Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-409/81-02
ML20004A931
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/19/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20004A932 List:
References
NUDOCS 8105270003
Download: ML20004A931 (1)


Text

7 '/ a

,sp a roy

g tg UNITED STATES NUCLEAR REGULATORY COMMISSION y

~,

g REGION 111

g[r 799 ROOSEVELT ROAD Pg

  • g*

GLEN ELLYN,ILLINOls 60137 MAY I 9 1981

o 3 1

Docket No. 50-409 (

I I

'

\\\\

Dairyland Power Cooperative b

b

,Edq 2 3590\\

-

-

ATTN:

Mr. F. W. Linder r

ptost [

General Manager r(i\\,u.o g a,so*

p 2615 East Avenue - South La Crosse, WI 54601

/

f C0 Gentlemen:

w Thank you for your letter dated April 24, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your atte.ition in our letter dated April 18, 1981. We will examine these mr.Lters during a future inspection.

Your cooperation with us is appreciated.

Sincerely, o

B. F. Heishman, Acting Director Division of Resident and Project Inspection cc:

R. E. Shimshak, Plart Superintendent cc w/ltr dtd 4/24/81:

Central Files Reproduction Unit NRC 20b AE0D Resident Inspector, RIII PDR T,ocal PDR NSIC Tlc John J. Duffy, Chief Boiler Inspector Mr. Stanley York, Chairman Public Service Commission 8105270 0 0 3