JAFP-07-0098, Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3

From kanterella
Jump to navigation Jump to search

Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3
ML072400331
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/13/2007
From: Peter Dietrich
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-07-0098, TAC MD6136
Download: ML072400331 (5)


Text

aSEn tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 Pete Dietrich Site Vice President - JAF August 13, 2007 JAFP-07-0098 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Supplement to Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 (TAC NO. MD6136)

Reference:

1) Entergy Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 (JAFP-07-0088), dated July 17, 2007
2) NRC Memorandum from C. Craig Harbuck to Timothy J. Kobetz, Chief Technical Specifications Branch, Model Application For TSTF-448, Control Room Habitability, Revision 3, dated February 2, 2007

Dear Sir or Madam:

On July 17, 2007 Entergy submitted an application for amendment to Technical Specifications regarding Control Room Envelope Habitability consistent with TSTF-448 Revision 3 (Reference 1) for the James A. FitzPatrick Nuclear Power Plant. Entergy became aware of a typographical error in the Federal Register notice in the model application (Reference 2).

Specifically, in two places the surveillance allowance for SR 3.0.2 should have stated 18 months in lieu of 15 months.

Attachment 1 provides a replacement page 2 of 3 for the application for amendment that reflects this change.

This change is administrative in nature and therefore, does not affect the no significant hazards determination provided in Reference 1.

iýý JAFP-07-0098 Page 2 of 3 There are no new commitments made in this letter.

Should you have any questions concerning this submittal, please contact Mr. Jim Costedio at 315-349-6358.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the &f' day of August, 2007.

PD/ed

Attachment:

1. Revised Page 2 of 3 for Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. John P. Boska, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555

JAFP-07-0098 Page 3 of 3 cc (continued):

Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 101h Floor Albany, NY 12223 Mr. Peter R. Smith, President NYSERDA 17 Columbia Circle Albany, NY 12203-6399

JAFP-07-0098 Attachment 1 Revised Page 2 of 3 for Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 (JAFP-07-0088 Attachment 1)

JAFP-07-0088 Attachment I of the CLIIP Notice of Availability. Based on plant specific design and existing JAF TS requirements sections 3.1., 3.2, 3.3 Evaluation 6, and 3.4 of the SE prepared by the NRC Staff are applicable.

4.3 License Condition Regarding Initial Performance of New Surveillance and Assessment Requirements Entergy proposes the following as a license condition, for JAF, to support implementation of the proposed TS changes:

Upon Implementation of Amendment No. adoptingTSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage required by SR 3.7.3.3 in accordance with TS 5.5.14.c.(i), the assessment of CRE habitability as required by Specification 5.5.14.c.(ii) , and the measurement of CRE pressure as required by Specification 5.5.14.d shall be considered met. Following implementation:

(a) The first performance of SR 3.7.3.3 in accordance with specification 5.5.14.c(i) shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01 Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), dated September 27, 2004, or within 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.

(b) The first performance of the periodic assessment of CRE habitability Specification 5.5.14.c(ii) shall be within 3 years, plus the 9-month allowance of SR 3.0.2 as measured from June 28, 2004, the date of the most recent successful tracer gas test, as stated in Entergy's letter "NRC Generic Letter 2003-01 Control Room Habitability Initial Action Summary Report" (JAFP-04-0159), dated September 27., 2004, or within 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.

(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d shall be within 18 months, plus the 138-day allowance of SR 3.0.2 as measured from the date of the most recent successful pressure measurement test or within 138 days if not performed previously.

5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Consideration Entergy has reviewed the no significant hazards determination published on January 17, 2007 (72 FR 2022) as part of the CLIIP Notice of Availability. Entergy has concluded that the determination presented in the notice is applicable to JAF and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91 (a).

Page 2 of 3