ML22327A018
| ML22327A018 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/01/2022 |
| From: | Kimberly Green Plant Licensing Branch II |
| To: | Jim Barstow Tennessee Valley Authority |
| Green K | |
| References | |
| EPID L-2021-LLA-0217 | |
| Download: ML22327A018 (1) | |
Text
December 1, 2022 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNIT 1 - CORRECTION OF ERROR INCURRED DURING ISSUANCE OF LICENSE AMENDMENT NO. 322 (EPID L-2021-LLA-0217)
Dear Mr. Barstow:
The purpose of this letter is to issue a correction to the Browns Ferry Nuclear Plant (Browns Ferry), Unit 1, Renewed Facility Operating License No. DPR-33.
During issuance of the subject amendment (Agencywide Documents and Management System (ADAMS) Accession No. ML22220A260) on November 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) issued Browns Ferry, Unit 1, TS page 3.3-28 with the word Level missing from Surveillance Requirements (SRs) 3.3.3.2.2 and 3.3.3.2.3. The marked-up pages in the license amendment request dated December 3, 2021 (ML21337A227), showed the SRs with the word Level included.
The NRC concludes that this correction is entirely editorial in nature and does not change the staffs previous conclusion in the safety evaluation for issuance of Amendment No. 322, nor does it affect the no significant hazards considerations, as published in the Federal Register on February 22, 2022 (87 FR 9653).
Enclosed, please find corrected TS page 3.3-28 for Browns Ferry, Unit 1.
If you have any questions regarding this matter, please contact me at (301) 415-1627 or by email at Kimberly.Green@nrc.gov.
Sincerely,
/RA/
Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
Correction to Amendment No. 322 cc: Listserv
ENCLOSURE BROWNS FERRY NUCLEAR PLANT, UNIT NO. 1 DOCKET NO. 50-259 CORRECTED LICENSE AMENDMENT NO. 322 UNIT 1 TECHNICAL SPECIFICATION PAGE 3.3-28
Backup Control System 3.3.3.2 BFN-UNIT 1 3.3-28 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.2.1 Verify each required control circuit and transfer switch is capable of performing the intended function.
In accordance with the Surveillance Frequency Control Program SR 3.3.3.2.2 Perform CHANNEL CALIBRATION for WKH6XSSUHVVLRQ3RRO:DWHULevel
)XQFWLRQ.
In accordance with the Surveillance Frequency Control Program SR 3.3.3.2.
Perform CHANNEL CALIBRATION IRU
HDFKUHTXLUHGLQVWUXPHQWDWLRQFKDQQHO
H[FHSWIRUWKH6XSSUHVVLRQ 3RRO :DWHU Level)XQFWLRQ.
In accordance with the Surveillance Frequency Control Program Amendment No. 234, 263, 234 315322
ML22327A018 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME KGreen RButler DWrona KGreen DATE 11/22/2022 11/22/2022 11/30/2022 12/01/2022