L-PI-15-108, Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-2

From kanterella
(Redirected from L-PI-15-108)
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-2
ML16012A503
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/11/2016
From: Davison K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-15-108 F3-12, Rev. 22, F3-21, Rev. 15, F3-23-1C U-1, Rev. 13, F3-23-2C U-2, Rev. 14, F3-9, Rev. 27
Download: ML16012A503 (1)


Text

XceIlEnergy January 11,2016 L-PI-1 5-108 10 CFR 50.54(q)(5)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Revised Emercqency Plan Implementingq Procedure (EPIP)

Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 50, Appendix E, Section V, Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter "NSPM"), submits a revision to the Prairie Island Nuclear Generating Plan (PINGP) Emergency Plan Implementing Procedures (EPIPs) as Enclosure 1. A summary of the changes is provided in Enclosure 2. The changes to EPIPs have been reviewed and do not result in a reduction in effectiveness of the Emergency Plan.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Ke¢ Dvson Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company-Minnesota

Enclosures:

(2) cc: Emergency Response Coordinator, Regional Administrator, Region Ill, USNRC (with Enclosures)

Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC (with Enclosures)

Operations Branch ,Chief, Operator Licensing and Emergency Preparedness, Region III USNRC (with Enclosures)

Administrator, Region III, USNRC (with Enclosure 2) 1717 Wakonade Drive East ° Welch, Minnesota 55089-9642 Telephone: 651.388.1121

XceIlEnergy January 11,2016 L-PI-1 5-108 10 CFR 50.54(q)(5)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Revised Emercqency Plan Implementingq Procedure (EPIP)

Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 50, Appendix E, Section V, Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter "NSPM"), submits a revision to the Prairie Island Nuclear Generating Plan (PINGP) Emergency Plan Implementing Procedures (EPIPs) as Enclosure 1. A summary of the changes is provided in Enclosure 2. The changes to EPIPs have been reviewed and do not result in a reduction in effectiveness of the Emergency Plan.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Ke¢ Dvson Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company-Minnesota

Enclosures:

(2) cc: Emergency Response Coordinator, Regional Administrator, Region Ill, USNRC (with Enclosures)

Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC (with Enclosures)

Operations Branch ,Chief, Operator Licensing and Emergency Preparedness, Region III USNRC (with Enclosures)

Administrator, Region III, USNRC (with Enclosure 2) 1717 Wakonade Drive East ° Welch, Minnesota 55089-9642 Telephone: 651.388.1121