Ack Receipt of s Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/93-04 & 50-499/93-04
ML20045H349
Person / Time
Site: South Texas  
Issue date: 07/13/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 9307200115
Download: ML20045H349 (4)


Text

{{#Wiki_filter:-, UNITED STATES pm #f o gef ug% NUCLEAR REGULATORY COMMISSION - , [ j REGION 8V

611 HYAN PLAZA DRIVE, SUITE 400 o, [ AH LINGTON. T EXAS 760114064 <, ..... vuL i 3 1993 Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80 Houston Lighting & Power Company ATTN: William T. Cottle, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77251 SUBJECT: NRC INSPECTION REPORT NO. 50-498/93-04; 50-499/93-04 Thank you for your three letters of May 14, 1993, in response to our letter and Notice of Violation dated April 16, 1993.

We have reviewed your replies and find them responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine whether full compliance has been achieved and will be maintained.

Sincerely, f - / / [ ', . f c.

M / ( /. Ku e &,c <& us. i A. Bill Bea h, Director Division of Reactor Projects cc: Houston Lighting & Power Company ATTN: James J. Sheppard, General Manager Nuclear Licensing P.O. Box 289 Wadsworth, Texas 77483 City of Austin Electric Utility Department ATTN: J. C. Lanier/M. B. Lee 721 Barton Springs Road Austin, Texas 78704 9307200115 930713 gDR ADOCK 05000498 PDR l /

- _.

- -... . - - - - - --... --. ---. .. .;

.

, Houston Lighting & Power Company-2-l

City Public Servi _ce Board l ATTN: K. J. Fiedler/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296

Newman & Holtzinger, P. C.

ATTN: Jack.R. Newman, Esq.

1615 L Street, NW , Washington, D.C.

20036 . Central Power and Light Company ATTN: D. E. Ward /T. M. Puckett , ! P.O. Box 2121 , Corpus Christi, Texas 78403 INP0 - Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 , Mr. Joseph M. Hendrie 50 Bellport Lane Bellport, New York 11713 ' Bureau of Radiation' Control-State of Texas 1101 West 49th Street Austin, Texas 78756 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Houston Lighting & Power Company k Suite 610 Three Metro Center Bethesda, Maryland 20814 , Houston Lighting & Power Company ATTN: Rufus S. Scott, Associate General Counsel P.O. Box 61867 ., ', Houston, Texas 77208 l l . .i . t i

.

. JUL I 319% -3-Houston Lighting & Power Company

6cc'f6"DMUL(1E01)

i bcc distrib. by RIV: J. L. Milhoan Resident Inspector Section Chief (DRP/A) Lisa Shea, RM/ALF, MS:.;NBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A) R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS) i i i n RIV:DRP/Af[[o C:DRP/A () D:DRP>>( MASatorius;df WDJohnson" ABBeachN 7/l?/93 7/lk/93 7/(sk93 , ~., _ ~.... . - - _,..

- _ _ .

Juu 1 3 KEB-3_ Houston Lighting & Power Company . bec to DMB (IE01) bec distrib. by RIV: J. L. Milhoan Resident Inspector Secticn Chief (DRP/A) Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)

R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS) , f , ,

A RIV:DRP/Af/5dC:DRP/A () D:DRP.#( I f h MASatorius;df WDJohnson# ABBeacN[ 7/9/93 7/l>/93 7/ \\I/93 ! , , . , - - -., a,,. ,- m - w . < ~ - =,., -, -,,, - - - - - -


-

r .. , , , - \\ a w The Light South Teams Project Electric Generating Station P. O. Box 289 Wadsworth, Temme 77W3 - Houston Lighting Ec Power May 14, 1993 ST-HL-A2-4447 File No.: G02.04 10CFR2.201 Nuclear Regulatory Commission U.

S.

' Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 ,

Docket Nos. STN 50-498; STN 50-499 l Reply to Notice of Violation 9304-01 Regarding a Failure to Adhere to ' Technical Spocifications Because of Inadequate Proceduren f Houston Lighting & Power Company (HL&P) has reviewed Notice of Violation 9304-01 dated April 16, 1993, and submits the attached reply.

Information relating to these events was previously provided by submittal of Licensee Event Reports 1-93-006 and 1-93-008, dated February 19, 1993 and March 4, 1993, respectively.

If you have any questions, please contact Mr.

C. A.

Ayala at (512) 972-8628 or me at (512) 972-7921.

o.A.

W.

H.

Kins y, r.

Vice Presiden, Nuclear Generation RAF/sr Attachment: Reply to Notice of Violation 9304-01 IRi93 134.001 Project Manages on Mchalf of the Partu.lpants in the South Tewas Project ~ T-x. "/ s 'I ad,,f 20*d SE59 246 2iS d15-801D3dSNI IN30IS3d PP:II E66I/90/40 . -

.. ._. _ _ - _ _ - _.

_ _ .. .. . , . STML-AE-4447 H uston Lighting & Power Campan[ing Station ' South Texas Project Electric Generat File No.

G02.04 Page 2' i C: Regional Administrator, Region IV Rufus S.

Scott Nuclear. Regulatory Commission Associate General Counsel ! Gil Ryan Plaza Drive, Suite 400 Houston Lighting & Power Company Arlington, TX 76011 P.

O.

Box 61867 Houston, TX 77208 Project Manager U.S. Nuclear Regulatory Commission Institute of Nuclear Power Washington, DC 20555 Operations - Records Center . 1100 Circle 75 Parkway,_#1500' J.

I. Tapia Atlanta, GA' 30339-3064 Senior Resident Inspector c/o U.

S.

Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Bellport Lane P.

O.

Box 910 Bellport, NY 11713 Bay City, TX 77414 D.

K.

Lacker J.

R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C., STE 1000 Texas Department of Health 1615 L Street, N.W.

1100-West 49th' Street Washington, DC' 20036 Austin, TX 78756-3189 D. E. Ward /T. M. Puckett U.S.

Nuclear Regulatory Comm.

' Central-Power and Light Company Attn: Document Control Desk P.

O.

Box 2121 Washington, D.C.

20555

Corpus Christi, TX 78403 J.

C. Lanier/M.

B.

Lee City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 70704 K.

J. Fiedler/M. T. Hardt City Publio Sorvice , P.

O.

Box 1771 San Antonio, TX 78296 ,, IR\\93 134.001 20'd SCS9 E46 2IS d15-dO133dSNI IN301$3d BP:IT-C66I/90/40 . . _. _, _.. __ . - - - _ _ --

_ _ _. _ _ _ - _.

. _ . . - _. _ ._ _ _ _ _. - __ ' .. ' .

j . Attachment ST-HL-AE-4447 Page 1 of 3 ' I.

Etatement of Vio_lation: A.

Technical Specification 3.3.1 requires that inoperable

overtemperature/ differential temperature channels.

be , , placed in the tripped condition within 6 hours when in f operational Moden 1 and 2.

, Contrary to the above, during the period of January S -12, ' 1993, Unit 1 operated in Mode 1 without tripping the inoperable reactor coolant system delta . temperature / average temperature loop instrument, RC-430.

B.

Technical Specification Table 4.3-2, " Engineered Safety Featurce Actuation - System Instrumentation Surveillance Requirements," states that the High-1 containment pressure channels have to be channel checked each shift when in operational Moden 1 through 4.

Contrary to the above, during the period February 4-6, 1993, the Unit 1 chift channel check requirement of Table 4.3-2 for containment pressure (High-1) had not been accompliched ao required.

Thoso two examples constitute one Severity Level IV violation.

(Supplement I) (498/9304-01)

, II.

II9.uoton 1,1ahtiner & Power position: ) HL&P concurs that the cited violation occurrod.

III.

Roanon for Violation: i The reason for this violation is attributed to inattention to detail.

In both instancon, processes were in place to prevent the occurrence if involved personnel had been diligent in

executing their rocponsibilitica, i

! 1R\\93 134.001 EO*d SES9 246 2IS d15-80133d5NI IN3GIS3d BPiTT E66T/90/40 l . ,.. - ,-. .. - - -. . . .-

- _ - - - - - _ _ - - _ _ _ _ _ -. _ _ - - - - - - - - - - _ _ - - - - _ _. - _ - _ _ _ ._ . . , v v , Attachment ST-HL-AE-4447 Page 2 of 3 IV.

Correctivo Actiong: A.

General Management is continuing its efforts to stress the importance of attention to detail.

Recent examples of thin effort include: 1.

Identificetion of a station lluman Performance specific goal of helping line Coordinator with a departments improvo huma?1 performance.

2.

Implementation of the Plant Manager's Forum to address issues such as personal performance, including attention to dotail and self-verification.

3.

Initiatives, such as setting aside one day a week where station meetings are minimized, aimed at getting management and supervision into the field and in contact with station personnel.

This allows the opportunity for management to personally reinforce performanco expectations and affords station personnel the opportunity to provide feedback directly to their supervisor and/or manager.

l 4.

Site vide group meetings to discuss human performance incuoc and to solicit suggestions from station I personnel on how to improve human performance.

D.

Inoperabic Overtemperature/ Delta Temperature Channels 1.

Unit 1, RC-0430 Temperaturo loop was recalibrated on January 15, 1993, prior to entry into Mode 2.

Results were satisfactory.

2.

Unit 1, RC-0455 and RC-0456 Pressurizer Pressure loops were recalibrated on January 14, 1993.

Results were antisfactory.

3.

Affected calibration procedures have been corrected.

4.

The human performance errors that caused the procedure i error, incorrect calibrations, and nubsequent repeat work activities have been reviewed with Maintenance Department Proceduro writers.

IR\\93 134.001 PO*d SCS9 246 2iS d15-80133dSNI IN30153d 8P:TT C66i/90/40

_.

_ ._ _.

. . ._ ._ _ _ _ _ .,,. , v v . . Attachment ST-HL-AE-4447 Page 3 of 3 i IV.

Corrective Actions: (Continued) C.

Containment Prensure High-1 Channel Chocks 1.

An archival computer report was generated to verify that the containment pressure channels had been within the required tolerancos while in Mode 4.

2.

The operator log in the procedure was corrected to reficct tho Technical Specifications requirement for Containment Prosauro High-1 channel checks.

3.

The Technical Spocification-related operator logs were reviewed for accuracy and completeness.

No other Technical Spocification discrepancies were found.

4.

HL&P has developed a surveillance procedure enhancement program to ensure that surveillance procedures accurately reflect the design basis and adequately , perform the Technical Specification intended function.

i V.

Date of Full compliance: A.

Inoporable overtemperaturo/ Delta Temperature Channels HL&P has been in full compliance since April 15, 1993, when the remaining calibration procedures utilizing the incorrect curve were revised.

B.

Containment Prossure High-1 Channel Checks HL&P has been in full compliance since February 6, 1993, , whon the Operator Log was changed to incorporate the required channel check.

i . 1R\\93 134.001 90'd GES9 22,6 EIS d15-80133dSNI IN3GIS3d 6P: TT EE.6I/90/40 . ... -.. , . -. . - . -,. . - - - . -. -, _

. . - - . The Light company ["'

    • " ' I*
    • ' * * " " ' "
  • *

' Ilouston Listiting & Power May 14, 1993 ST-HL-AE-4446 Filo No.: CO2.04 10CFR2.201 U.

S.

Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Unita 1 and 2 - Docket Nos. STN 50-498; STN 50-499 Roply to Notice of Violation 9304-02 Regarding a Failure to Maintain b519AMato Maintenance Work Proco_clures Houston Lighting & Power Company (HL&P) has reviewed Notice of violation 9304-02 dated April 16, 1993, and submits tho attached reply.

Information relating to thin event was previously provided by submittal of Liconoco Event Report 2-93-002, dated February 26, 1993.

If you have any questions, please contact Mr.

C.

A.

Ayala at (512) 972-8628 or me at (512) 972-7921.

.' ? 'd M ht u. 3 c... f W.

H. Kins Jr.

, Vice President, Nuclear Generation RAF/sr Attachment: Reply to Notice of Violation 9304-02

lR\\93-1$4.QQZ Pro}cct Manager un Bchalf of the Participants in the South Tens Propci i ^ 'j7&,+/ - .< 90*d SES9 246 2IS d15-NO133dSNI IN3G153d 6P:TI EG6T/90/40

( ^ . l :- v v . Houston Lighting & Power Company ST-HL-AE-4446 South Texas Project Electric Generatm3 tation File No.: G02.04 , S 'Page 2 c: Regional Administrator, Region IV Rufun S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 400 Houuton Lighting & Power Company Arlington, TX 76011 P.

O.

Box 61867 Houston, TX 77208 Project Manager U.S.

Nuclohr Regulatory Commission Institute of Nuclear Power Washington, DC 20555 Operations - Records Center 1100 circle 75 Parkway, #1500 J.

I.

Tapia Atlanta, GA 30339-3064 Senior Resident Inspector c/o U.

S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Bollport Lane P.

O.

Box 910 Bellport, NY 11713 Bay City.

X 77414 D.

K.

Lacker J.

R.

New-an, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C., STE 1000 Texas Department of Health 1615 L Street, N.W.

1100 West 49th Street Washington, DC 20036 Austin, TX 78756-3189 D.

E. Ward /T.

M.

Puckett U.S.

Nuclear Regulatory Comm.

Contral Powcr and Light Company Attn: Document control Desk P.

O.

Box 2121 Washington, D.C.

20555 Corpus Christi, TX 78403 J.

C. Lanier/M.

B.

Loo City of Austin Electrio Utility Department 721 Barton Springs Road Austin, TX 78704 K.

J. Fiedler/M. T.

Hardt city Tiblic Sorvice P.

O.

Box-1771 San Antonio, TX 78296

I I 1R\\93-134.002 40*d SES9'246 2iS-d1S-B0133dSNI IN30IS3d OS:TT E66I/90/40 - .- . ... . . ...

- . . - - . . _ . . v v . Attachment ST-HL-AE-4446 Page 1 of 2 I.

statement of violation: Technical Specification 6.8.1 statos, in part, that written procedures chall be established, implomonted, and maintained, including the applicable proceduros recommended in Appendix A of Regulate-J. Ado 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, Paragraph 9, includes procedures for performing maintenance.

Paragraph 9.a of Regulatory Guide 1.33, Appendix A, recommends, in part, that maintenance that dan affect the performance of safety related equipment should be properly preplanned and performed in accordance with documented instructions appropriate to the circumstances.

Contrary to the above, on January 28, 1993, an unplanned Engineered Safety Foaturec actuation occurred because the preventive maintenance work instructions were not appropriate to the circumstancoc and were not proporly performed.

This is a Soverity Level IV violation.

(Supplomont I) (499/9304-02) II.

Houston Lichtino & Power Position: HL&P concure that the citod violation occurred.

III.

Roason for violation: Most of the levol transmitters at STP are of the " wet leg" type, requiring the une of a Wet Calibrator during calibration activj ties.

However, as in thic cituation, there are certain applications where " dry leg" transmitters are utilized.

Each requires a different type of Measuring and Testing Equipment (M&TE) be used during calibration activition.

Failurc to use the proper M&TE can result in falso indication and signals when returning the transmitter to service.

Tho Provontative Maintenance (PM) instruction for this particular activity did not identify the transmitter was a " dry lega nor opecifically identify the correct type of equipment to be used during the calibration.

The I&C Technicians did not recognize the application of the transmitter and used the wrong M&TE.

Use of a Wot Calibrator during calibration and subsequent venting of the transmitter in preparation for returning the device to service, croated a faloc lovel cignal.

This actuated a lovel differential switch connected in parallol with tho transmitter.

Actuation of this switch rosulted in the start of the ESF equipment.

1R\\93-134.0C2 80'd SES9 246 21S d15-80133dSN! 1N30IS3d OS:II E66I/90/40

- _ , - ..... . __ a ...

Attachment ST-HL-AE-4446 Page 2 of 2 i III.

Raason for violation (continuedit Two contributing factors were also identified.

The first was'that the PM instructions did not specifically identify the parallel process-connected ESF actuation equipment (level differential switch) and second, the level differontial switch was not labeled , i as an ESP actuation device.

IV.

Corrective Ac_tions: 1. The identified PM instructions have been revised to add a caution statement that specifies the correct type of test equipment.

2.

ESF actuation labels have been placed on local instrument cabinets for ECW trains in both Units.

Additionally, ESF actuation labels have been affixed to the ESF actuation instrumonts inside the cabinets.

3.

ECW PM instructions have been revised to add steps in the precautions notifying the performer of the parallel process-connected ESF actuation instruments.

4.

This avont has boon discussed with I&C personnel.

This discussion covered aspects of this event with regards to attention to the type of work performed and the equipment being worked on.

Additionally, job ownership, work habits, and attention to detail were discussed.

S. HL&P has performed an ovaluation to determine if the need for . additional training on the use of Measuring and Testing i Equipment is required.

The evaluation concluded that the t current training on the use of M&TE is adequate and additional instruction is not necessary.

6.

HL&P has completed a review of similar PM activities to ensure that proper cautions exist so that the correct type of calibration is usod for the application and is currently in the process of adding the necessary precautions.

PMs identified as needing additional clarification will be revised by May 28, 1993.

V.

Date of Full Compliance: IIL&P will be in full compliance by May 28, 1993, upon completion of PM upgrades.

IR\\93 134.002 60*d SES9 246 EIS d15-NOD 3 dst 41 D43GIS3d 19:11 E66T/90/40 __ - _ ,__ ,_ .-. . .

, I ~ ,. ~ v . The Light company 8nuthTnas jen Electric Gematkg Station P.O. Box m Wadmoe,hm 77W Itouston Lighting & Power ___

May 14, 1993 ST-HL-AE-4439 File No.: G02.04

10CFR2.201 U.

S.

Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 l Docket Noc. STN 50-498; STN 50-499 Roply to Notico of Violation 9304-03 Renardina a Failure to Maintain Minimum Shift Staffine Houston Lighting & Power Company (HT.&P) has reviewed Notice of violation 9304-03, dated April 16, 1993, and submits the attached ] reply.

f If you have any questionn, please contact Mr.

C.

A.

Ayala at (512) 972-0628 or mc at (512) 972-7921.

< f , ( 'N w..te

W.'H. Kins , Jr.

-{ Vice President, Nuclear Generation RAP /sr Attachment Reply to Notice of Violation 9304-03 )

iR\\93 130.001 Pavica Manager on Behalf of the Partiupants in the South Texas Projcu-s., s < , , ") - c/ / (, ,.r-g m + 01*d SES9 246 21S d15-80103dSNI IN30IS38 iS:TT E66I/90/40 - -

_ = _. ._.

_.

' , v v , Houston Lighting & Power Company ST-HL-AE-4439 South Texas Project Electric Geocrating Station File No.

G02.04 Page 2 c: Regional Administrator, Region IV Rufus S.

Scott Nucionr Regulatory Commiccion Accociate General Counsel Gil Ryan Plaza Drive, Suito 400 Hounton Lighting & Power Company Arlington, TX 76011 P.

O.

Box 61867 Houston, TX 77208 , Lawronoe E.

Kokajko Projcot Manager U.S.

Nuclear Regulatory Commission Institute of Nuclear Power EAshington, DC 20555 13H15 Operations - Records Center 700 Galloria Parkway J.

I.

Tapia Atlanta, CA 30339-5957 Sonior Resident Inspector c/o U.

S.

Nuclear Regulatory Dr. Joseph H. Hendrie Commission 50 Bellport Lane P.

O.

Box 910 Bellport, NY 11713 Bay City, TX 77414 D.

K.

Lacker J.

R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C., STE 1000 Texas Department of Health 1615 L Stroot, N.W.

1100 West 49th Street Washington, DC 20036 Austin, TX 78756-3189 D.

E. Ward /T.

M.

Puckett U.S.

Nuclear Regulatory Comm.

, Contral Power and Light Company Attnt Document Control Desk P.

O.

Box 2121 Washington, D.C.

20555 Corpus Christi, TX 78403 J.

C. Lanier/M.

B.

Lee City of Austin i Electric Utility Department 721 Barton Springs Road i Auctin, TX 78704 K.

J. Fiedler/M.

T.

Hardt City Public Service P.

O.

Box 1771 San Antonio, TX 78296 TT*d SES9 246 2iS d15-dO133dSN1 IN3GIS3d ES:TT E66I/90/40

F.

,. v s . Attachment ST-HL-AE-4439 Page 1 of 2 I.

statement of Violation: Technical Specification Soction 6.2.2.b states, "at least one licensed operator shall be in the control room when fuel is in the reactor.

In addition, while the unit is in Mode 1, 2, 3, or 4, at least one licensed senior operator shall be in the control room."

Contrary to the above, on February 14, 1993, the Unit 2 control room was not staffod by a senior reactor operator for 41 seconds while the unit was in Mode 4 operation.

This is a Severity Level IV violation.

(Supplement I) (499/9304-03) II.

Houcton Linhtinn & Power Position: HL&P concura that the cited violation occurred.

III.

Rean_on for Violation: The reason for this violation was inappropriate actions on the part of the Unit Supervisor.

The Unit Supervisor was cognizant of his responsibi~.ity to maintain control room command function in the absence of the Shift Supervisor.

Ilowever, his preoccupation with the surveillanco in progress caused his loss of focus on his primary responsibility, resulting in a violation of Technical Specifications.

, IV.

Correctivo Actions: 1.

A Human Performanco Review Board was conducted with the Unit Supervisor and representatives from Operations, Training, Correctivo Action Group, and Management.

As a result, the Plant Manager will discuss the command and control function requirements with Licenced Senior Operators filling the positions of Shift Supervisor and Unit Supervisor.

These discussions will completed by June 11, 1993.

2.

The Licensed operator Licenso Maintenance procedure will be revised to add a required discussion between Licensed operators and Plant operations Manager concerning command and ' control functions.

Theco diccucsions will be held prior to License Activation Cortification. The procedure revis1on will be completed by August 9, 1993.

8R\\93-130.001 2I*d SCS9 246 2IS d15-BOD 3dSNI IN30IS3d 2S:TT E661/90/40

[ .- , . v m Attachment ST-HL-AE-4439 Page 2 of 2 IV.

Corrective Action (Continued): - 3.

This event will be included in the lessons learned portion of the Licensed Operator Requalification Program by , ' July 16, 1993.

V.

Date of Full Conollances HL&P has been in full compliance since February 14, 1993, when the Unit Supervisor re-entered the Unit 2 control room approximately 41 seconds after exiting.