U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-445/80-21; 50-446/80-21 Docket No. 50-445; 50-446 Category A2 Licensee: Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 Facility Name:
Comanche Peak, Units 1 and 2 Inspection at:
Comanche Peak Steam Electric Station, Glen Rose, Texas Inspection conducted:
September 8-12, 1980 Inspectors: / Mare f 4 80 L. E. Martin, Reactor Inspector, Projects Section Date (all paragraphs)
lA 9/s.6/9C
,
A. K. ~Jo%1 son, Reactor Irispector, Engineering Dite (
Support Section Approved:
--
% 24[gg W. A. Crossman, Chief, Projects Section Date 6-A 9/2fe}90 M R. E. Hall, Chibf, Engineering Support Section D'ite (
Inspection Summary:
Inspection on September 8-12, 1980 (Report No. 50-445/80-21; 50-446/80-21)
Areas Inspected: Routine, unannounced inspection of safety-related construction activities pertaining to installation, inspection and documentation of safety-related electrical cables.
The inspectio1 involved seventy-two inspector-hours by two NRC inspectors.
Results: No items of noncompliance or deviations were identif.ed.
.8011040
.
.
-
.
DETAILS 1.
Persons Contacted Principal Licensee Personnel
- R. G. Tolson, TUCGO, Site QA Supervisor
- J. T..Merrit, TUSI, Manager, Engineering e
'onstruction J. Lowry, TUGCO, Quality Engineer The IE inspector also interviewed other licensee and contractor personnel during the course of the inspection.
- Denotes those attending the exit interview.
2.
Site Tour The IE inspectors walked through the Unit 1 Reactor Containment, Service Water Intake Structure, Auxiliary Building, Spent Fuel area, Control Complex area, and various outside storage and lay-down areas to observe construction activities in progress.
Par-ticular attention was given to housekeeping and storage of in-place electrical equipment and components.
No items of noncomplinace or deviations were identified.
3.
Electrical Cables and Terminations The IE inspectors reviewed the cable pull cards and inspection records for thirty. class IE cables that have been installed in Unit 1.
The IE' inspectors also reviewed the receiving records and qualification documentation for the cables involved above.
The followin,3: documents were reviewed by the inspectors:
Inspection Reporta EC 5473, EC 4300, ET 5950, EC 1162, ET 5955, ET 5427, EC 2033, ET 3139, EC 5197, EC 5221, ET 8144, EC 3360, ET 4233, EC 0844, 3T 1721, ET 1720, ET 3980, EC 3245, EC 2034, ET 3138, EC 2513, ET 3271, EC 2509, EC 0859, ET 1834, ET 5990, and ET 5364 Material Requisition Reports 2451, 2769, 2973, 2984, 3653, 7503, 7167, 4712, 5337, 2838, 2905, 3856, 3996, 2737, 2988, and 4491 Receiving Inspection Reports 9801, 9802, 6657, 7446, 7512, 7915, 8492, 14005, 13S04, 10838, 9682, 7426, 7445, 8747,.-8927, 7115, and 7518
,
lesign Change Authorization 7494
-2-
__
,
,
,
The above records and documents were reviewed for compliance with l
FSAR commitments, Gibbs and Hill Specifications 2323-ES 13.A, B, and C, IEEE Standards 323 and 383, and the applicable quality control procedurer and instructions.
No items of noncompliance or deviations were identified.
4.
Exit Interview The IE inspectors met with the licensee representatives (denoted in paragraph 1) and Mr. R. G. Taylor (NRC Resident Reactor Inspector)
at the conclusion of the inspection on September 12, 1980.
The IE inspectors summarized the purpose, scope, and findings of the inspec-tion, i
I G-3
.
.