Text
/ [L
UNITED STATES
/p Recy%
NUCLEAR REGULATORY COMMISSION
'
ONs
n
R EGloN IV
8
I, d
o
611 RYAN PLAZA DRIVE, SulTE 1000
% j,%
..Aj
ARLINGTON, TEXAS 76012
% l
.
f
\\
Septeober 26, 1980
'
y
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 80-21
50-446/Rpt. 80-21
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Martin and A. R.
Johnson of our staff during the period September 8-12, 1980, of activities
authorized by NRC Construction Permits No. CPPR-126 and 127 for the Comanche
Peak facility, Units No. I and 2, and to the discussion of our findings with
Mr. R. G. Tolson and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Within the scope of the inspection, no items of noncompliance were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the
reasons why it is claimed that the information is proprietary. The application
.
should be prepared so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
'
will also be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
801104 06(,,p
9
. . .
.
_
.
Texas Utilities Generating Company
-2-
September 26, 1980
Should you have any questions concerning this inspection, we will be pleased
to discuss them with yoa.
Sincerely,
/' -Yb
_
.r
W. C. Seidig^., Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/80-21
50-446/80-21
cc: w/ enclosure
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201