Letter Sequence Request |
---|
EPID:L-2021-LLR-0007, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension (Approved, Closed) |
|
MONTHYEARL-21-047, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension2021-01-28028 January 2021 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension Project stage: Request ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions Project stage: Acceptance Review ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 Project stage: RAI L-21-080, Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011)2021-02-22022 February 2021 Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011) Project stage: Response to RAI ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 Project stage: Other ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) Project stage: Acceptance Review ML21110A6092021-04-26026 April 2021 Issuance of Relief Requests Vr 3, Revision 0, and Vr 5, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval Project stage: Approval 2021-02-22
[Table View] |
Similar Documents at Perry |
---|
Category:Code Relief or Alternative
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21110A6092021-04-26026 April 2021 Issuance of Relief Requests Vr 3, Revision 0, and Vr 5, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval L-21-047, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension2021-01-28028 January 2021 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-28028 September 2020 Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program L-19-145, 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval2020-01-0606 January 2020 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML1202501092012-01-31031 January 2012 Safety Evaluation in Support of 10 CFR 50.55A Requests for the Third 10-Year In-Service Inspection Interval JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML1110501052011-04-19019 April 2011 Withdrawal of Requested Licensing Action 10 CFR 50.55A Relief Requests in Support of the Third 10-Year In-Service Inspection Interval, IR-001 and IR-013 ML1032006682010-11-19019 November 2010 Relief Request VR-7, One Time Replacement Frequency Extension ML0928900322009-10-22022 October 2009 Safety Evaluation of Relief Requests for Perry Third 10-Year Pump and Valve Inservice Testing Program ML0926406902009-10-0808 October 2009 Relief Request, PR-3 for Third 10-Year Pump and Valve Inservice Testing Program, TAC ME0820 ML0829607292008-12-29029 December 2008 Request for Relief Related to Inservice Inspection Relief Request IR-054 ML0831002842008-12-16016 December 2008 Request for Relief Related to Inservice Inspection Relief Requests IR-056 and IR-057 L-08-347, Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval2008-11-18018 November 2008 Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval ML0703607332007-03-0909 March 2007 Request for Relief No. VR-14 Regarding Emergency Service Water Manual Valve Testing Frequency ML0620604472006-07-17017 July 2006 50.55a Request for Alternative Testing Frequency ML0435500732005-01-13013 January 2005 Request to Use Later American Society of Mechanical Engineers Code Edition and Addenda, Request No. IR-053 ML0410400232004-03-31031 March 2004 License Amendment Request Pursuant to 10 CFR 50.90 and Relief Request Pursuant to 10 CFR 50.55a(a)(3) Related to the Testing of Safety/Relief Valves ML0311503132003-05-16016 May 2003 Relief Request for the In-Service Testing Program for Implementation of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Operations and Maintenance Code Case OMN-2 ML0217204622002-06-10010 June 2002 Submittal of In-Service Testing Program Relief Request from Perry Nuclear Power Plant 2024-09-13
[Table view] Category:Letter type:L
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-057, Submittal of the Decommissioning Funding Status Report2024-03-28028 March 2024 Submittal of the Decommissioning Funding Status Report L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-076, Independent Spent Fuel Storage Installation - Supplemental Information for Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-22022 March 2024 Independent Spent Fuel Storage Installation - Supplemental Information for Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 L-24-053, Independent Spent Fuel Storage Installation, Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-02-27027 February 2024 Independent Spent Fuel Storage Installation, Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 2024-09-09
[Table view] |
Text
energy Energy Harbor Nuclear Corp.
harbor Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 4408 1 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear January 28 , 2021 L-21-047 10 CFR 50 .55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension In accordance with 10 CFR 50.55a(z)(2), Energy Harbor Nuclear Corp. hereby requests Nuclear Regulatory Commission (NRC) staff approval of requests VR-3, Revision 0, and VR-5, Revision 0 that propose a one-time extension of valve testing for certain Perry Nuclear Power Plant valves scheduled for the upcoming spring 2021 refueling outage.
The enclosed request identifies the affected components, applicable code requirements, and a description and basis for the proposed alternative.
Because of the hardship produced by the recent pandemic and the resulting national state of emergency, Energy Harbor Nuclear Corp. is requesting expedited NRC approval of this request. To support the critical generation and startup of Perry Nuclear Power Plant from its scheduled spring 2021 refueling outage, Energy Harbor Nuclear Corp. requests approval of the proposed alternative by February 26, 2021.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager, Fleet Licensing, at (330) 696-7208.
Sincerely, Pcnlicld, Rod 55166 sitevp Penfield, Rod 55166 ~::2~Pf~~~i~~l~h~iocumcnt Rod L. Penfield
Perry Nuclear Power Plant L-21-047 Page 2
Enclosure:
A. Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-3, Revision 0 B. Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-5, Revision 0 cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager
Enclosure A L-21-047 Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-3, Revision 0 (3 pages follow)
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-3, Revision 0 Page 1 of 3 Proposed Alternative In Accordance with 10 CFR 50.55a(z)(2)
--Hardship Without a Compensating Increase in Quality and Safety
- 1. ASME Code Components Affected Valve Component ID Component Description Code Class Category Suppression Pool Level A 1D23-F010A 2 A Dry Leg Isolation Valve Suppression Pool Level B 1D23-F010B 2 A Dry Leg Isolation Valve Containment Pressure A 1D23-F020A 2 A Containment Isolation Valve Containment Pressure B 1D23-F020B 2 A Containment Isolation Valve Containment Drywell A 1D23-F030A Differential Pressure - 2 A Containment Leg Valve Containment Drywell B 1D23-F030B Differential Pressure - 2 A Containment Leg Valve Containment Drywell A 1D23-F040A Differential Pressure - 2 A Drywell Leg Valve Containment Drywell B 1D23-F040B Differential Pressure - 2 A Drywell Leg Valve Suppression Pool Level C 1D23-F050 2 A Dry Leg Isolation Valve
2. Applicable Code Edition and Addenda
American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM)
Code, 2012 Edition.
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-3, Revision 0 Page 2 of 3
3. Applicable Code Requirements
ASME OM Code, Subsection ISTC 3630, Leakage Rate for Other Than Containment Isolation Valves, paragraph (a), Frequency, states that:
Tests shall be conducted at least once every 2 yr [years].
ASME OM Code, Subsection ISTC-3700, Position Verification Testing, states in part that:
Valves with remote position indicators shall be observed locally at least once every 2 yr [years] to verify that valve operation is accurately indicated. Where practicable, this local observation should be supplemented by other indications such as use of flow meters or other suitable instrumentation to verify obturator position. These observations need not be concurrent. Where local observation is not possible, other indications shall be used for verification of valve operation.
When implementing ASME OM Code, 2012 Edition, Subsection ISTC-3700, the supplemental indication portion is made mandatory by 10 CFR 50.55a(b)(3)(xi).
4. Reason for Request
Perry Nuclear Power Plant (PNPP) is scheduled to start its 18th refueling outage (1R18) on March 7, 2021. Leakage rate testing and position verification testing of the valves identified in Section 1 is required every two years. The valves identified may only be tested during a cold shutdown or refueling outage as opening or closing the valves may cause unanalyzed perturbations that initiate the trip logic associated with the instrumentation being isolated that in turn could cause a plant shutdown to occur.
Performance of the valve testing requires qualified valve leak rate testing contractors.
To prevent the spread of coronavirus disease 2019 (COVID-19), comply with Centers for Disease Control and Prevention (CDC) guidance at the Perry Nuclear Power Plant, and to protect the health and safety of plant personnel while maintaining responsibilities to support critical infrastructure, Energy Harbor Nuclear Corp. intends to reduce the number of personnel on-site during the upcoming refueling outage, including qualified valve leak rate testing contractor personnel.
The COVID-19 virus has created a hardship or unusual difficulty in performing the applicable code required testing and performing the required testing during the upcoming spring 2021 refueling outage would not provide a compensating increase in the level of quality or safety as there is reasonable assurance that the affected valves will be operationally ready as described in section 5 below.
5. Proposed Alternative and Basis for Use
As an alternative to the ASME OM Code Subsection ISTC 3630, paragraph (a), valve leakage rate test frequency of every two years, and Subsection ISTC-3700 position
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-3, Revision 0 Page 3 of 3 indication verification requirements, Energy Harbor Nuclear Corp. proposes a one-time extension of the test frequency and position verification requirements scheduled to be performed during the spring 2021 refueling outage. The leakage rate testing and position indication verification requirements applicable to the affected valves (listed in Section 1) will resume during the next scheduled refueling outage in the spring of 2023.
These solenoid valves are tested to verify they exercise close to their safety-related position and their stroke time is measured in the closed direction during cold shutdowns or refueling outages. These tests are scheduled and will be performed during the spring 2021 refueling outage. To satisfy the position indication requirement, the valves are tested using leak rate measuring equipment. The valve obturator position is determined by the ability to pressurize the test volume via test equipment (valve closed) and the ability to depressurize the test volume (valve opened). This test also satisfies 10 CFR 50.55a(b)(3)(xi) supplemental indication requirements when ISTC-3700 is performed.
Measured leakage is compared against an owner-specified limit. There has not been a failure of the position indication light or measured leakage rate criteria for any solenoid valve in the last 13 years. This testing is performed each refueling outage.
Based on valve test history and other information provided above, there is reasonable assurance that the affected valves (listed in Section 1 above) will remain operationally ready until the 2023 refueling outage.
6. Duration of Proposed Alternative
The proposed alternative is requested for use during the PNPP fourth 10-year in-service test interval. The proposed alternative would be a one-time extension of testing of the affected valves (listed in Section 1 above) during the spring 2021 refueling outage.
Testing of the valves in accordance with Subsection ISTC-3630 and IST-3700 would resume in the 2023 refueling outage.
Enclosure B L-21-047 Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-5, Revision 0 (3 pages follow)
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-5, Revision 0 Page 1 of 3 Proposed Alternative In Accordance with 10 CFR 50.55a(z)(2)
--Hardship Without a Compensating Increase in Quality and Safety
- 1. ASME Code Components Affected Valve Component ID Component Description Code Class Category 1C41-F029B SLC Pump B Relief Valve 2 C RCIC Turbine Lube Oil Cooler 1E51-F018 2 C Relief to CRW SLC - Standby Liquid Control RCIC - Reactor Core Isolation Cooling CRW - Clean Radwaste Collection System
2. Applicable Code Edition and Addenda
American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM)
Code, 2012 Edition.
3. Applicable Code Requirements
ASME OM Code, Division 1, Mandatory Appendix I, Subsection I-1350, Test Frequency, Classes 2 and 3 Pressure Relief Valves, paragraph (a), 10-Yr Test Interval, states in part that:
Classes 2 and 3 pressure relief valves, with the exception of PWR main steam safety valves, shall be tested every 10 yr [year], starting with initial electric power generation. No maximum limit is specified for the number of valves to be tested during any single plant operating cycle; however, a minimum of 20% of the valves from each valve group shall be tested within any 48-mo [month] interval. This 20% shall consist of valves that have not been tested during the current 10-yr [year] test interval, if they exist.
4. Reason for Request
Perry Nuclear Power Plant (PNPP) is scheduled to start its 18th refueling outage (1R18) on March 7, 2021. Two relief valves are at the end of their required 48-month required test interval as specified by ASME OM Code, Mandatory Appendix I, Paragraph I-1350(a) and are required to be tested during the 18th refueling outage.
Energy Harbor Nuclear Corp. does not possess the required code symbol stamp to perform in-house modification or adjustment of relief valves at PNPP. Therefore, to
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-5, Revision 0 Page 2 of 3 meet the Paragraph I-1350(a) test requirements, vendors that possess the required code symbol stamp are employed to perform the required test of a newly procured relief valve or an available spare relief valve from PNPP and provide a pretested relief valve to replace a relief valve that has been in service at PNPP.
An available spare relief valve at PNPP would ordinarily be tested by a vendor and used to replace valve 1C41-F029B. There is no available spare valve onsite that can be tested to replace valve 1E51-F018. Therefore, a new valve would ordinarily be procured and tested by a vendor to replace valve 1E51-F018.
To prevent the spread of coronavirus disease 2019 (COVID-19), comply with Centers for Disease Control and Prevention (CDC) guidance, and to protect the health and safety of Perry Nuclear Power Plant personnel while maintaining responsibilities to support critical infrastructure, Energy Harbor Nuclear Corp. intends to reduce the number of personnel on-site during the spring 2021 refueling outage, including a reduction in contractors for valve work. Additionally, due to the pandemic and vendor personnel working remotely, the production schedule of the vendor providing the valves to be used as pre-tested replacements has been negatively affected. As a result, the acquisition of qualified and tested replacement relief valves has been challenged and may not be available for the 18th refueling outage.
The COVID-19 virus has created a hardship or unusual difficulty in performing the applicable code required testing and performing the required testing during the upcoming spring 2021 refueling outage would not provide a compensating increase in the level of quality or safety as there is reasonable assurance that the affected valves will be operationally ready as described in section 5 below.
5. Proposed Alternative and Basis for Use
As an alternative to the 48-month required test interval of ASME OM Code, Division 1, Mandatory Appendix I, Paragraph I-1350(a), Energy Harbor Nuclear Corp. proposes a one-time extension of the test interval for valves 1C41-F029B and 1E51-F018 scheduled for the spring 2021 refueling outage. Testing for valves 1C41-F029B and 1E51-F018 to meet Paragraph I-1350(a) will resume during the next scheduled refueling outage in the spring of 2023.
Valve 1C41-F029B is categorized as a Class 2 and 3 pressure relief valve. It is in a group of two valves. The 48-month test is to be performed for this valve no later than March 12, 2021. For the currently installed valve 1C41-F029B, a previously installed valve was refurbished and then tested at a vendor facility on February 28, 2013 prior to installation into the plant.
Valve 1E51-F018 is categorized as a Class 2 and 3 pressure relief valve. It is in a group of two valves. The 48-month test is to be performed for this valve no later than March 15, 2021. For the currently installed valve 1E51-F018, a new valve was purchased from the original equipment manufacturer and then tested at the vendor
Perry Nuclear Power Plant 10 CFR 50.55a Request Number VR-5, Revision 0 Page 3 of 3 facility on March 10, 2014 prior to installation into the plant. The valve was pre-service tested with satisfactory results on December 6, 2016.
ASME OM Code paragraph I-1350(a) states in part that the test interval for any installed valve shall not exceed 10 years and the 10-year test interval shall begin from the date of the as-left set pressure test. Testing Valve 1C41-F029B during the spring of 2023 refueling outage would meet this 10-year test interval requirement by using a portion of the six-month test interval extension permitted by ASME OM Code Case OMN-20, Inservice Test Frequency. Testing Valve 1E51-F018 during the spring of 2023 refueling outage would meet this 10-year test interval requirement.
Based on the information provided above, valve 1C41-F029B was replaced with a refurbished valve that was tested in February of 2013, and valve 1E51-F018 was replaced with a new valve that was tested in December of 2016. As valve 1C41-F029B has been in service less than 8 years since last tested, valve 1E51-F018 has been in service just over 4 years since last tested, and the valves would be tested within the 10-year test interval requirement (using a portion of the permitted six-month test interval extension for valve 1C41-F029B) there is reasonable assurance that these valves will remain operationally ready until the 2023 refueling outage.
6. Duration of Proposed Alternative
The proposed alternative is requested for use during the PNPP fourth 10-year in-service test interval. The proposed alternative would be a one-time extension of testing of the affected relief valves (listed in Section 1 above) during the spring 2021 refueling outage.
Testing of the relief valve in accordance with ASME OM Code Mandatory Appendix I, Subsection I-1350, Paragraph (a) would resume in the 2023 refueling outage.