IR 05000458/1979003
| ML19252A290 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/15/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Weignad J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML17198A006 | List: |
| References | |
| NUDOCS 7910020132 | |
| Download: ML19252A290 (2) | |
Text
-/s' a
_
.
[pe n jo UNITED STATES c
e*
'g NUCLEAR REGULATORY Cr.AMISSION o
$
E
REGION IV
.:
0,,
611 RYAN PLAZA DRIVE, SUITE 1000
' d#
d ARLINGTON, TEXAS 7G012
- ...*
August 15, 1979 In Reply Refer To:
RIV Docket No.
50-45S/Rpt. 79-03 Gulf Stat.:s Utilities ATIN:
Lr. J. G. Weigs.nd, General Manager
..acicar Projects Post office Sax 2951 Beaumont, Texas 77704 Gentlemen-
.
'fessrs C. R. Oberg and J. I. Tapia of This refers to the inspection conducted b.x our staff during the period July 16-19, 19,9, of activities authorized by NRC Construction Permit No. CPPR-145 for River Bend, Unit No. 1, and to the discussion of our findings with Mr. J. E. Wimberly and other members of your staff at the con-clusion of the inspection.
Areas examined during the inspection and our findings are discussed in the en-closed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
Within the scope of the inspection, no items of noncompliance were identified.
We have also examined actions you have taken with regard to previously identified inspection findings. The status of these items is identified in paragraph 2 of the enclosed report.
Oac new unresolved item is identified in paragraph 5 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If the report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure.
'Ihe application must include a full statement of the reasons why it is claimed that the information is proprietary.
The application should be prepared so that any proprietary information identified is contained in an enclosure to the application, since the application without the enclosure will also be placed in the Public Document Room. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
1074 354 0 / 3}
g 793002
Gulf States Utilities
August 15, 1979 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Siacerely, zw:
-
W. C. Seidle, Chief Reactor Construction and Engineering Support Branch Enclosute:
IE Inspection Report No. 50-458/79-03 1074 355