Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)
ML20211P611
Person / Time
Site: Beaver Valley
Issue date: 09/03/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-138, NUDOCS 9909140049
Download: ML20211P611 (2)


Text

i

^

SAFEGU ARDS INFORMATION gh Q Beaver Valley Power Station Shippingport. PA 15077 0004 s.n$or vier'."se.ni September 3, 1999 Faz 7 U*NO.l'Eivi. ion L-99-138 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 BVPS Physical Security Plan (PSP)

Enclosed is Revision 37 to issue 4 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) (Base Plan, Safeguards Contingency Plan, and the Traming and Qualification Plan). These changes are being submitted utilizing the criteria described in NRC Generic Letter 95-08. Revision 37 changes include the following:

1. The Base Plan Chapter 1 and Figure 1-1 included a revision to the identified organizational structure. The Senior Vice President Nuclear Services Group is now assigned the executive responsibility for the implementation of the Physical Security Plan in the organizational structure.
2. The Base Plan Chapter 1 was revised to include an increase in the minimum personnel required on shift. The position of a second Response Team Supervisor and the two CAS/SAS Supervisor Relief positions were included in the list of Security personnel assigned to a shift.
3. The Safeguards Contingency Plan Chapters 8 through 14 were revised to update a previously submitted administrative title change from the contractor position of Security Shift Supervisor to that of Security Shift Captain. Also, for consistency, a i reference to Duquesne Light Company in Chapter 14 was replaced with the word j

" licensee" for Events 13A and 13B.

4. The Safegursds Contingency Plan Chapters 4,14 and 16 were revised to correct typographical errors identified for Event 3, Event 13B, and Event 15. '

9909140049 990903 '

PDR ADOCK 05000334 I F PDR ENCLOSURES CONTAIN SAFECUARDS 'h 00 ALIT Y 3.,i,

3{ INFORM ATION. UPON SEPARATION THIS P ACE IS DEC0HTROLLED X( i h E N f,R G V C r\

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION .

I

}- Beaver Valley Power Station, Unit No. I and No. 2 BVPS Physical Security Plan (PSP) l Page 2 These changes have been reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2). j The enclosed materials are considered proprietary under the . provision of 10 CFR  ;

2.790(d), and Safeguards Information under the provisions of 10 CFR 73.21, and are l thereby exempt from public disclosure.

If you have any questions concerning this matter, please contact Mr. M. S. Ackerman at !

(412) 393-5203.

Sincerely, 1

&. ._ ;Dfy -

Sushil C. Jain i

c: Addressee (4 copies of enclosure) ,

Mr. D. S. Collins, Project Manager (w/o enclosure)

Mr. D. M. Kern, Sr. Resident Inspector (w/o enclosme)