L-97-069, Forwards ISI ten-year Plan for Second Interval at Bvps,Unit 2,including Listing of All Components within Scope of Second Interval ISI Program,Isometric Drawings,Spreadsheets & Sys Flow Diagrams.Ten Relief Alternative Exam Requests Included

From kanterella
Jump to navigation Jump to search
Forwards ISI ten-year Plan for Second Interval at Bvps,Unit 2,including Listing of All Components within Scope of Second Interval ISI Program,Isometric Drawings,Spreadsheets & Sys Flow Diagrams.Ten Relief Alternative Exam Requests Included
ML20203F296
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 12/09/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203F301 List:
References
L-97-069, L-97-69, NUDOCS 9712170340
Download: ML20203F296 (2)


Text

. _ _ _ ._

L M M p**o7Cf"m**u*'m'".wu sewaspon

'1

, susna. c.ww December 9,1997 om us-ssu

", sMP '""*"*'***

woe L-97-069 Nuclear Power D9 vision U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Stat on, Unit No. 7 Docket No 50-412, License No. NPF-7l4 Inservice Inspection Program - Ten-Year Update The purpose of this submittal is to forward to the Nuclear Regulatory Commission the Beaver Valley Power Station Unit No. 2 updated Inservice Inspection (ISI) Program as required by 10 CFR 50.55a. This program is applicable for the second Ten-Year Interval of the ISI Program.

Additionw information has also been provided to assist you in your review of the second duterval ISI Program. The following Enclosures are included in this submittal:

1 Enclosure 1: Inservice Inspection Ten-Year Plan for the Second Interval at )

Beaver Valley Power Station Unit 2. (Note: The examination tables of this Plan  ;

contain only those c6mponents scheduled for examination.) l Enclosure 2: Listing of all components within the scope of the Sewnd Interval ISI Program.

Enclosure 3: Unit 2 ISIIsometric drawings Enclosure 4: Spreadsheets prepared to assist in the selection process for those examination categories having prorated examination requirements. ,

Enclosure 5: Unit 2 System flow diagrams The Program as submitted in Enclosure 1 also contains ten relief / alternative examination requests submitted under the provisions of 10 CFR 50.55a(a)(3)(i),

(aX3Xii), or (gX6Xi) for which Nuclear Regulatory Commission approval is required.

DEllVEHNG 9712170340 971209 PDR ADOCK 05000412 9 eaa. .

I.I.l.l i.lll.!Il..I .!I.l l.l.

a ,

- Beaver Valley Pswer Station, Unit No. 2 Inservice Inspection Program - Ten-Year Update Page 2 The Second Ten-Year ISI interval commenced on November 17, 1997, and the updated Program has been prepared following the requirements of the 1989 Edition of the ASME B&PV Code which is consistent with 10 CFR 50.55a paragraph (b).

If you have any questions regarding this request, please contact Mr. J. Arias at (412) 393-5203.

Sincerely, p . o gi Sushil C. Jain

- c: Mr. D. S. Brinkman, Sr. Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr, H. J. Miller, NRC Region I Administrator

?

-,