IR 05000498/1986041

From kanterella
Jump to navigation Jump to search
Partially Withheld Safeguards Insp Repts 50-498/86-41 & 50-499/86-41 on 861215-18 (Ref 10CFR73.21).No Violations or Deviation Noted.Major Areas Inspected:Security Plan & Implementing Procedures.Details Withheld
ML20207S341
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/25/1987
From: Joseph Kelly, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20207S326 List:
References
50-498-86-41, 50-499-86-41, NUDOCS 8703190291
Download: ML20207S341 (1)


Text

..

,

APPENDIX U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-498/86-41 Construction Permits:

CPPR-128 50-499/86-41 CPPR-129 Dockets:

50-498 Category:

A2 50-499 Licensee:

Houston Lighting & Power Company (HL&P)

P. O. Box 1700 Houston, Texas 77001 Facility Name:

South Texas Project, Units 1 and 2 Inspection At:

South Texas Project, Matagorda County, Texas

'

Inspection Conducted:

December 15-18, 1986 Inspector:

CQ3 k_

Q{Q-h87 J.

F. Kelly, Senior Ppsil>l Sacurity Date nspector Approved:

L/

.

AkO

.

L.'A. Yanfell, Chief, Emergency Preparedness Date and Safeguards Programs Section Inspection Summary Inspection Conducted December 15-18, 1986 (Report 50-498/86-41; 50-499/86-41)

Areas Inspected:

Routine, announced preoperational inspection of security plan and implementing procedures, security program audit, and the transportation and receipt of special nuclear materials.

Results: Within the three areas inspected, no violations or deviations were identified.

ENCLOSURE CONTAINS.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

C703190291 870312 PDR ADOCK 05000498 O

PDR

_