L-2019-079, Model Year 10 CFR 50.46 Annual Report for the AP1000 Plant Design

From kanterella
(Redirected from L-2019-079)
Jump to navigation Jump to search
Model Year 10 CFR 50.46 Annual Report for the AP1000 Plant Design
ML19101A190
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/09/2019
From: Franzone S
Florida Power & Light Co
To:
Document Control Desk, Office of New Reactors
References
L-2019-079
Download: ML19101A190 (2)


Text

L-2019-079 10 CFR 52.3 10 CFR 50.46(a)(3)

April 9, 2019 U.S. Nuclear Regu_latory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Florida Power & Light Company Turkey Point Units 6 and 7 Docket Nos.52-040 and 52-041 2018 Model Year 10 CFR 50.46 Annual Report for the AP1000 Plant Design

Reference:

Westinghouse Electric Company Letter DCP _NRC_000146 to the NRC dated March 26, 2019 - 10 CFR 50.46 Annual Report for the AP1000 Plant Design (ADAMS Accession No. ML19088A128)

The purpose of this letter is to provide a required report in accordance with 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, for Turkey Point Units 6 and 7 (PTN 6 & 7). The PTN 6 & 7 CO Ls incorporate by reference AP1000 Design Certification Document (DCD) Revision 19, and thus also the peak fuel cladding temperature calculations performed by Westinghouse Electric Corporation (WEC). Accordingly, the referenced WEC 2018 Model Year 10 CFR 50.46 annual report for the AP1000 Design Certification analysis of record (AOR) applies to PTN 6 & 7.

As described in the referenced annual report, there are no new emergency core cooling system model changes that impact peak cladding temperature (PCT) for the 2018 model year. The estimated PCT for the large break loss of coolant accident remains at 2010°F and does not exceed the 10 CFR 50.46(b)(1) acceptance criterion of 2200°F. The summary of the AP1000 Design Certification AOR PCT margin allocations and their bases are provided in Attachment 1 of the reference letter.

Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408

Turkey Point Units 6 and 7 Docket Nos.52-040 and 52-041 L-2019-079 Page 2 If you have any questions, or need additional information, please contact me at 561-691-2296. .

~~ ~~~-----~-

Steve Franzone Licensing Manager - New Nuclear Projects SMF/RFO cc:

USNRC Regional Administrator, Region II USN RC PTN 6 & 7 Project Manager, AP1000 Licensing Branch 4, DNRL/NRO USNRC Senior Resident Inspector, Turkey Point Nuclear Plant