0FPL, March 31, 2013 L-2013-114 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Unit 3 and Unit 4 Docket Nos. 50-250 and 50-251 Errata Corrections to FPL letter L-2012-070 A recent periodic review of records revealed minor errors in Florida Power & Light Company (FPL) letter, L-2012-070, dated February 29, 2012.

The purpose of this letter is to provide errata corrections for updating the previous submittal with corrected pages.

Attachment 1 identifies the specific page(s) of the letter that contain the minor errors, and a brief description of the correction.

Attachment 2 provides errata corrections for FPL letter L-2012-070.

Should there be any questions regarding this information, please contact Robert J. Tomonto, Licensing Manager at (305) 246-7327.

Sincerely, Michael Kiley Vice President Turkey Point Nuclear Plant SM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Liqht Company 9760 S.W. 344' Street Homestead, FL 33035

~wZL

L-2013-114 Attachment 1 Description of Errata Corrections FPL letter, L-2012-070, 2011 Annual Radioactive Effluent Release Report, dated February 29, 2012 contain minor errors. Specifically, L-2012-070, Pages 13 and 18 contain a separate line item which reports C-14 releases. However, the report erroneously incorporated C-14 releases under the line item of particulate releases. C-14 is neither a fission/activation gas nor is considered a particulate. C-14 releases have been removed from the particulate releases in pages 13 and 18 of FPL letter L-2012-070. Pages 13 and 18 of L-2012-070 are resubmitted herein in Attachment 2 as errata corrections.

-j L-2013-114 Attachment 2 Errata Corrections Revised Pages of L-2012-070 Pages 13 and 18

TURKEY POINT UNITS 3 AND 4 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT JANUARY 2011 THROUGH DECEMBER 2011 GASEOUS EFFLUENTS

SUMMARY

UNIT 3 TABLE 3 A. FISSION AND ACTIVATION PRODUCTS

[ UNITS Qtr I Qtr2 Qtr3 Qtr4 i Est. Error(%)

I.. Total Release

2. Average release rate for the period

_ CiI uCi/sec 2.48E-01 3.19E-02 I 3.61 E-03 4.60E-04 0.OOE+00 0.00E+00 3.26E-01 4.19E-02 .....

2.79

3. Percent of Technical Specification Limit  % I 1.21E-12 8.36E-15 0.OOE+00 5.61 E-1 B. IODINES

_ UNITS Qtr I Qtr2 Qtr3 Qtr4 i Est. Error(%)I1

1. Total Release Ci 4.57E-06 I _ - -- 8.80E-06 3.44 112.Average release rate for the period uCVsec 5.88E-07 - - -- 1.11E-06 Percen of-iechnical Specification Llmitt I'  % 7.86E-04 ... 1.51E.03 C. PARTICULATES I UNITS Qtr 1 I Qtr2 Qtr3 Qtr4 Est. Error (%)
1. Particulates with half-life >8 days Ci -" __ 2 .5
2. Average release rate for the period uCi/sec - - "....... -
3. Percent of Technical Specification Limit.'....- -- --- "%

Gross Alpha Radioactivity Ci . -- - - - - --

D. TRITIUM

_ UNITS i Qtr I Qtr 2 Qtr 3 Qtr4 Est. Error(%)1 I1. Total Release . Ci 1.98E-_01___ 2.27E+00 - - 6.95E-01 2.5

2. Average release rate for the period uCi/sec 2.55E-02 j 2.89E-01 . - - 8.94E-02

[3. Percent of Technical Specification Limit  % 1.49E-06 I 1.71E-05 - - 5.22E-06 D. CARBON-14 UNITS Qtrl I Qtr2 Qtr3 I Qtr4 Est. Error(%)

1. Total Release Ci 2.49E+00__ 1.83E+00 0.OOE+00 2.83E+00 15.00
2. Average release rate for the period uCi/sec 3.20E-001 2.35E-01 0.OOE+00 3.642E01 ...........
3. Percent of Technical Specification Limit  % 01 E+00 i2.21 E+00 0.OOE+00 j 3.42E+00 13

TURKEY POINT UNITS 3 AND 4 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT JANUARY 2011 THROUGH DECEMBER 2011 GASEOUS EFFLUENTS

SUMMARY

UNIT 43 TABLE 3 A. FISSION AND ACTIVATION PRODUCTS I UNITS Qtr I Qtr2 1 Qtr3 Qtr4 Est. Error (%)

1. Total Release Ci 3.27E-01 _ 3.61 E-03 -" 2.68E-01 2.79
2. Average release rate for the period uci/sec 4.21 E-02 4.60E-04 . -- . 3.45E-02 .
3. Percent of Techncal Specification LImit %115E-11 i 8.36E-15 -" I 5.39E-12 E1l B. IODINES Total ReleaseaI
2. Average release rate for the period
3. Percent of Technical Specification Llmit r UNITS Ci

- uCi/sec atr I Q

2.42E-06 3.1-1E-07 4.161E-04 Qtr2 7.19E-1 0 9.15E-1 1.24E-07..

Qtr3 Qtr4 Est. Error(%)

3 344 C. PARTICULATES

_ UNITS Qtr 1 Qtr 2 Qtr 3 Qtr 4 Est. Error (%)

1. Particulates with half-life >8 days Ci - 1.75E-06 .2.50 2Average release rate for the period uCVsec I -- I 2.23E-07 --- --
3. Percent of Technical Specification Ilmit-. ...- %

% - . --- - 2.86E-08 -- .

4.-Gross Alpha Radoactivity ---- -. -

D. TRITIUM

-UNITS Qtr I Qtr 2 Qtr 3 Qtr 4 Est. Error (%)

1. Total Release ci 5.70E-02 1.09E+00 _ -- 7.51E-01 2.50
2. Average release rate for the period u c 7.33E-03 1.39E - 965E-02
3. Percent_,,,,_,_.__,_.

of Technical Specification Limit  % i 4128E-07 8.22E-06 -- 5.64E-06_

D. CARBON-14 I UNITS Qtr I Qtr 2 Qtr 3 Qtr 4 I Est. Error (%)

1. Total Release Ci 2.18E+00 1.60E+00 2.47E.00 15.00
2. Average release rate for the period uCi/sec 2.80E-01 2.06E-01 - - 3.18E-01
3. Percent of Technical Specification Limit  % 2.40E+00 2.02E+00 __ -- 3.12E+00 ..

18