Text
r Ad p
February 10, 1986 Docket No. 50-456 Docket No. 50-457
Commonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. D. Schulz and W. J. Kropp of this office on December 2,1985 through January 24, 1986, of activities at the Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with Mr. D. Shamblin at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these. areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No violations of NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter sill be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
!
W. S. Little, Director l
l Braidwood Project f
Enclosure:
Inspection Report
No. 50-456/85058(DRP);
!
No. 50-457/85054(DRP)
See Attached Distribution
f
RIII
RIII
RIII
RI
[
l
W
r
c@
J n)h
IP'
g il
F gl,ske/jlk
Fg
Ring
C."iP ues
anielson
e
j
J.(Auges1T
?q
Gaky
Lit e
2 /w/g,
ner
3ll
} l
8602210429 060210
If
ADOCK 05000456
36)
G
7.
O
Commonwealth Edison Company
February 10, 1986
.
Distribution
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RS8 (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB