Ack Receipt of Re Steps Taken to Correct Deviation Noted in IE Insp Repts 50-460/79-06 & 50-513/79-06.Corrective Actons Will Be Verified During Future Insp
ML19207A938
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/01/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19207A933 List:
References
NUDOCS 7908230064
Download: ML19207A938 (1)


Text

pnMc

[

og'o, UNITED STATES

..

NdCLEAR REGULATORY COMMISSION

,

E 3.,q g

-

cc

REGION V

"'"

f

[

1990 N. CALIF ORNI A BOULLVARD o, -

,

% ' 'U,' [

SUITE 202, WALNUT CREEK PLAZA WALNUT CRE E K, C A LIFORNI A 94596 4.

,*

AUG 1 813 Docket flos. 50-460 50-513 Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Attention: Mr. fl. O. Strand Managing Director Gentlemen:

Thank you for your letter dated July 19, 1979 informing us of the steps you have taken to correct the item which we brought to your attention in our letter dated June 22, 1979.

Your corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, fjhc~hg G'

G. S. Spencer, Chief Reactor Construction and

. Engineering Support Branch 78G162

,-

'a\\