Semantic search

Jump to navigation Jump to search
  1. Information Notice 1994-47, Accuracy of Information Provided to NRC During the Licensing Process (Issue date: 21 June 1994)
  2. Information Notice 1994-48, Snubber Lubricant Degradation in High-Temperature Environments (Issue date: 30 June 1994)
  3. Information Notice 1994-49, Failure of Torque Switch Roll Pins (Issue date: 6 July 1994, Topic: Stroke time)
  4. Information Notice 1994-50, Failure of General Electric Contactors to Full in at Required Voltage (Issue date: 14 July 1994)
  5. Information Notice 1994-51, Inappropriate Greasing of Double Shielded Motor Bearings (Issue date: 15 July 1994)
  6. Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 (Issue date: 15 July 1994, Topic: Reactor Vessel Water Level)
  7. Information Notice 1994-53, Hydrogen Gas Burn Inside Pressurizer During Welding (Issue date: 18 July 1994, Topic: Loop seal)
  8. Information Notice 1994-54, Failures of General Electric Magne-Blast Circuit Breakers to Latch Closed (Issue date: 1 August 1994, Topic: Operability Determination)
  9. Information Notice 1994-55, Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves (Issue date: 4 August 1994, Topic: Fire Barrier, Anchor Darling)
  10. Information Notice 1994-56, Inaccuracy of Safety Valve Set Pressure Determinations Using Assist Devices (Issue date: 11 August 1994, Topic: Fire Barrier)
  11. Information Notice 1994-57, Debris in Containment and Residual Heat Removal System (Issue date: 12 August 1994, Topic: Fire Barrier)
  12. Information Notice 1994-58, Reactor Coolant Pump Lube Oil Fire (Issue date: 16 August 1994, Topic: Fire Barrier)
  13. Information Notice 1994-59, Accelerated Dealloying of Cast Aluminum-Bronze Valves Caused by Microbiologically Induced Corrosion (Issue date: 17 August 1994, Topic: Fire Barrier)
  14. Information Notice 1994-60, Potential Overpressurization of Main Steam System (Issue date: 22 August 1984, Topic: Fire Barrier, Anticipated operational occurrence)
  15. Information Notice 1994-61, Corrosion of William Powell Gate Valve Disc Holders (Issue date: 25 August 1994, Topic: Fire Barrier)
  16. Information Notice 1994-62, Operational Experience on Steam Generator Tube Leaks & Tube Ruptures (Issue date: 30 August 1994, Topic: Grab sample, Fire Barrier)
  17. Information Notice 1994-63, Boric Acid Corrosion of Charging Pump Casing Caused by Cladding Cracks (Issue date: 30 August 1994, Topic: Boric Acid)
  18. Information Notice 1994-64, Reactivity Insertion Transient and Accident Limits for High Burnup Fuel (Issue date: 31 August 1994, Topic: Boric Acid, Fuel cladding)
  19. Information Notice 1994-65, Potential Errors in Manual Brachytherapy Dose Calculations Generated Using a Computerized Treatment Planning System (Issue date: 12 September 1994, Topic: Brachytherapy)
  20. Information Notice 1994-66, Overspeed of Turbine-Driven Pumps Caused by Governor Valve Stem Binding (Issue date: 19 September 1994, Topic: Boric Acid, Brachytherapy)
  21. Information Notice 1994-67, Problem with Henry Pratt Motor-Operated Butterfly Valves (Issue date: 26 September 1994, Topic: Boric Acid, Brachytherapy)
  22. Information Notice 1994-68, Safety-Related Equipment Failures Caused by Faulted Indicating Lamps (Issue date: 27 September 1994, Topic: Boric Acid, Brachytherapy)
  23. Information Notice 1994-69, Potential Inadequacies in the Prediction of Torque Requirements for and Torque Output of Motor-Operated Butterfly Valves (Issue date: 28 September 1994, Topic: Boric Acid, Brachytherapy)
  24. Information Notice 1994-70, Issues Associated with Use of Strontium-89 and Other Beta Emitting Radiopharmaceuticals (Issue date: 29 September 1994, Topic: Boric Acid, Brachytherapy)
  25. Information Notice 1994-71, Degradation of Scram Solenoid Pilot Valve Pressure & Exhaust Diaphragms (Issue date: 4 October 1994, Topic: Boric Acid, Brachytherapy)
  26. Information Notice 1994-72, Increased Control Rod Drop Time from Crud Buildup (Issue date: 5 October 1994, Topic: Boric Acid, Enforcement Discretion, Fuel cladding, Brachytherapy)
  27. Information Notice 1994-73, Clarification of Criticality Reporting Criteria (Issue date: 12 October 1994)
  28. Information Notice 1994-74, Facility Management Responsibilities for Purchased or Contracted Services for Radiation Therapy Programs (Issue date: 13 October 1994, Topic: Brachytherapy)
  29. Information Notice 1994-75, Minimum Temperature for Criticality (Issue date: 14 October 1994)
  30. Information Notice 1994-76, Recent Failures of Charging/Safety Injection Pump Shafts (Issue date: 26 October 1994)
  31. Information Notice 1994-77, Malfunction in Main Generator Voltage Regulator Causing Overvoltage at Safety-Related Electrical Equipment (Issue date: 17 November 1994)
  32. Information Notice 1994-79, Microbiologically Influenced Corrosion of Emergency Diesel Generator Service Water Piping (Issue date: 23 November 1994, Topic: Through-Wall Leak)
  33. Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems (Issue date: 25 November 1994, Topic: Half scram)
  34. Information Notice 1994-81, Accuracy of Bioassay and Environmental Sampling Results (Issue date: 25 November 1994, Topic: Brachytherapy)
  35. Information Notice 1994-82, Concerns Regarding Essential Chiller Reliability During Periods of Low Cooling Water Temperature (Issue date: 5 December 1994, Topic: Ultimate heat sink, Temporary Modification)
  36. Information Notice 1994-83, Reactor Trip Followed by Unexpected Events (Issue date: 6 December 1994, Topic: Slow transfer)
  37. Information Notice 1994-85, Problems with the Latching Mechanism in Potter and Brumfield R10-E3286-2 Relays (Issue date: 21 December 1994)
  38. Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag (Issue date: 22 December 1994, Topic: Safe Shutdown, Fire Barrier)
  39. Information Notice 1994-87, Unanticipated Crack in a Particular Heat of Alloy 600 Used for Westinghouse Mechanical Plugs for a Steam Generator Tubes (Issue date: 22 December 1994)
  40. Information Notice 1994-88, Inservice Inspection Deficiencies Result in Severely Degraded Steam Generator Tubes (Issue date: 23 December 1994, Topic: Nondestructive Examination)
  41. Information Notice 1994-89, Equipment Failures at Irradiator Facilities (Issue date: 28 December 1994)
  42. Information Notice 1994-90, Transient Resulting in a Reactor Trip and Multiple Safety Injection System Actuations at Salem (Issue date: 30 December 1994)