Forwards IE Insp Repts 50-445/80-06 & 50-446/80-06 on 800220-21.No Noncompliance Noted
ML19323A604
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/29/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19323A596 List:
References
NUDOCS 8004210443
Download: ML19323A604 (1)


Text

Y

,4

.

/

o, UNITED STATES S 7,2.c ' i NUCLEAR REGULATORY COMMISSION

REGION IV

,-

[

611 RYAN PLAZA DRIVE, SUITE 1000 3,

,

,$

ARLINGTON, TEXAS 76012

%

February 29, 1980 In Reply Refer To:

Docket Nos. 50-445/80-06 50-446/80-06 Texas Utilities Generating Company

ATTN: Mr. B. R. Clements, Vice President &

Manager of Nuclear Operations 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

This refers to the inspection conducted by Mr. R. Smith of this office cover-ing the period February 20-21, 1980, of activities authorized by NRC Construction Pemits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units 1 and 2, and to the discussion by the inspector with members of your staff at the conclusion of the inspection.

The areas covered are discussed in the enclosed inspection report. Within the scope of the inspection, no items of noncompliance were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within 20 days to this office to c

withhold such infomation from pub.M 'isclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the infomation is proprietary, and should be prepared so that proprietary infomation identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be pleased to discuss them with you.

Sincerely, N[dC V G. L. Madsen, Chief, Reactor Operations and Nuclear Support Branch Enclosure:

IE Inspection Report Nos. 50-445/80-06 50-446/80-06 h