shall be boron carbide, hafnium metal, or both, as approved by the NRC.
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 312 Renewed License No. DPR-68
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Tennessee Valley Authority (the licensee) dated September 29, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-68 is hereby amended to read, in part, as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 312, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: May 16, 2023 David J.
Wrona Digitally signed by David J. Wrona Date: 2023.05.16 12:41:14 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 312 BROWNS FERRY NUCLEAR PLANT, UNIT 3 RENEWED FACILITY OPERATING LICENSE NO. DPR-68 DOCKET NO. 50-296 Replace page 3 of Renewed Facility Operating License No. DPR-68 with the attached page 3.
The revised page is identified by amendment number and contains a marginal line indicating the areas of change.
Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 4.0-1 4.0-1
BFN-UNIT 3 Renewed License No. DPR-68 Amendment No. 312 (3)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5)
Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 312, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 212 to Facility Operating License DPR-68, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 212. For SRs that existed prior to Amendment 212, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 212.
Design Features 4.0 BFN-UNIT 3 4.0-1 4.0 DESIGN FEATURES 4.1 Site Location The BFN site is located on the north shore of Wheeler Lake at Tennessee River Mile 294 in Limestone County, Alabama. The minimum distance from the outside of the secondary containment building to the boundary of the exclusion area as defined in 10 CFR 100.3 is 4000 feet.
4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor shall contain 764 fuel assemblies. Each assembly shall consist of a matrix of Zircalloy fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material, and water rods or channels. Limited substitutions of zirconium alloy or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with NRC staff approved codes and methods and have been shown by tests or analyses to comply with all safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
4.2.2 Control Rod Assemblies The reactor core shall contain 185 cruciform shaped control rod assemblies. The control material shall be boron carbide, hafnium metal, or both, as approved by the NRC.
(continued)
Amendment No. 212, 242, 312
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 329, 352, AND 312 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-33, DPR-52, AND DPR-68 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DOCKET NOS. 50-259, 50-260, AND 50-296
1.0 INTRODUCTION
By application dated September 29, 2022 (Agencywide Documents Access and Management System Accession No. ML22276A089), the Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) to the U.S. Nuclear Regulatory Commission (NRC or the Commission) to revise the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3, Technical Specification (TS) 4.1, Site Location, to remove the description of the site acreage.
2.0 REGULATORY EVALUATION
2.1 Site Description Section 2.2.1 of the Browns Ferry Updated Final Safety Analysis Report (ML21286A275) describes the site as being located on the north shore of Wheeler Lake at river mile 294 in Limestone County in north Alabama, approximately 10 miles southwest of Athens, Alabama, and 10 miles northwest of the center of Decatur, Alabama. It also states that the site contains approximately 840 acres which are owned by the United States and are in the custody of TVA, and the site has been developed to accommodate three units.
2.2 Proposed Change to the Technical Specifications The licensee proposed to delete the description of the site acreage from TS 4.1 as shown below. The proposed deletion is shown in strikethrough text.
The BFN site contains approximately 840 acres and is located on the north shore of Wheeler Lake at Tennessee River Mile 294 in Limestone County, Alabama.
The minimum distance from the outside of the secondary containment building to the boundary of the exclusion area as defined in 10 CFR 100.3 is 4000 feet.
2.3 Applicable Regulatory Requirements and Guidance Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(a)(1) requires, in part, each applicant for a license authorizing operation of a utilization facility to include in the application the proposed TSs.
The regulation at 10 CFR 50.36(b) requires:
Each license authorizing operation of a utilization facility will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to [10 CFR] 50.34 [Contents of applications; technical information]. The Commission may include such additional technical specifications as the Commission finds appropriate.
The regulation at 10 CFR 50.36(c)(4) requires TSs to include design features, which are those features of the facility such as materials of construction and geometric arrangements, which, if altered or modified, would have a significant effect on safety and are not covered in categories described in paragraphs (c) (1), (2), and (3) of this section [10 CFR 50.36].
The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), dated March 2010 (ML100351425).
The NRCs, Standard Technical Specifications [(STS)], General Electric Plants, BWR/4 NUREG-1433, Volume 1, Specifications, and Volume 2, Bases, Revision 5.0, dated September 2021 (ML21272A357 and ML21272A358, respectively), provide STS for General Electric BWR/4-designed reactors and are applicable to Browns Ferry Units 1, 2, and 3. The NRC staffs review includes consideration of whether the proposed changes are consistent with the applicable reference STS (i.e., the current STS), as modified by NRC-approved Travelers.
3.0 TECHNICAL EVALUATION
The NRC staff evaluated the licensees LAR to determine if the proposed change is consistent with the regulations, guidance, and plant-specific design and licensing basis information discussed in Section 2.3 of this safety evaluation.
As described Section 2.2 of this safety evaluation, the licensee proposed to remove the site acreage description contained in the Browns Ferry Units 1, 2, and 3 TS 4.1, Site Location.
The NRC STS for General Electric BWR/4 plants (NUREG-1433) contains general guidance for what information is to be provided in STS Section 4.1, Site Location (see the following bracketed information):
[Text description of site location.]
In fact, all NRC STS for operating reactors (i.e., NUREG-1430 through NUREG-1434) identify the same bracketed information without specific guidance.
Section 182a of the Atomic Energy Act of 1954 (the Act) requires the inclusion of technical specifications in licenses for production and utilization facilities. Section 182a requires that applicants for nuclear power plant operating licenses will provide:
[S]uch technical specifications, including information of the amount, kind, and source of special nuclear material required, the place of the use, the specific characteristics of the facility, and such other information as the Commission may, by rule or regulation, deem necessary in order to enable it to find that the utilization... of special nuclear material will be in accord with the common defense and security and will provide adequate protection to the health and safety of the public. Such technical specifications shall be a part of any license issued.
As described above, the Act requires that technical specifications include information on the place of the use for the special nuclear material. The design features section of STS provides that TS 4.1 should include a text description of site location, which would appear to meet this requirement.
Although the licensees proposed change removes site specific acreage from the Browns Ferry TSs, the Browns Ferry UFSAR Section 2.2, Site Description, (ML21286A275) does contain the site specific acreage. This information is controlled pursuant to 10 CFR 50.71(e) and 10 CFR 50.59.
Based on the information provided in the LAR, the NRC staff concludes that the licensee proposed changes are consistent with NUREG-1433, Section 4.1, Site Location, because the proposed change only removes extraneous information (i.e., site acreage) and retains sufficient information to generally identify the site location on a map. The NRC staff finds the proposed change acceptable because it conforms to guidance provided in Chapter 16.0 of the SRP and NUREG-1433, is considered an administrative clarification that does not alter or modify the facility, does not substantively change TS requirements nor does it have any effect on safety.
Therefore, the NRC staff concludes that Browns Ferry Units 1, 2, and 3, TS 4.1, as revised, will continue to meet the requirements of 10 CFR 50.36(c)(4).
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Alabama State official was notified of the proposed issuance of the amendments on April 5, 2023. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The NRC staff determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The amendments make editorial, corrective, or other minor revisions. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10)(v). The NRC has previously issued a proposed finding that the amendments involve no significant hazards consideration in the Federal Register on November 29, 2022 (87 FR 73342), and there has been no public comment on such finding. Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: C. Ashley, NRR Date: May 16, 2023
ML23101A110 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/STSB/BC NAME KGreen RButler VCusumano DATE 04/11/23 04/17/23 04/10/23 OFFICE OGC - NLO w/comments NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME AGhosh DWrona KGreen DATE 05/02/23 05/16/23 05/16/23