W U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-409/81-03 Docket No. 50-409 License No. DPR-43 Safeguards Group IV Licensee:
Dairyland Power Cooperative 2615 East Avenue - South
- .a Crosse, WI 54601 Facility Name: La Crosse Boiling Water Reactor Inspection At: Genoa, WI Inspection Conducted: February 24-27, 1981
'
Date of Last Material Control and Accounting Inspection: July 11-13, 1978 Type of Inspection: Unannounced Material Control and Accountability
/
./
-?
Inspector:
%'. d %,cd_.s J4 IJ ' /
A. G. Finley, Audifor Date '
)h h Approved By:
.
.
, R. Creed, Acting Chief D/te I afeguards Section Inspection Summary:
Inspection on February 24-27, 1981 (Report No. 50-409/81-03)
Areas Inspected: Material control and accountability including facility organization and operation; measurement and controls; storage and internal controls; shipping and_ receiving; records and reports and inventory. The inspection involved 26 inspector-hours onsite by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the six areas examined during the inspection.