Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 May 14, 2004 SPL L-2004-113 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly your William Jefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment 5 I "

an FPL Group company

L-2004-1 13 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 500-335 UNIT NAME Sii. Lucie 1 DATE M,ay 10. 2004 COMPLETED BY K. R. Boller TELEPHONE (7,22) 467-7465 REPORTING PERIOD: April 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 169.25 2,106.30 195,650.30
4. Number of Hours Generator On-line 126.35 2,063.40 193,773.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 75,829.00 1,724,091.00 158,825,038.0 UNIT SHUTDOWNS Method of Shutting Cause & Corrective Action l reason I Down 2 Comments

-C 4 Unit offline for the SLI1 -19 refueling outage

SUMMARY

Unit 1 started the reporting period in the SLI-19 refueling outage. The unit was returned to normal operation on April 25, 2004. In accordance with the requirements of Technical Specification 6.9.1.6 there were no challenges to the power operated relief valves (PORVs) or the safety valves during the report period.

I *2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

L-2004-113 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 -389 UNIT NAME St . Lucie 2 DATE MEay 10, 2004 COMPLETED BY K. R. Boller TELEPHONE (7 22) 467-7465 REPORTING PERIOD: April 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 2,903.00 158,939.57
4. Number of Hours Generator On-line 719.00 2,903.00 157,025.47
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 612,461.00 2,462,812.00 129,509,788.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

Unit 2 operated at power In Mode 1 for the entire month of April. In accordance with the requirements of Technical Specification 6.9.1.6. there were no challenges to the power operated relief valves (PORVs) or the safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 May 14, 2004 SPL L-2004-113 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly your William Jefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment 5 I "

an FPL Group company

L-2004-1 13 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 500-335 UNIT NAME Sii. Lucie 1 DATE M,ay 10. 2004 COMPLETED BY K. R. Boller TELEPHONE (7,22) 467-7465 REPORTING PERIOD: April 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 169.25 2,106.30 195,650.30
4. Number of Hours Generator On-line 126.35 2,063.40 193,773.70
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 75,829.00 1,724,091.00 158,825,038.0 UNIT SHUTDOWNS Method of Shutting Cause & Corrective Action l reason I Down 2 Comments

-C 4 Unit offline for the SLI1 -19 refueling outage

SUMMARY

Unit 1 started the reporting period in the SLI-19 refueling outage. The unit was returned to normal operation on April 25, 2004. In accordance with the requirements of Technical Specification 6.9.1.6 there were no challenges to the power operated relief valves (PORVs) or the safety valves during the report period.

I *2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

L-2004-113 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 -389 UNIT NAME St . Lucie 2 DATE MEay 10, 2004 COMPLETED BY K. R. Boller TELEPHONE (7 22) 467-7465 REPORTING PERIOD: April 2004

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 2,903.00 158,939.57
4. Number of Hours Generator On-line 719.00 2,903.00 157,025.47
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 612,461.00 2,462,812.00 129,509,788.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

Unit 2 operated at power In Mode 1 for the entire month of April. In accordance with the requirements of Technical Specification 6.9.1.6. there were no challenges to the power operated relief valves (PORVs) or the safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)