L-2002-184, August 2002 Monthly Operating Report for St Lucie Units 1 and 2
ML022550654 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 09/11/2002 |
From: | Jernigan D Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GL-97-002, L-2002-184 | |
Download: ML022550654 (7) | |
Text
0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 September 11, 2002 L-2002-184 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.
Please ntact us should there be any questions regarding this information.
/r
\fie* ly yours,
/
Donald E. Mnigan Vice President St. Lucie Plant DEJ/spt Attachments z
an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: August 2002
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5831 182431.5
- 4. Number of Hours Generator On Line 744 5831 180618
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH). 630619 4982162 147658901
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH Aug~ust 2002 Unit 1 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Number Date lypel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of August.
F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 091587 PPL
DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD, August 2002
- 1. Design Electrical Rating (Mwe-Net). 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5816.4 145829.6
- 4. Number of Hours Generator On Line 744 5813.6 144071.3
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH)- 628091 4946087 118676733
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Unit 2 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Number Date Tvpel Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of August.
2 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued 8 - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 021517 FPL
Text
0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 September 11, 2002 L-2002-184 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.
Please ntact us should there be any questions regarding this information.
/r
\fie* ly yours,
/
Donald E. Mnigan Vice President St. Lucie Plant DEJ/spt Attachments z
an FPL Group company
DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: August 2002
- 1. Design Electrical Rating (Mwe-Net) 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5831 182431.5
- 4. Number of Hours Generator On Line 744 5831 180618
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH). 630619 4982162 147658901
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH Aug~ust 2002 Unit 1 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Number Date lypel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 1 operated at essentially full power for the entire month of August.
F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 091587 PPL
DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD, August 2002
- 1. Design Electrical Rating (Mwe-Net). 830
- 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD CUMULATIVE
- 3. Number of Hours Reactor Critical 744 5816.4 145829.6
- 4. Number of Hours Generator On Line 744 5813.6 144071.3
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH)- 628091 4946087 118676733
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Unit 2 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: September 5, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH August 2002 Number Date Tvpel Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of August.
2 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued 8 - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 021517 FPL