IR 05000416/1980004

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-416/80-04 & 50-417/80-04 on 800116-18.No Noncompliance Noted.Major Areas Inspected:Action on Previously Identified Items,Const & Warehouse Surveillance
ML19305B249
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/04/1980
From: Hunt M, Wilcox J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19305B246 List:
References
50-416-80-04, 50-416-80-4, 50-417-80-04, 50-417-80-4, NUDOCS 8003190374
Download: ML19305B249 (4)


Text

enneu

^4^

UNITED STATES i

+

NUCLEAR REGULATORY COMMISSION n

$

9$

REGION 11

[

' 101 MARIETTA ST N.W SUITE 3100 o

.

%

e ATLANTA, GEORGIA 30303

-

.....

FEB -41950 Report Nos. 50-416/80-04 and 50-417/80-04 Licensee: Mississippi Power and Light Company Jackson, Mississippi Facility Name: Grand Gulf Nuclear Plant Docket Nos. 50-416 and 50-417 License Nos. CPPR-118 and CPPR-119 Inspector:

dI

' Lt W

A/ NU

-

J. D. Wilcosc

/

Ddte ' Signed Approved by:

[d[ b

~.((1<

2 /// ff6 M. D. Hunt, fcting Section Chief, RCES Branch D/te' Mgned

,

SUMMARY

,

Inspection on January 16-18, 1980

-

Areas Inspected This routine, unannounced inspection involved 16 inspector-hours onsite in the areas of licensee action on previous inspection findings inspector followup item, and construction and warehouse surveillance.

Results Of the areas inspected, no items of noncompliance or deviations were identified.

>

s e

+

k

8003100 7Y

-

....

..-

-

..

.

__

___ ___

_ _ _ _ _ _

.

...

DETAILS 1.

Persons Contacted Licensee Employees

  • C. K. McCoy, Plant Manager
  • J. W. Yelverton, QA Field Supervisor
  • D. D. Little, QAR H. D. Morgan, Construction Supervisor Allen McCurdy,. Senior Engineer Ray Patterson, Reactor Engineer Sam Roberts, Warehouse Supervisor Other licensee employees contacted included I construction craf tsmen, 2 technicians, 1 mechanic, 2 security force members, and 4 office personnel.

Other Organizations a

Bechtel Power Corporation (Bechtel)

  • J. R. Valdez, QAE
  • M. R. Lindsey, QAE

-

  • R. L. Scott, Project QA Manager Phil Dyson, Field Engineer Britt Young, Field Engineer General Electric Company (G. E.)

Bill Powers, Field Engineer

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on January 18, 1980 with those persons indicated in Paragraph I above.

>

'

3.

Licensee Action on Previous Inspection Findings a.

(Closed).

Infraction (50-416/79-21-01), LPCS system globe valve F012 incorrectly installed. The inspector reviewed all actions taken in reference to MP&L's responses to violation dated November 30, 1979 and December 19, 1979.

In addition, Bechtel's letters (file # s 0262/0490 of November 28, 1979 and 16694.3 of September 7, 1979) were reviewed for completeness and content. MP&L reactor engineering department concurred with the As-built condition of LPCS system globe valve F012.

All response action has been completed. ')h> further action is required.

i

-

,

<.---so

,

,

e

'

-2-b.

(Closed). Unresolved Item (50-417/79-21-01 and 50-416/79-21-04.',

Change to project engineering drawings. The inspector reviewed the corrective steps taken and results achieved of paragraph D to Bechtel's letter file # 0262/0490 of November 28, 1979. All action has been completed. No further action is required.

c.

(Closed). Unresolved Item (50-416/79-21-03) Valve orientation. The inspector reviewed the corrective steps taken and results achieved in paragraph C to Bechtel letter file # 0262/0490 of November 28, 1979.

All action has been completed. MP&L reactor engineering department concurred with Bechtel's response noted in the above letter. No further action is required.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Inspector Followup Item

>

(Closed).

Inspector followup item (50-416/79-21-02). Expansion loop on standby service water. The inspector reviewed the corrective steps taken and results achieved per paragraph B to Bechtel's letter file # 0262/0490

.

of November 28, 1979. All action has been completed. MP&L reactor engineering department concurred with Bechtel's response in the above noted letter.

.

No further action is required.

6.

Construction Surveillance The inspector examined the following as-built valves and associated a.

piping isometric drawing to ensure the as-built condition complied with the applicable isometric drawings. Valves observed were located in the Unit # 1 containment and auxiliary building.

Value No.

Location Drawing No.

E12 F027A Aux. Building M-1348D Rev 16

{

E12 F027B Aux. Building M-1348E Rev 13 E12 F042C Aux. Building M-1348F Rev 19 E12 F028A Containment M-1348F Rev 19 E12 F041B Containment M-1348F Rev 19 E12 F042A Containment M-1348F Rev 19 No items of noncompliance or deviation were-identified in the areas inspected.

b.

The inspector visually checked the weld rod ovens and attendant in Unit # 1' auxiliary biulding. This area'wa's checked to ensure the %

,

.

t-3-attendant was maintaining the weld rod ovens in accordance with ap-plicable procedures. The procedure being used was WFMC-1 Rev 2

" Welding Filler material control procedure specification". This was determined to be an up to date procedure.

No items of noncompliance or deviation were identified in the areas inspected.

7..

Warehouse Surveillance The inspector observed the storage conditions implemented in both Bechtel and MP&L general warehouses.

It was noted that at the time of the inspec-tion, additional lighting was being installed in the areas inspected.

No items of noncompliance or deviation were identified in the areas inspected.

.