Forwards Response to Re Item of Deviation Noted in IE Insp Repts 50-460/79-06 & 50-513/79-06.Corrective Actions:Weld & Spool Piece Repaired & Deviation Documented
ML19207A940
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/19/1979
From: Kenberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19207A933 List:
References
GO1-79-415, NUDOCS 7908230067
Download: ML19207A940 (2)


Text

-

SP /

ky' Washington Public Power Supply System A JOINT OPERATING AGENCY L9

}.u P. o. Dos e au sooo c.s o. wa.w mo rom wa r nm t a

u. w.

n...c ron 9 9 3 5 2 P ome (so9) 3745000 July 19, 1979 i

G01-79-415 g

5,g;

h. N'.

..,h.

Nuclear Regulatory Connission Region V Suite 202, Walnut Creek Plaza 1990 N. California Boulevard Walnut Creek, California 94596 Attention:

Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Dear Mr. Spencer:

Subject:

WPPSS Nuclear Projects Nos. 1/4 NRC Inspection - WNP-1/4 Dates of Inspection - April 24-27, 1979 Docket Nos. 50-460 and 50-513 Construction Pennit Nos. CPPR - 134 and 174

Reference:

Letter from G. S. Spencer to N. O. Strand, fiRC Inspection WNP-1 & 4, dated June 22, 1979 This is in response to the reference letter which discussed the results of the April 24-27, 1979 inspection of activities authorized by NRC Construction Permits Nos. CPPR - 134 and 174.

The reference letter identified a certain activity which was not conducted in full compliance with PSAR requirements, as set forth in the Notice of Deviation, enclosed as Appendix A.

This item of noncompliance has been categorized into a level as described in your correspondence to all NRC licensees dated December 31, 1974.

l\\

nos2aoohg 786159

.... -5 j qq-

G. S. Spencer July 19, 1979 G01-79-415 Page 2 The specific flRC finding, as stated in the reference letter and the Supply System response is provided herewith as Appendix A.

Very truly yours, O ~ci D. L. Renberger Assistant Director - Technology DLR:TJH:js Attachment cc:

CR Bryant - BPA SB Barnes - UE&C, Phil.

BD Redd - UE&C, Phil.

J. Freeman - UE&C, Phil.

786160

t APPEf1 DIX A Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 fl. California Boulevard Walnut Creek, California 94596 Docket Nos. 50-460 and 50-513 Construction Permit Nos. CPPR - 134 and 174 Notice of Deviation Based on the results of an f4RC inspection conducted at the WNP-1 site on April 24-27,1979, it appears that one of your activities was not conducted in accordance with your commitments to the Commission as indicated below:

Contrary to the commitment in Sections 3. 2. 2. 3, 3. 2. 4.1, a nd Table 3.2-2 of the PSAR, a pipe spool classed as ASME Section III, Class 3 (WPPSS Quality Class I) for the Containment Equipment and Floor Drains (DFR system), was found to contain a field fabricated weld which did not meet the requirements of ASME Section III, Class 3 as stated in Section ND 5300 of the ASME B&PV Code.

In this weld, the inspector observed that three or more inches of the weld root lacked complete fusion. The weld (No. 500 of the DFR System) had been accepted.

Supply System Response Action Taken to Correct the Identified Item The Contractor initiated nonconformance report number 1-CNCR-211-005 on April 26, 1979 to document the discrepant weld.

Weld number 500, spool piece number DFR-412088-4 was repaired and subsequently accepted on May 10, 1979.

Action Taken to Preclude Recurrence The Contractor conducted a training session on May 4,1979 to reiterate that all defective welds will be documented in a Cf!CR.

Inspectors are to assure that internal surface of the root pass is acceptable, as per Visual Inspection Procedure JAJ-NDE-008.

Date of Full Compliance Full compliance was achieved May 10, 1979.