IT DlDA/RYLAND h
[k COOPERA7/VE. pO Box 8i7 2 sis EAST AV SOUTH
- LA CROSSE W1SCONSIN 5460i (608) 788 4 000 April 24, 1981 In reply, please refer to LAC-7488 DOCKET N0. 50-409 Mr. R. F. Heishman Chief, Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, IL 60137
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE N0. DPR-45 IE INSPECTION REPORT N0. 50-409/81-02
REFERENCES:
(1) NRC Letter, Heishman to Linder, Dated April 18, 1981
Dear Mr. Heishman:
This letter constitutes the written statement reqaired in reply to the subject February 1981 NRC Inspection Report (Reference 1) which we received April 13, 1981. Appendix A, " Notice of Violation," listed one item of noncompliance.
ENFORCEMENT ITEM Infraction:
LACBWR's Technical Specification 6.8.1 required procedures covering safety related activities listed in Regulatory Guide 1.33 to be established and implemented.
Contrary to the above, on February 1,1981, a plant operator failed to properly implement a switching procedure causing a loss of offeite power.
DPC RESPONSE Corrective Action Taken and Results Achieved Although the operator executing the written switching order was qualified to perfonn the switching, he incorrectly read the label on the switch handle and consequently opened 69 KV air break disconnect 25NA4 under load. This action caused a plant trip.
MAT 1 198f 8105270 ooh
.=
Mr. R. F. Heishman Chief, Reactor Operations and LAC-7488 Nuclear Support Branch April 24, 1981 011 circuit breaker 25NB4 was then opened remotely from the Control Room and switch 25NA4 was manually closed. Offsite power was restored within 15 minutes by restoring 25NB4. Following these actions, the correct switch 25NA1 was opened without incident.
The actions of the switchyard operator were reviewed promptly with him by the Operations Supervisor, who was at the plant at the time of the incident. The operator was later interviewed in a meeting which included the Plant Superintendent, Assistant Plant Superinteraienc, Operations Engineer, Assistant to Operations Supervisor, and the Operator's Shift Supervisor.
Corrective Action Taken to Avoid Further Noncompliance Practical switchyard training and retraining is being provided to LACBWR Operators by the DPC Superintendent of Transmission and the Dispatcher Supervisor. The majority of this training has been completed. The last session is scheduled for April 21, 1981. Also, whenever practicable, outside switching orders will be executed in the presence of a second person to provide a double check.
It is our opinion that the additional training and the use of a second person to perform a verification check should result in improved performance of switching orders.
Date Full Compliance Achieved April 21,1981.
The number of personnel errors which occurred at the beginning of this yeae also greatly concerned DPC management. Additional training, such as the switchyard training has been provided to the operators. All members of the Operations Department have reviewed the reports on the recent instances of personnel error. This dissemination of operating experience should help prevent reoccurrence of similar incidents.
Plant management has engaged in interviews with several operators and their Shift Supervisors to convey management's concern with operator performance. We are confident that these actions should help minimize future personnel errors.
If you have any questions, please contact us.
Very truly yours, DAIRYLAND POW-R COOPERATIVE b
Frank Linder, General Manager FL:LSG: abs 4
e Mr. R. F. Heishman Chief, Reactor Operations and LAC-7488 Nuclear Support Branch April 24, 1981 CC: NRC Office of Inspection and Enforcenent Division of Reactor Operations Inspection Washington, D. C.
20555 Resident Inspectors STATE OF WISCONSIN )
)
COUNTY OF LA CROSSE)
/
i Personally came before me this Jf9.Jf/ day of April 1981, the above named Frank Linder, to me known to be the person who executed the foregoing instrument and acknowledged the same.
\\
/
g
.w, P.
My Commission E@@/ Crosse County, Wisconsin.
Notary Public, l
ires 2/26/84.
s I
l l l
[
-.