MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML23095A3762023-04-0505 April 2023 Enclosure 4: Technical Requirements Manual (TRM) Revision 109 ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21166A3662021-06-17017 June 2021 Correction to Amendment No. 342 Issued June 14, 2021, One Time Extension to Technical Specifications 3.5.1, 3.6.1.9, and 3.6.4.1 Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19301C5552019-10-28028 October 2019 Technical Specification Bases B.3.3.5.2 and B3.3.6.1 Provided by Licensee to Support a 10/28/2019 Public Meeting to Discuss Draft Response to Request for Supplemental Information to Revise Allowable Value for RWCU System Primary Containment ML19277D5522019-10-0404 October 2019 Draft James A. FitzPatrick Nuclear Power Plant - Emergency License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement JAFP-16-0142, Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 22016-09-19019 September 2016 Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 2 JAFP-16-0077, Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 12016-06-0303 June 2016 Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 1 ML16062A3882016-04-0606 April 2016 Issuance of Amendment No. 311 Cyber Security Plan Implementation Schedule ML15014A2772015-02-0909 February 2015 Issuance of Amendment Application to Revise Technical Specifications for Technical Specification Low Pressure Safety Limit ML14202A3722014-12-0101 December 2014 Issuance of Amendment 308 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 ML14086A1522014-07-16016 July 2014 Issuance of Amendment Change to Renewed Facility Operating License Condition 2.T JAFP-14-0047, Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio2014-05-0101 May 2014 Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio ML14085A4462014-04-14014 April 2014 Issuance of Amendment Revision to the Definition of Shut Down Margin, by Adopting the Nuclear Regulatory Commission Approved Technical Specification Task Force (TSTF) Standard Technical Specification (STS) CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications ML1134308512012-02-14014 February 2012 License Amendment, Issuance of Amendment Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program JAFP-11-0046, 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal2011-04-0606 April 2011 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML1024604012010-09-27027 September 2010 ME3786, Letter - Issuance of Amendment to Renewed FOL SLMCPR JAFP-09-0132, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves2009-11-23023 November 2009 Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves JAFP-09-0131, Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record2009-11-23023 November 2009 Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time2009-06-0404 June 2009 Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time ML0915507232009-06-0303 June 2009 Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time - (Draft) ML0828203902008-10-0303 October 2008 Technical Specification Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-A ML0810102422008-09-0808 September 2008 Renewed Facility Operating License No. DPR-59 / Appendix a - Technical Specifications JAFP-08-0034, Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A2008-04-22022 April 2008 Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A JAFP-08-0006, Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-3742008-01-22022 January 2008 Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-374 ML0800804572008-01-0303 January 2008 Technical Specifications, Issuance of Amendment Technical Specifications Regarding Control Room Envelope Habitability, Consistent with Technical Specification Task Force-448 JAFP-07-0124, Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP)2007-11-0101 November 2007 Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) JAFP-07-0098, Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-08-13013 August 2007 Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 JAFP-07-0088, James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 32007-07-17017 July 2007 James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 ML0717601272007-06-21021 June 2007 Technical Specifications (Ts), Revised TS 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with Technical Specification Task Force-484 ML0714303022007-05-17017 May 2007 Technical Specifications, Allow Additional Startup and Operating Flexibility and an Expanded Operating Domain JAFP-07-0023, Application for Amendment to Technical Specifications 3.10.1. Re Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-4842007-02-15015 February 2007 Application for Amendment to Technical Specifications 3.10.1. Re Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484 ML0625802332006-09-14014 September 2006 Tech Spec Pages for Amendment 286 Technical Specifications on DC Electrical System Requirements 2024-10-17
[Table view] |
Text
(5) ENO pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power. levels not in excess of 2536 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 286, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protections program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated November 20, 1972; the SER Supplement No. 1 dated February 1, 1973; the SER Supplement No. 2 dated October 4, 1974; the SER dated August 1, 1979; the SER Supplement dated October 3, 1980; the SER Supplement dated February 13, 1981; the NRC Letter dated February 24, 1981; Technical Specification Amendments 34 (dated January 31, 1978), 80 (dated May 22, 1984), 134 (dated July 19, 1989), 135 (dated September 5, 1989), 142 (dated October 23, 1989), 164 (dated August 10, 1990), 176 (dated January 16, 1992), 186 (dated February 19, 1993),
190 (dated June 29, 1993), 191 (dated July 7, 1993), 206 (dated February 28, 1994), and 214 (dated June 27, 1994); and NRC Exemptions and associated safety evaluations dated April 26, 1983, July 1, 1983, January 11, 1985, April 30, 1986, September 15, 1986 and September 10, 1992 subject to the following provision:
ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
Amendment No. 286
DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The following DC electrical power subsystems shall be OPERABLE,
- a. Two 125 VDC subsystems; and
- b. Two 419 VDC low pressure coolant Injection (LPCI) MOV Independent power supply subsystems.
APPLICABILITY. MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger on A.1 Restore battery terminal 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> One 125 VDC power voltage to greater than or subsystem Inoperable. equal to the minimum established float voltage (127.8 VDC).
AND A.2 Verify battery float current Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
<S2 amps.
AND A.3 Restore battery charger to 7 days OPERABLE status.
(continued)
JAFNPP 3.8.4-1 Amendment 286
DC Sources - Operating 3.8.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One 125 VDC electrical B.1 Restore 125 VDC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power subsystem power subsystem to Inoperable for reasons OPERABLE status.
other than Condition A.
C. Required Action and C.i. Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not AND met.
C.2. Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
D. One or both 419 VDC LPCI MOV Independent power D.1. Declare associated LPCI subsystem(s) Inoperable.
Immediately I supply subsystems Inoperable.
JAFNPP 3.8.4-2 Amendment 286
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage on float 7 days charge is:
- a. 'a 127.8 VDC for 125 VDC batteries, and
- b. __396.2 VDC for 419 VDC LPCI MOV independent power supply batteries.
SR 3.8.4.2 Verify each 125 VDC battery charger 24 months supplies > 270 amps at _> 128 VDC for 2t 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
OR Verify each 125 VDC battery charger can recharge the battery to the fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying the largest combined demands of the various continuous steady state loads, after a battery discharge to the bounding design basis event discharge state.
SR 3.8.4.3 - --------------- NOTE ----------------
This Surveillance shall not normally be performed in MODE 1, 2, or 3 for the 125 VDC batteries.
However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity Is adequate to 24 months supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test or a modified performance discharge test.
(continued)
JAFNPP 3.8.4-3 Amendment 286
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
+
SR 3.8.4.4 NOTE ----------------
This Surveillance shall not normally be performed in MODE 1, 2, or 3 for the 125 VDC batteries.
However, portions of the Surveillance may be performed to reestablish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is > 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified AND performance discharge test.
12 months when battery shows degradation or has reached 85% of expected life with capacity < 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected life with capacity
> 100% of manufacturer's rating JAFNPP 3.8.4-4 Amendment 286