IR 05000445/1990033

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 901031 in Region IV Ofc to Discuss Insp Rept 50-445/90-33
ML20058A518
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/17/1990
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9010290005
Download: ML20058A518 (2)


Text

..

-

._.-.

__

,

, frf# %,

UNITED STATES

-

[*~

"$

NUCLEAR REGULATORY COMMISSION

  • . $

REoloN IV D

d'

611 RYAN PLAZA DRIVE, SUITE 1000

%,,,,,8 ARLINoTON. TEXAS 76011 OCT I 71990 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: TV Electric Name of Facility: Ccmanche Peak Steam Electric Station (CPSES), Unit 1 Docket:

50-445 s

Date and Time 0ctober 31, 1990 at 1 p.m.

of Meeting:

Location of Meeting:

Region IV Office, 8th Floor Conference Room Purpose of Meeting:

Enforcement Conference to discuss the findings associated with an inspection of licensee actions regarding operability concerns relative to the Unit I containment personnel airlock (NRC Inspection Report 50-445/90-33; 50-446/90-33).

This meeting will include discussions concerning:

(1) failure of the personnel airlock Type B test conducted in accordance with Appendix J to 10 CFR Part 50, (2) the documentation inadequacies associated with the personnel airlock hydraulic system, and (3) the mispositioned l

equalizing valve in the personnel airlock.

L

,

l.

HRC Attendees:

L. J. Callan, Director, Division of Reactor Safety (DRE)

'

T. P. Gwynn, Deputy Director, Division of Reactor Projects (DRP)

>'

D. D. Chamberlain, Chief, Project Section C, DRP

W. D. Johnson, Senior Resident Inspector, CPSES, DRP D. N. Graves, Resident Inspector, CPSES, DRP-A. T. Howell, Resident Inspector, CPSES, DRP i

l a;

W. C. Seidle, Chief, Test Programs Section, DRS

!

l 0. L. Kelley, Reactor Inspector, Test Programs Section, DRS A..Singh, Reactor Inspector, Test Programs Section, DRS Licensee Attendees:

W. J. Cahill, Jr., Executive Vice President L

A. B. Scott, Vice President, Nuclear Operations

J. J. Kelly,. Plant Manager M. R..Blevins, Manager of Nuclear Operations Support j

P. B. Stevens, manager, of Operations Support Engineering C. L. Terry, Director of Quality Assurance R. D. Walker, Manager of Nuclear Licensing 9010290005 901017 PDR ADOCK 05000445 o

PDC

.

..

..

,.

-

.

TU Electric-2-Il0TE: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by COB on October 30, 1990, via telephone call to W. C. Seidle (FTS728-8148).

f Approved by:

W. C. Seidle.,/ Chief Test Programs Section Distribution:

J. H. Sniezek, DEDR H. L. Thompson, DEDS T. E. Murley, D/NRR W. T. Russell, ADT/NRR J. G. Partlow, ADP/NRR J. Lieberman. D/0E L. J. Chandler, Asst. GC for Enf.

Project Manager, NRR M. M. Slosson, OEDO Staff R. D. Martin, RIV G. F. Sanborn, E0 C. A. Hackney, RSLO

,

J. Gilliland, PAO, RIV l

NRC Attendees l-DMB Licensee Address List l

L l

l

. *w i

$G '

O

@