L-98-145, Withdraws Proposed Rev 2F to Beaver Valley Unit 2 IST Program in Entirety,Based on Understanding Described

From kanterella
(Redirected from L-98-145)
Jump to navigation Jump to search
Withdraws Proposed Rev 2F to Beaver Valley Unit 2 IST Program in Entirety,Based on Understanding Described
ML20237B360
Person / Time
Site: Beaver Valley
Issue date: 08/12/1998
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-145, NUDOCS 9808180208
Download: ML20237B360 (2)


Text

y*

g Beav Valley Power Station Shippingport, PA 15077 0004 w s SUSHIL C. JAIN August 12, 1998 (412) 393-5512

'* '**(724)843-8 88

    • %'2Se[E*e'.**"' L-98-145 Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 ,

Withdrawal of Proposed Revisi. 2 2F to the Inservice Testing Program By letter dated June 9,1998, Duquesne Light Company (DLC) submitted proposed Revision 2F to the Beaver Valley Power Station Unit 2 (BV-2) Inservice Testing (IST)

, Program. This revision included two (2) relief requests which were submitted to the NRC for review and approval in accordance with 10 CFR 50.55a(a)(3Xii).

The two relief requests concerned testing of the low head safety injection (LHSI) pumps and their associated check valves at the next refueling outage (2R07). DLC believed that the relief requests were necessary, since this outage will not occur within the frequency in Technical Specification 1.21, Table 1.2, which defines "R" (Refueling) as "at least once per 18 months." J On June 30,1998, a telecon between members of the NRC and DLC staffs was held to discuss the subject relief requests. The NRC staff members informed DLC that l the relief requests were unnecessary since a refueling outage testing frequency in the ASME Code only requires testing to be performed during a refueling outage. The basis for this conclusion is that the ASME Code literally specifies refueling outage, which is l an event, not a specific time frequency. Based on this, it is also DLC's understanding l that the ASME Code definition of refueling frequency only applies to the IST Program, l

and does not apply to technical specifications required testing that is to be performed at IO l an "R" frequency. -

DLC has confirmed that BV-2 Technical Specifications Surveillance Requirements 4.5.2.b.2 and 4.0.5 require that the IST Program and the ASME Code be followed for rp Mi testing of the LHSI pumps and associated check valves, and do not specify an "R" testing DELIVERING 9808180208 98081i2 PDR 00ALITY P ADOCK 05000412 PDR ENERGY t

l Beaver Valley Power Station, Unit No. 2 Withdrawal of Proposed Revision 2F to the Inservice Testing Program

..- Page 2 l

frequency. Therefore, based on the understanding described above, DLC withdraws proposed Revision 2F to the BV-2 IST Program in its entirety. In order to ensure that the above understanding is correct, DLC requests that the NRC acknowledge the above position in writing.

l If there are any questions concerning this matter, please contact Mr. S. H. Hobbs at (412) 393-5203.

I l Sincerely, i i

Sushil C. Jain 1

I c: Mr. D. S. Brinkman, Sr. Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator I l