IR 05000445/1980008

From kanterella
Jump to navigation Jump to search
Forwards Notice of Violation from Insp During 791213-800402. IE Insp Repts 50-445/80-08 & 50-446/80-08 Will Be Transmitted in Near Future
ML19310A147
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/02/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19310A148 List:
References
NUDOCS 8006060169
Download: ML19310A147 (2)


Text

_

_

__

_ _ _ _ _ _ _ _ _

7Zc

  1. gp ' * ' ',wg'c, UNITED STATES NUCLEAR REGULATORY COMMISSION O ><

r

$,

REGloN IV I '

,1 C

611 RY AN PLAZA DRIVE, SUITE 1000

, [

ARLINGTON, TEX A5 76012

-

% ?~

j

%,,

u j

April 2, 1980

.

In Reply Refer To:

RIV Docket No.

50-445/80-03 50-446/80-08 Texas Utildties Generating Company ATTN:

Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

This refers to the inspection activities performed by our Resident Inspector, Mr. R. G. Taylor, of activities authorized by NRC Construction Permit No.

CPPR-127 for the Comanche Peak Steam Electric Station, Unit 2, and to the discussion of the findings by the inspector with members of your staff on April 2,1980.

During the inspection, it was found that certain activities under your license appear to be in noncompliance with Part 50, Title 10, of the Code of Federal Regulations.

The item of noncompliance and references to the pertinent requirements are identified in the enclosed Notice of Violation. Details of this item will be included in an inspection report to be issued in the near future and identified as Inspection Report No.

50-445/80-08; 50-446/80-08.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 30 days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3)

the date when full compliance will be achieved.

.

8006060/69 O

-

- - -

- --

- --

--

_-

.

Texas Utilities Generating Company

In regard to the f orthcoming meeting with you, Mr. Fikar and Mr. Chapman in the Region IV office on April 8, 1980, it is our intent to use this,

occasion to further clarify the NRC position on the reporting of coratruction deficiencies in accordance with 10 CFR 50.55(e).

During the meeting, we will be pleased to respond to any questions you or your staff may have regard-ing the item of noncompliance with 10 CFR 50.55(e) which is the subject of the attached Notice of Violation.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, i

,2(I

-

-

W

_ -r- -

W. C. S idle, Chief Reactor 'onstruction and Engineering Support Branch Enclosure:

Appendix A, Notice of Violation

cc: w/ enclosure j

'

Texas Utilities Generating Company ATTN:

Mr. H. C. Schmidt, Project Manager

,

2001 Bryan Tower

Dallas, Texas 75201 j

i i

.

,

L k '

I