Forwards IE Insp Repts 50-416/80-04 & 50-417/80-04 on 800116-18.No Noncompliance Noted
ML19305B245
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19305B246 List:
References
NUDOCS 8003190368
Download: ML19305B245 (2)


See also: IR 05000416/1980004

Text

b

1

  1. p retuq

[D ' W

jo

UNITED STATES

,p 7 7

g

8

NUCLEAR REGULATORY COMMISSION

e

o

$

SS

E

REGION il

'

%*****o[

o, y

101 MARIETTA ST

N.W.. SulTE 3100

D

ATLANTA, GEORGIA 30303

FEB - 41980

In Reply Refer To:

RII:JDW

50-416/80-04

50-417/80-04

l

.

Mississippi Power and Light Company

ATTN:

N. L. Stampley

Vice President of Production

P. O. box 1640

'ackson, MS 39205

Gentlemen:

This refers to the inspection conducted by J. D. Wilcox, Jr. , of this office on

>

January 16-18, 1980 of activities authorized by NRC Construction Permit Nos.

i

CPPR-118 and CPPR-119 for the Grand Gulf Nuclear facilities, and to the discus-

sion of our findings held with C. K. McCoy at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

.

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

'

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

reputt contalus any information that you (or your contractor) believe to be

'

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

-

,

.

i.

s

80031 00363

- .-

-

. . -

_

'

.

Mississippi Power and Light-Company

-2-

FEB - 41950

t'

.,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

  • '

M

N

Jack C. Bryant, Acting Chief

Reactor Construction and

Engineering Support Branch

j

Enclosures:

Inspection Report Nos. 50-416/80-04

and 50-417/80-04

cc w/ encl:

'1

C. K. McCoy, Plant Manager

P. O. Box 756

Port Gibson, MS 39150

+

.

G

J

'

-

0

%

%

e

c.+

e ;

_

w%. - - .

_...ww.,

9-

. . , _ . . _ . . - . . . . . . . , , , _ , , . .

_

_ . ..

_

. , _ .

-

wy~

,t

w

+* *

'*?'-

7---