Ack Receipt of 850508 & 0624 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/85-12
ML20129C080
Person / Time
Site: River Bend 
Issue date: 07/23/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20129C084 List:
References
NUDOCS 8507290341
Download: ML20129C080 (1)


Text

w

-

.

JUL 2 31885 In Reply Refer To:

Docket:

50-458/85-12 Gulf States Utilities ATTN: William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group P. O. Box 2951 Beaumont, Texas 77704 Gentlemen:

Thank you for your letters dated May 8 and June 24, 1985, in response to our letters, dated April 8 and May 28, 1985. We have no further questions at this time and will review your corrective action during a future inspection.

Sincerely

.

Original SISned OY E. H. Johnson E. H. Johnson, Chief Reactor Project Branch cc:

Gulf States Utilities ATTN:

J. E. Booker, Manager-Enginaering, Nuclear Fuels'& Licensing P. O. Box 2951

. Beaumont, Texas 77704 Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director distrib. by RIV:

~

R. P. Denise, DRSP

'

idhntInspector R. D. Martin, RA Section Chief, RPB/A D. Weiss, LFMB (AR-2015)

RSTS Operator RIV File

,

RIV:RPB/

RPB JPJaudon/lk EHJohnson 1/g,/85-1/0/85 r

8507290341 850723 IEo 8 gDR ADOCK 050

.

'E u-

_

.. _

_..

-

.

'

.

.

e e

r...': ' ['k

.

GULF STATES UTILITIES COMPANY ' ~

RIVE R BEND ST AflON POST Of HCf 80x 220 ST f RANC1$VILLE, LOUlstANA 70775 ARE A CODE 504 635 6094 346 8651

.

.

May 8, 1985 RBG-20934 File Nos. G9.5, G15.4.1

~

.

i

_ - -

j Mr. Robert D. Martin, Regional Administrator U. S. Nuclear Regulatory Commission hIkb_d$b

.

d Region IV 611 Ryan Plaza Drive, Suite 1000 N!d Arlington, Texas 76011 Ii

Dear Mr. Martin:

"

l

--- O River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/ Report 85-12 This is in response to the Notice of Violations contained in NRC I6E Inspection Report No. 50-458/85-12. The inspection was

,

performed by Messrs.

W. M. McNeill, I. Barnes, and W. R. Bennett during the period February 25 - March 1,1985, of activities authorized by NRC Construction Permit CPPR-145 for River Bend -

Station Unit No. 1.

Gulf States Utilities Company's (GSU) response to the Notice of Violations 85-12-01, " Independent Review of Design Change Cal-culations," and 85-12-02, " Control of Temporary Alterations," is provided in the enclosed attachment. This completes GSU's response to the Notice of Violations.

Sincerely,

'

/'

,

W. J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group WJC/P3D/TCC/TFP/amg Attachment

'

Ll )

'

s

-

.. " 3

,

JC-0%Ess'

_

.

._

-

_

_ __

_

.

.

.

e ATTACINENT

May 8, 1985

-

>

RBG-20934

'

Response to Notice of Violations Reference

'

Notice of Violation - E.11. Johnson letter to W. J. Cahill, dated April 8, 1985.

Refer to Docket No. 50-458/85-12.

.

1.

Response to 85-12-01' Independent Review of Design Change Calculations _

Corrective -Steps Which Itave Been Taken and the Results Achieved i

a.

The NRC Inspector reviewed 53 Engineering Mechanics Division (EMD) calculations and identified three calculations which had not been signed off by an independent reviewer. A subsequent Engineering Assurance surveillance reviewed 471 additional calculations and identified two calculations which had not been

';

signed off by an independent reviewer. Thus, five calculations were identified out of a total sample of 534 calculations.

Only one of the five calculations identified had been processed after implementation of the preventative action asscciated with Engineering Assurance audit A0-12210-195 conducted on October 12, i

1984, which reported a similar problem.

7he five calculations identified have been reviewed and approved.

'

b.

A sample review of the structural calculation books examined by the NRC indicated that approximately six percent of all calcu-

,

lation pages did not exhibit an "I" next to the reviewer's signature or the independent reviewer's signature.

A 100 percent review of all SEG structural calculations was subsequently performed.

Where any deficiency was noted, the independent review was appropriately documented and reflected in calculation files.

.

Corrective Steps Khich Will Be Taken to Avoid Further Violations a.

The requirements of Engineering Assurance Procedure (EAP) 5.3

'

were reemphasized to all applicable EMD engineers during a l^

meeting conducted March 5, 1985.

No further corrective action will be implemented since each EMD calpulation is subject to a final design verification

. process. This process will ensure the reconciliation of all installed hardware to the approved design base.

,

-

r-~

... -. -

.,-w--

,.. - -,.,

,

., -..,,,.

,_,

-

,.,, - -

-,>n,,..n..

,

r -

. _ _. _ _.. _ -.. _.

.

.

.

.

.

.

Page 2 May 8,1985 RBG-20934

.b.

The requirements of Structural Technical Procedure 11.5 and EAP

'

5.3 were reemphasized to all applicable SEG Stnictural Engineers and documented training was performed on April 15, 1985.

Date hhen Full Compliance Will Be Achieved a.

Full compliance will be achieved by fuel load, b.

Full compliance was achieved by May 1, 1985.

..

+=

yc--r-m-r-

+.v 9r.-

. - - - --

_

_ _ _

_ _ _

_ _ _. _ _

. '.

T.

.

s Page 3 May 8, 1985 RBG-20934

.

'2.- Response to 85-12-02 Control of Temporary Alterations Corrective Steps' Which llave Been Taken and the Results Achieved Corrective action was taken immediately and in the presence of the NRC Inspector to bring temporary alteration 85EGS-009 into compliance with River Bend Startup Manual Test Instruction No. 17.

The temporary alteration log was then audited by the GSU Project Quality Test Group (PQTG). The audit was completed by March 31, 1985,' and the minor discrepancies identified by the PQTG have been corrected to ensure compliance with Test Instruction No. 17.

Corrective Steps Which Will Be Taken To Avoid Further Violations GSU's Startup and Test Group has assigned dedicated personnel to assure that procedural compliance is maintained. These personnel will control entries to the temporary alteration log and verify correct installation and/or removal of temporary alterations.

Date When Full Compliance Was' Achieved

Full compliance.was achieved by April 30, 1985.

-. _. _ _ __ - ___________

C_.

_ -.

'

..,

- '

-

UNITED STATES OF AMERICA

,

'

NUCLEAR RECUIATORY COMMISSI'ON STATE OF LOUISIANA

PARISH OF WEST FELICIANA

$

In the Matter of

Docket Nos. 50-4S8 50-459 CULF STATES UTILITIES COMPANT

.

(River Bend Station.

Unit 1)

.

AFFIDAVIT W.

J.

Cahill, Jr.,

being duly sworn, states that he is a Vice President of Culf States Utilities Company that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such doci.ments are true and correct to the best of his knowledge, information and belief.

,

/f l

-

W. J ahill, Jr. [!

Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this

-

day of th/

, 19 I.

-

.

h_

.C (#

'

oan W. Middlebrook's

/ Notary Public in and for West Feliciana Parish, Louisiana My Commission is for Life.