0FPL. April 8, 2013 L-2013-133 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Unit 3 and Unit 4 Docket Nos. 50-250 and 50-251 Errata Corrections to FPL Letter L-2013-087 A recent periodic review of records revealed minor errors in Florida Power & Light Company (FPL) Turkey Point Unit 3 letter, L-2013-087, dated March 11, 2013.

The purpose of this letter is to provide errata corrections for updating the submittal with corrected pages.

Attachment 1 identifies the specific page of the correspondence that contain the minor errors, and a brief description of the correction.

Attachment 2 provides errata corrections for letter L-2013-087.

Should there be any questions regarding this information, please contact Robert J. Tomonto, Licensing Manager at (305) 246-7327.

Sincerely, Michael Kiley Vice President Turkey Point Nuclear Plant SM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company Ax C 9760 S.W. 344' Street Homestead, FL 33035

L-2013-133 Attachment 1 Description of Errata Corrections FPL letter, L-2013-087, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)

Regarding the Flood Hazard Reevaluation of Recommendation 2.1, dated March 11, 2013 contain minor errors. Specifically, Figure 4-14 was omitted, while a duplicate of Figure 4-16 was provided in place of Figure 4-14. Additionally, Figure 4-16 contained a minor typographical error in the title block. These figures were revised. The corrected pages for Figure 4-14, and Figure 4-16, are provided herein in Attachment 2 as errata corrections for L-2013-087.

L-2013-114 Attachment 2 Revised Pages for L-2013-087 Figure 4-14 and Figure 4-16

Miles Legend 0 205 410 615

/ I I I Turkey Point Nuclear A IHO Tidal Stations -- I I I I Generating Station Units DELFT3D Grid Model 0 260 520 780 1,040 3 & 4 (PTN) Domain Kilometers Figure 4-14 Tidal Stations Used for Storm Surge Model Calibration Document Name: FPLTP077-GIS-A018 Projection: Geographic Coordinate System, WGS 84 Flooding Hazard Reevaluation By: MLS Date: 01/06/2013 Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Legend Turkey Point Nuclear

-Generating Station Units 3 & 4 (PTN)

Hurricane Position (6 hr i*me Step)

Hurricane Andrew (Calibration)

Hurricane Donna (Validation)

A0gu :004f 92k,[j

  • DELFT3D Grid Model 0.. ZDomain

References:

1. ESRI, 2013a, 2. NOAA, 2012.k.

Miles 0 350 700 1,050 I_ __ I I I 0 400 800 1,200 1,600 Kilometers Document Name: FPLTP077-GIS-A007 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01106/2013 Figure 4-16 Storm Tracks for CalibrationNalidation Flooding Hazard Reevaluation A-A Turkey Point Nuclear Generatino Station Units 3&4 IPTNI