Insp Rept 50-482/93-04 on 930222-24 & 0301-05.No Violations Noted.Major Areas Inspected:Engineering & Technical Support Activites,Including Permanent Design Changes & Mods, Temporary Mods & Relief Valve Sizing
ML20035F340
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/06/1993
From: Howell A, Mullikin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20035F337 List:
References
50-482-93-04, 50-482-93-4, NUDOCS 9304210172
Download: ML20035F340 (65)


Text

_ ___-_ - -__ _ - -

.

.-

l Appendix U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-482/93-04 Operating License: NPF-42 Licensee: Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Facility Name: Wolf Creek Generating Station Inspection At: Coffey County, Burlington, Kansas Inspection Conducted:

February 2 -24 and March 1-5, 1993 2N[

-

--

M h-4- TS Acting Team Leader:

R. P. Mullikin, Acting Team L'eader Date Technical Support Section, Division of Reactor Projects Team Members:

T. F. Westerman, Chief, Engineering Section Division of Reactor Safety R. K. Frahm, Jr., Vendor Inspector (Rotational Assignment)

Engineering Section, Division of Reactor Safety P. A. Goldberg, Reactor Inspector, Engineering Section Division of Reactor Safety W. M. McNeill, Reactor Inspector, Engineering Section Division of Reactor safety R. B. Vickrey, Reactor Inspector, Engineering Section Division of Reactor Safety Accompanying Personnel:

W. D. Reckley, Project Manager Office of Nucle Rea tor ulation

/

Approved:

M t(.

Ju / {

f'~b h Arthur T. Hcwely, Deputy Dir'sctor Date DivisionofRea@torSafety-i-9304210172 930415 PDR ADOCK 05000482 G

PDR

_ _ _ _ _ _ _ _ _ _

.-

SUMMARY TIME FOR ESSENTIAL CONTROL ROOM DRAWINGS TO BE

UPDATED HAS BEEN REDUCED TO LESS THAN 15 DAYS MAIN ANNUNCIATOR WINDOWS LIT DUE TO LOCKED

IN ALARMS HAS BEEN REDUCED FROM 12 TO 4 WORK REQUESTS TAGGED IN CONTROL ROOM WHICH REQUIRE

ENGINEERING EVALUATION HAS BEEN REDUCED FROM 10 TO --

PROCUREMENT RELATED DOCUMENTS HAVE BEEN REDUCED

BY 46%

i

..

...

.

.

.

m

.

...

.

_ _-.-,.-.

_-*--,,6.-

-

-

...

.

..-

-

.

-.

_

.

_

.

- -

-.

_

-

-

-

~.

SINCE JUNE 1992 MEETING WITH THE NRC CWR BACKLOG HAS DECREASED BY 7% (DISCOUNTING THE

'

205 WR STEP INCREASE CAUSED BY THE INDUSTRY THERMO-LAG ISSUE)

EERS HAVE BEEN REDUCED BY 48%

ITIPS HAVE BEEN REDUCED BY 43%

!

FIELD CHANGE REQUESTS HAVE BEEN REDUCED BY 55%

l l

-

-

.

, _ _

- - - -

_- - - - - - - - - - - - - - - - - - -

I

-

.

i

\\

O

\\

CC z

\\

k w

D

\\

O m% m

\\

O O

o hz

!

1 e-ct

,

i i

tu

\\

Q

,

'

!

.

w x----

-

ee-

,*m..

,,-.-

.

-,-,--,-..--___,._-,,,-,-..-m_m._

-

-

.

,--,,__,

..m.-e

-

.

_

- _ - -

..

L OBJECTIVES:

DEVELOP A DESIGN CHANGE AND CONFIGURATION PROCESS THAT SATISFIES LICENSING AND REGULATORY REQUIREMENTS IN AN EFFICIENT MANNER

ENHANCE THE RESPONSIVENESS OF ENGINEERING TO PLANT NEEDS l

.

EMPOWER USER GROUPS

!

l

.

..

..

.

.

.

.

.

.

.

---

_

_

_.

..

ENHANCEMENTS COMPLETED TO DATE:

USAR REVISED TO INCLUDE DEFINITION OF A CONFIGURATION

CONTROL PACKAGE NEW PLANT MODIFICATIONS AND CONFIGURATION CHANGE PROCESS

'

PROCEDURE HAS BEEN DEVELOPED SPECIFICATIONS PROCEDURE HAS BEEN REVISED

REPAIR AND REWORK DEFINITIONS HAVE BEEN CLARIFIED

i KGP-1131 " PERMANENT MODIFICATION AND CONFIGURATION

CONTROL" PROCEDURE HAS BEEN REVISED A FIELD CHANGE PROCESS DEVELOPED BY SYSTEMS ENGINEERING

SIX DESIGN GUIDES HAVE BEEN DEVELOPED

i

-

-

-

- -

-

-

- - - - -

-

- - -

.

-

- -

r-PEP ACTION PLAN DELIVERABLES:

EXPANSION OF THE GMR/SSR BOUNDARIES

RELAXATION OF THE CONFIGURATION CONTROL BOUNDARIES

BASED ON PRA OR SIMILAR METHODOLOGY FUNCTIONAL FLOW CHART DEVELOPMENT OF THE DESIGN CONTROL

PROCESS BASED ON REGULATORY REQUIREMENTS CLARIFY OR REVISE THE REPAIR AND REWORK DEFINITIONS

'T CLARIFY OR REVISE THE USAR DEFINITION OF DESIGN

EXPAND THE FIELD DISPOSITION METHODOLOGY

EVALUATE A STREAMLINED APPROACH FOR CONTROLLING

VENDOR MANUALS

.

i REVISE PROCEDURES TO ENHANCE, CLARIFY, AND STREAMLINE

THE DESIGN CHANGE PROCESS

'

.

_

-.