| list | - Information Notice 1994-01, Turbine Blade Failures Caused by Torsional Excitation from Electrical System Disturbance (7 January 1994)
- Information Notice 1994-02, Inoperability of General Electric Magne-Blast Breaker Because of Misalignment of Close-Latch Spring (7 January 1994)
- Information Notice 1994-03, Deficiencies Identified During Service Water System Operational Performance Inspections (11 January 1994, Topic: Biofouling)
- Information Notice 1994-04, Digital Integrated Circuit Sockets with Intermittent Contact (14 January 1994)
- Information Notice 1994-05, Potential Failure of Steam Generator Tubes with Kinetically Welded Sleeves (19 January 1994, Topic: Stress corrosion cracking)
- Information Notice 1994-06, Potential Failure of Long-Term Emergency Nitrogen Supply for the Automatic Depressurization System Valves (28 January 1994)
- Information Notice 1994-07, Solubility Criteria for Liquid Effluent Releases to Sanitary Sewerage Under the Revised 10 CFR Part 20 (28 January 1994)
- Information Notice 1994-08, Potential for Surveillance Testing to Fail to Detect an Inoperable Main Steam Isolation Valve (1 February 1994)
- Information Notice 1994-09, Release of Patients with Residual Radioactivity from Medical Treatment & Control of Areas Due to Presence of Patients Containing Radioactivity Following Implementation of Revised 10 CFR Part 20 (3 February 1994, Topic: Brachytherapy)
- Information Notice 1994-10, Failure of Motor-Operated Valve Electric Power Train Due to Sheared or Dislodged Motor Pinion Gear Key (4 February 1994)
- Information Notice 1994-11, Turbine Overspeed and Reactor Cooldown During Shutdown Evolution (8 February 1994, Topic: Overspeed trip, Overspeed)
- Information Notice 1994-12, Insights Gained from Resolving Generic Issue 57: Effects of Fire Protection System Actuation on Safety-Related Equipment (9 February 1994, Topic: Loss of Offsite Power, Overspeed)
- Information Notice 1994-13, Unanticipated and Unintended Movement of Fuel Assemblies and Other Components Due to Improper Operation of Refueling Equipment (28 June 1994, Topic: Spent fuel rack)
- Information Notice 1994-14, Failure to Implement Requirements for Biennial Medical Examinations and Notification to the NRC of Changes in Licensed Operator Medical Conditions (24 February 1994, Topic: Overspeed)
- Information Notice 1994-15, Radiation Exposures During an Event Involving a Fixed Nuclear Gauge (2 March 1994, Topic: Overspeed)
- Information Notice 1994-16, Recent Incidents Resulting in Offsite Contamination (3 March 1994, Topic: Overspeed)
- Information Notice 1994-17, Strontium-90 Eye Applicators: Submission of Quality Management Plan (QMP), Calibration, and Use (11 March 1994, Topic: Brachytherapy, Overspeed)
- Information Notice 1994-17, Strontium-90 Eye Applicators: Submission of Quality Management Plan (Qmp), Calibration, and Use (11 March 1994, Topic: Brachytherapy, Overspeed)
- Information Notice 1994-18, Accuracy of Motor-Operated Valve Diagnostic Equipment (Responses to Supplement 5 to Generic Letter 89-10) (16 March 1994)
- Information Notice 1994-19, Emergency Diesel Gemerator Vulnerability to Failure from Cold Fuel Oil (16 March 1994)
- Information Notice 1994-20, Common-Cause Failures Due to Inadequate Design Control and Dedication (17 March 1994)
- Information Notice 1994-21, Regulatory Requirements When No Operations Are Being Performed (18 March 1994, Topic: Inactive license)
- Information Notice 1994-22, Fire Endurance & Ampacity Derating Test Results for 3-Hour Fire-Rated Thermo-Lag 330-1 Fire Barriers (16 March 1994, Topic: Fire Barrier)
- Information Notice 1994-23, Guidance to Hazardous, Radioactive and Mixed Waste Generators on the Elements of a Waste Minimization Program (25 March 1994)
- Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters (24 March 1994, Topic: Safe Shutdown)
- Information Notice 1994-25, Failure of Containment Spray Header Valve to Open Due to Excessive Pressure from Inertial Effects of Water (15 March 1994, Topic: Water hammer)
- Information Notice 1994-26, Personnel Hazards and Other Problems from Smoldering Fire-Retardant Material in the Drywell of a Boiling-Water Reactor (28 March 1994)
- Information Notice 1994-27, Facility Operating Concerns Resulting from Local Area Flooding (31 March 1994)
- Information Notice 1994-28, Potential Problems with Fire-Barrier Penetration Seals (5 April 1994, Topic: Fire Barrier, Operability Determination)
- Information Notice 1994-29, Charging Pump Trip During a Loss-of-Coolant Event Caused by Low Suction Pressure (11 April 1994, Topic: Boric Acid)
- Information Notice 1994-30, Leaking Shutdown Cooling Isolation Valves at Cooper Nuclear Station (19 August 1994, Topic: Fire Barrier, Local Leak Rate Testing)
- Information Notice 1994-31, Potential Failure of Wilco, Lexan-Type HN-4-L Fire Hose Nozzles (14 April 1994, Topic: Hydrostatic)
- Information Notice 1994-32, Revised Seismic Estimates (29 April 1994, Topic: Stress corrosion cracking, Earthquake)
- Information Notice 1994-33, Capacitor Failures in Westinghouse Eagle 21 Plant Protection Systems (9 May 1994, Topic: Stress corrosion cracking)
- Information Notice 1994-34, Thermo-LAG 330-660 Flexi-Blanket Ampacity Derating Concerns (13 May 1994, Topic: Fire Barrier, Stress corrosion cracking)
- Information Notice 1994-35, Niosh Respirator User Notices, Inadvertent Separation of the Mask-Mounted Regulator(Mmr) from the Facepiece on the Mine Safety Appliances (16 May 1994, Topic: Stress corrosion cracking)
- Information Notice 1994-35, Niosh Respirator User Notices, Inadvertent Separation of the Mask-Mounted Regulator(MMR) from the Facepiece on the Mine Safety Appliances (16 May 1994)
- Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System (24 May 1994, Topic: Reactor Vessel Water Level, Stress corrosion cracking, Integrated leak rate test, Gas accumulation)
- Information Notice 1994-37, Misadministration Caused by a Bent Interstitial Needle During Brachytherapy Procedure (27 May 1994, Topic: Stress corrosion cracking, Brachytherapy)
- Information Notice 1994-38, Results of Special NRC Inspection at Dresden Nuclear Power Station, Unit 1 Following Rupture of Service Water Inside Containment (27 May 1994)
- Information Notice 1994-39, Identified Problems in Gamma Stereotactic Radiosurgery (31 May 1994)
- Information Notice 1994-40, Failure of a Rod Control Cluster Assembly to Fully Insert Following a Reactor Trip at Braidwood, Unit 2 (26 May 1994)
- Information Notice 1994-41, Problems with General Electric Type CR124 Overload Relay Ambient Compensation (7 June 1994)
- Information Notice 1994-42, Cracking in the Lower Region of the Core Shroud in Boiling-Water Reactors (7 June 1994, Topic: Stress corrosion cracking)
- Information Notice 1994-43, Determination of Primary-to-Secondary Steam Generator Leak Rate (10 June 1994, Topic: Grab sample, Main Steam Line Radiation Monitor)
- Information Notice 1994-44, Main Steam Isolation Valve Failure to Close on Demand Because of Inadequate Maintenance and Testing (16 June 1994)
- Information Notice 1994-44, Main Steam Isolation Valve Failure to Close on Demand because of Inadequate Maintenance and Testing (16 June 1994)
- Information Notice 1994-45, Potential Common-Mode Failure Mechanism for Large Vertical Pumps (17 June 1994, Topic: Biofouling)
- Information Notice 1994-46, Nonconservative Reactor Coolant System Leakage Calculation (20 June 1994, Topic: Unidentified leakage)
- Information Notice 1994-47, Accuracy of Information Provided to NRC During the Licensing Process (21 June 1994)
... further results |
|---|