APPENDIX A Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Docket No. 50-460 Construction Permit No. CPPR-134 Notice of Deviation Based on the results of an NRC inspection conducted at the WNP-1 site on April 24-27, 1979, it appears that one of your activities was not conducted in accordance with your commitments to the Commission as indicated below:
Contrary to the commitment in Sections 3.2.2.3, 3.2.4.1, and Table 3.2-2 of the PSAR, a pipe spool classed as ASME Section III, Class 3 (WPPSS Quality Class I) for the Containment Equipment and Floor Drains (DFR system), was found to contain a field fabricated weld which did not meet the requirements of ASME Section III, Class 3 as stated in Section ND 5300 of the ASME B&PV Code.
In this weld, the inspector observed that three or more inches of the weld root lacked complete fc31on. The weld (No. 500 of the DFR System) had been accepted.
I 786152 790 8 2 3 0015T)