0FPL.

April 8, 2013 L-2013-133 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Unit 3 and Unit 4 Docket Nos. 50-250 and 50-251 Errata Corrections to FPL Letter L-2013-087 A recent periodic review of records revealed minor errors in Florida Power & Light Company (FPL) Turkey Point Unit 3 letter, L-2013-087, dated March 11, 2013.

The purpose of this letter is to provide errata corrections for updating the submittal with corrected pages. identifies the specific page of the correspondence that contain the minor errors, and a brief description of the correction. provides errata corrections for letter L-2013-087.

Should there be any questions regarding this information, please contact Robert J. Tomonto, Licensing Manager at (305) 246-7327.

Sincerely, Michael Kiley Vice President Turkey Point Nuclear Plant SM Attachments cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company Ax C

9760 S.W. 344' Street Homestead, FL 33035

L-2013-133 Description of Errata Corrections FPL letter, L-2013-087, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)

Regarding the Flood Hazard Reevaluation of Recommendation 2.1, dated March 11, 2013 contain minor errors. Specifically, Figure 4-14 was omitted, while a duplicate of Figure 4-16 was provided in place of Figure 4-14. Additionally, Figure 4-16 contained a minor typographical error in the title block. These figures were revised. The corrected pages for Figure 4-14, and Figure 4-16, are provided herein in Attachment 2 as errata corrections for L-2013-087.

L-2013-114 Revised Pages for L-2013-087 Figure 4-14 and Figure 4-16

Legend Turkey Point Nuclear Generating Station Units 3 & 4 (PTN)

A IHO Tidal Stations DELFT3D Grid Model Domain Miles 0

205 410 615

/

I I

I I

I I

I 0

260 520 780 1,040 Kilometers Figure 4-14 Document Name: FPLTP077-GIS-A018 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01/06/2013 Tidal Stations Used for Storm Surge Model Calibration Flooding Hazard Reevaluation Turkey Point Nuclear Generating Station Units 3&4 (PTN)

Legend Turkey Point Nuclear

-Generating Station Units 3 & 4 (PTN)

Hurricane Position (6 hr i*me Step)

Hurricane Andrew (Calibration)

Hurricane Donna (Validation)

A0gu

004f

,[j 92k DELFT3D Grid Model

0..

ZDomain

References:

1. ESRI, 2013a, 2. NOAA, 2012.k.

Miles 0

350 700 1,050 I _

I I

I 0

400 800 1,200 1,600 Kilometers Document Name: FPLTP077-GIS-A007 Projection: Geographic Coordinate System, WGS 84 By: MLS Date: 01106/2013 Figure 4-16 Storm Tracks for CalibrationNalidation Flooding Hazard Reevaluation A-A Turkey Point Nuclear Generatino Station Units 3&4 IPTNI