L-2021-161, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums

From kanterella
Jump to navigation Jump to search
10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML21244A346
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold  NextEra Energy icon.png
Issue date: 08/24/2021
From: Lesniak T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2021-161
Download: ML21244A346 (2)


Text

L-2021-161 10 CFR 140.21 August 24, 2021 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Re: Florida Power & Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 N extEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 N extEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums In accordance with 10 CFR 140.21, Florida Power & Light Company (FPL), the licensee for the St.

Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of N extEra Energy Seabrook, LLC, the licensee for Seabrook Station; N extEra Energy Duane Arnold, LLC, the licensee for Duane Arnold Energy Center; and N extEra Energy Point Beach, LLC, the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy),

provides the following information in satisfaction of the annual requirements of 10 CFR 140.21.

NextEra Energy maintains American Nuclear Insurers (ANI) bonds for payment of retrospective premiums for St. Lucie, Turkey Point, Seabrook, Duane Arnold, and Point Beach. As stated in the NRC Federal Register notice dated October 22, 2007 (72 FR 59574), this bonding meets the requirements of 10 CFR 140.21(a). In accordance with 10 CFR 140.15, Marsh USA Inc. has submitted to the NRC, the most recent nuclear liability certificate of insurance for each reactor (Letter, Mr. Dan Evans, Marsh USA Inc.), "2021 Nuclear Liability Certificates oflnsurance," dated February 18, 2021.

Florida Power &. Light Company 700 Universe Boulevard, Juno Beach, FL 33408

L-2021-161 Page 2 of2 This letter contains no new or revised regulatory commitments.

Should you have any questions regarding this information, please contact Alison Brown at (561) 304-6243.

Sincerely,

--=....+-e"'"'s~ruak General Manager, Regulatory Affairs Florida Power & Light Company cc: Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region III USNRC Project Manager, St. Lucie USNRC Project Manager, Turkey Point USNRC Project Manager, Seabrook Station USNRC Project Manager, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, USNRC, St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, Seabrook Station Senior Resident Inspector, USNRC, Duane Arnold Senior Resident Inspector, USNRC, Point Beach