APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-458/85-79 License:
NPF-47 Docket:
50-458 Licensee:
Gulf States Utilities P. O. Box 2951 Beaumont, Texas 77704 Facility Name:
River Bend Station Inspection At:
River Bend Site, St. Francisville, Louisian:
Inspection Conducted:
December 2-6, 1985
- /I/E4 Inspectors:
W. R. Bennett, Project Engineer, Project Date Section A, Reactor Projects Branch k
M Approved:
_
hfef, Prkject Section A Dafe (
/ M J. P Jabdon, Re t Q Pr 'ects Branch Inspection Summary Inspection Conducted December 2-6, 1985 (Report 50-458/85-79)
Areas Inspected:
Routine, announced inspection of startup test procedure review (turbine trip) and startup test witnessing.
The inspection involved 37 inspector-hours onsite by one NRC inspector.
Results: Within the two areas inspected, no violations or deviations were identified.
8601210344 e60113 PDR ADOCK 05000458 G
g
'
g
.
-
?
k
.*,{
,
,
.
..
' -.
'.
{c
'
L
.
,
-.
,
-
- '
..
'
'
-
.
.
I
'
'
DETAILS
<
%
ii 1..
Persons Contacted
- W. 'J.
Cahill, Senior Vice President
- T. L. Crouse, Manager, Quality Assurance (QA)
- J. C. Deddens, Vice President l
- P. E. Freehill, Superintendent Startup and Test
- D. R. Gipson, Assistant Plant Manager Operations
- G. R. Grant, Supervisor-Licensing
.
i
'*R. W. :Helmick, Director Projects
- G. R. Kinsnell, Supervisor Operations QA j
T.'F. Plunkett, Plant Manager-
!^
- J. G.'Spivey, QA Engineer
.
- R. B. Stafford, Director Operations QA
- P. F. -Tomlinson, Director Quality Services
- D. W. Williamson, Operations Supervisor Stone and Webster
- B.'R.-Hall, Assistant Superintendent Field Quality Control i
The NRC inspector also contacted other site personnel including administrative, clerical, operations, and testing personnel.
,
!
- Denotes those attending the exit interview conducted on December 6, 1985.
2.
Turbine Trip Test Procedure Review The purpose of this portion of the inspection was to ascertain whether the turbine trip test was consistent with regulatory requirements, license commitments, and Technical Specifications (TS).
The NRC inspector reviewed Test Procedure 1-ST-27, " Turbine Trip and Generator Load Rejection," Revision 0, and Major Change Request (MCR)-1
i'
for-Test Procedure 1-ST-27. The procedure met all Regulatory Guide 1.68, FSAR, and TS requirements; however, the NRC inspector noted several minor errors in the procedure. The licensee was informed of these errors and took corrective action, which the NRC inspector considered to-be
-
'
satisfactory.
No violations or deviations.were identified in this portion of the ( l.
inspection.
R; 3.:
Startup Testing Witnessing
,The purpose of this portion of the inspection was to ascertain conformance of the licensee to license and procedural requirements and to observe operating staff performance.
,
,
p
-
L~-
_
m
'
-
>
.-
.
The NRC inspector witnessed portions of Reactor Core Isolation Cnoling and Safety Relief Valve testing.
All observed portions of the tests were performed and documented in accordance with approved procedures.
The actions of test and operations personnel during performance of the test appeared to be correct, timely, and well coordinated.
No violations or deviations were identified in this portion of the inspection.
4.
Exit Interview An exit interview was held on December 6, 1985, with the personnel denoted in paragraph 1 of this report.
The NRC senior resident inspector also attended this meeting.
At this meeting, the scope of the inspection and the findings were summarized.