JAFP-07-0124, Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)

From kanterella
Jump to navigation Jump to search
Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)
ML073130038
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/01/2007
From: Peter Dietrich, Fitzpatrick J
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-07-0124
Download: ML073130038 (5)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 Pete Dietrich Site Vice President - JAF November 1, 2007 JAFP-07-0124 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item ImDrovement Process (CLIIP)

Reference:

Entergy Letter to USNRC (JAFP-07-0091), Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP), dated July 25, 2007

Dear Sir or Madam:

On July 25, 2007, Entergy submitted an application for amendment to the Technical Specifications (TS) for the James A. FitzPatrick Nuclear Power Plant (JAF) based on NRC approved Industry/Technical Specifications Task Force (TSTF)-477, Revision 3 (Reference). That submittal included, in part, the addition of a TS Action statement to the Limiting Condition for Operation (LCO) for TS 3.7.4, Control Room Air Conditioning (AC) System. The new Action statement allows a finite time to restore one control room AC subsystem to operable status (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) when both subsystems are inoperable and requires verification that control room temperature remains < 104 OF every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The referenced submittal stated that the licensing basis control room air temperature for JAF is 104 OF.

Based on telephone conversations with members of the NRC staff, JAF determined that the 104 OF temperature does not meet the intent of TSTF-477. As a result, Entergy is revising its application such that the new Action statement will require verification that control room temperature remains < 90 OF every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The revised temperature of 90 OF is consistent with and meets the intent of the Notice of Availability published in the FederalRegister on March 26, 2007 (72 FR 14143).

Attachment 1 provides replacement TS pages (both marked-up (Insert 1) and re-typed pages) to show the appropriate revision to the temperature.

ý661

This change does not affect the no significant hazards consideration (NSHC) determination provided in the original application. The revised temperature of 90 OF is consistent with and meets the intent of the Notice of Availability published in the Federal Register.

A copy of this revised application, with Attachment 1, is being provided to the designated New York State Official.

There are no new commitments made in this letter. If you have any questions, please contact Mr. Jim Costedio, Regulatory Compliance Manager at 315-349-6358.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the /.rday6l'Jovember, 2007 Pete Dietfich

  • Site Vice President PD/tp

Attachment:

1. Revised Technical Specification Pages (Marked-Up (Insert 1) and Re-Typed) cc:

Mr. Samuel J. Collins USNRC Resident Inspector Regional Administrator, Region I James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission P.O. Box 136 475 Allendale Road Lycoming, NY 13093-0136 King of Prussia, PA 19406-1415 Mr. John P. Boska, Project Manager Mr. Paul Eddy Plant Licensing Branch I-1 New York State Department of Division of Operating Reactor Licensing Public Service Office of Nuclear Reactor Regulation 3 Empire State Plaza, 1 0 th Floor U.S. Nuclear Regulatory Commission Albany, NY 12223 Mail Stop O-8-C2 Washington, DC 20555 Mr. Paul Tonko, President NYSERDA 17 Columbia Circle Albany, NY 12203-6399 2

Attachment 1 to JAFP-07-0124 Entergy Nuclear Operations, Inc. - FitzPatrick Docket No. 50-333 REVISED TECHNICAL SPECIFICATION PAGES TS PAGES Marked-Up (Insert 1) page Re-typed 3.7.4-1

INSERT i B. Two control room AC B.I Verify control room area Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> subsystems inoperable, temperature < 90 *F.

AND B.2 Restore one control room 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AC subsystem to OPERABLE status.

Control Room AC System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Control Room Air Conditioning (AC) System LCO 3.7.4 Two control room AC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC A.1 Restore control room AC 30 days subsystem inoperable, subsystem to OPERABLE status.

B. Two control room AC B.1 Verify control room area Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> subsystems inoperable, temperature < 90

  • F.

AND B.2 Restore one control 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> room AC subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I associated Completion I Time of Condition A or B AND not met in MODE 1, 2, or I

3. C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

JAFNPP 3.7.4-1 Amendment