IR 05000409/1981001

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-409/81-01
ML19345G692
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/16/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML19345G693 List:
References
NUDOCS 8104220068
Download: ML19345G692 (1)


Text

'o, UNITED STATES 8"

'n NUCLEAR REGULATORY COMMISSION

b-

. E REGION lli

799 ROOSEVELT ROAD

%,

j GLEN ELLYN, ILLINOIS 60137

.....

April 16, 1981 d3 Lf

/ /'%

Docket No. 50-409 h gg 9-Ap L

g2.0

Dairyland Power Cooperative

o,4

'2 ATTN:

Mr. F. W. Linder

/1%

-

General Manager

  1. cey,y 2615 East Avenue - South

/

f La Crosse, WI 54601 Opgi q A t Gentlemen:

Thank you for your letter dated March 27, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Repert No. 50-409/81-01 forwarded by our letter dated February 17, 1981.

We will examine these matters during a subsequent

'

inspection.

Your cooperation with us is appreciated.

Sincerely, s

<

.

R.

. Heishman, ting Director Division of Resident and Project Inspection cc:

R. E. Shimshak, Plant Superintendent cc w/1tr dtd 3/27/81:

Central Files Reproduction Unit NRC 20b AE0D Resident Inspector, RIII PDR Local PDR NSIC TIC John J. Duffy, Chief Boiler Inspector Mr. Stanley York, Chairman Public Service Commission 81042200 @