Forwards Safety Insp Repts 50-456/85-58 & 50-457/85-54 on 851202-860124.No Violations Identified
ML20153C657
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/10/1986
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153C655 List:
References
NUDOCS 8602210429
Download: ML20153C657 (2)


Text

r Ad p

February 10, 1986 Docket No. 50-456 Docket No. 50-457

Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. D. Schulz and W. J. Kropp of this office on December 2,1985 through January 24, 1986, of activities at the Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with Mr. D. Shamblin at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these. areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter sill be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

!

W. S. Little, Director l

l Braidwood Project f

Enclosure:

Inspection Report

No. 50-456/85058(DRP);

!

No. 50-457/85054(DRP)

See Attached Distribution

f

RIII

RIII

RIII

RI

[

l

W

r

c@

J n)h

IP'

g il

F gl,ske/jlk

Fg

Ring

C."iP ues

anielson

e

j

J.(Auges1T

?q

Gaky

Lit e

2 /w/g,

ner

3ll

} l

8602210429 060210

If

PDR

ADOCK 05000456

36)

G

7.

O

Commonwealth Edison Company

February 10, 1986

.

Distribution

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RS8 (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB