Text
y
_-
!
'
- '*$(L UNITED STATES
.^
NUCLEAR REGL'LATORY COMMISSION -
7, g
-
.%.
j REGION 11
t, l-101 MARIETTA ST., N.W.
,
>
- .*4
'
Report No.:
50-416f89-23-(Corrected 11/1/89)_
r
.
Licensee: System Energy Resources, Inc.
Jackson, MS 39205 L
' Docket N'o.:
50-416'
License No.:
.F L
Facility Name:
Grand' Gulf t
Inspection Condu
- August 26 - September 30, 1989
!
Inspectors:
M-II'I^ b w
I H. 0. Chr;istenser,, Senior Resident Inspection
' Date Signed du 0
'W
[f - I ~ 99 J. L. Mathis, Resident Inspector Date Signed-
"
Approved by: Md N///T ?
E $. Cantrell, Chiefj O Date~51gned
,
Projects Section IB Reactor Projects Branch 1 Division of Reactor Projects j
SUMMARY
L Scope:^
The resident inspectors conducted a routine inspection in the area:
,
l operational safety verification, maintenance observation, surveillance observation ' licensed operator training, action on previous inspection
'
- findings, meeting with local officials, and reportable occurrences.
The i
L inspectors conducted backshift inspections'on September 4, 12, and 15, 1989.
l-E Results:
Within the areas inspected one violation with three examples was identified:
Failure to follow procedures which resulted in the closure of the instrument
air cross-tie valve, a half scram on reactor protection rystem division II, and the. inadvertent isolation of the reactor water cleanup system, paragraph 3.
This violation appears to be due to a lack of attention to detail by the operations and I&C departments.