L-11-018, Physical Security Plan (Revision 9)

From kanterella
(Redirected from L-11-018)
Jump to navigation Jump to search
Physical Security Plan (Revision 9)
ML110250197
Person / Time
Site: Beaver Valley
Issue date: 01/19/2011
From: Harden P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-11-018
Download: ML110250197 (2)


Text

FENOC SAFEGUARDS INFORMATION When Separated From Enclosure, Beaver Valley Power Station P.O. Box 4 FirstEnergyNuclear OperatingCompany Handle This Document As Decontrolled Shippingport,PA 15077 PaulA. Harden 724-682-5234 Site Vice President Fax: 724-643-8069 January 19, 2011 L-11-018 10 CFR 50.54(p)(2)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. I and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision 9)

This letter forwards the Revision 9 changes to the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which were effective on December 10, 2010.

Attachment A provides a summary of the changes. The changes were reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2).

The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from disclosure under the provisions of 10 CFR 73.21.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager -

Site Protection, at (724) 682-7812.

Si Paul A. Harden

Attachment:

Summary of BVPS Physical Security Plan, Revision 9 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-11-018 Page 2

Enclosure:

BVPS Physical Security Plan, Revision 9 Changes cc: NRC Region I Administrator NRC Resident Inspector (w/o enclosure)

NRR Project Manager (w/o enclosure)

Director BRP/DEP (w/o enclosure)

Site BRP/DEP Representative (w/o enclosure)

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled