LR-N07-0189, Voluntary Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Voluntary Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations
ML072330308
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/10/2007
From: Kafantaris M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N07-0189, RIS-07-017
Download: ML072330308 (4)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSEG Nu clearLLC AUG 10 2007 RIS 2007-17 LR-N07-0189 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311

Subject:

Voluntary Response to NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations, Dated July 12, 2007 PSEG Nuclear LLC (PSEG) provides its voluntary response to the request for information stated in Reference 1 above. Enclosure 1 to this letter contains the required information for Salem Units 1 and 2.

Should you have any questions regarding this transmittal, please contact E. H. Villar at (856) 339-5456.

Sincerely, Marios C. Kafantaris Manager Training - Salem hil W3 95-2168 REV. 7/99

AUG 1I0 2007 Document Control Desk LR-N07-0189 Enclosures (1)

Mr. Samuel Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 USNRC Resident Inspector Office - Salem (X24)

Mr. R. Ennis, Project Manager - Hope Creek and Salem U. S. Nuclear Regulatory Commission Mail Stop 08B3 11555 Rockville Pike Rockville, MD 20852 Mr. P Mulligan, Manager IV Bureau of Nuclear Engineering P. 0. Box 415 Trenton, NJ 08625

Enclosure 1 LR-N07-0189 SALEM UNITS 1 AND 2 Docket Nos. 50-272 and 50-311 Operator Licensing Examination Data (NRC Form 536) 1

p. .A*

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Salem Nuclear Generating Station One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 11 0 12 0 EXAMINATIONS ESTIMATED NUMBER OF

'NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR 5 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 6 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/25/2008 03/15/2010 ALTERNATE DATE 09/01/2008 03/22/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 12 0 0 0 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER