L-11-018, Physical Security Plan (Revision 9)
| ML110250197 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/19/2011 |
| From: | Harden P FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-11-018 | |
| Download: ML110250197 (2) | |
Text
FENOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Paul A. Harden Site Vice President 724-682-5234 Fax: 724-643-8069 January 19, 2011 L-11-018 10 CFR 50.54(p)(2)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. I and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision 9)
This letter forwards the Revision 9 changes to the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) which were effective on December 10, 2010.
Attachment A provides a summary of the changes. The changes were reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2).
The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from disclosure under the provisions of 10 CFR 73.21.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager -
Site Protection, at (724) 682-7812.
Si Paul A. Harden
Attachment:
Summary of BVPS Physical Security Plan, Revision 9 Changes SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled
SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-11-018 Page 2
Enclosure:
BVPS Physical Security Plan, Revision 9 Changes cc:
NRC Region I Administrator NRC Resident Inspector (w/o enclosure)
NRR Project Manager (w/o enclosure)
Director BRP/DEP (w/o enclosure)
Site BRP/DEP Representative (w/o enclosure)
SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled