IR 05000400/2010405

From kanterella
Jump to navigation Jump to search
IR 05000400-10-405, on 08/12/10, Shearon Harris, NRC Office of Investigations Report 2-2010-023
ML102861827
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/05/2010
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Burton C
Carolina Power & Light Co
References
IR-10-405
Download: ML102861827 (3)


Text

UNITED STATES October 5, 2010

SUBJECT:

NRC OFFICE OF INVESTIGATIONS REPORT 2-2010-023, AND SHEARON HARRIS NUCLEAR PLANT INSPECTION REPORT 05000400/2010405

Dear Mr. Burton:

This refers to the investigation completed on August 12, 2010, regarding security activities at your Shearon Harris Nuclear Power Plant, Unit 1. The purpose of the investigation was to review the facts and circumstances associated with a security related issue. The results of the investigation were discussed on September 21, 2010, with Mr. B. Bernard and other members of your staff.

Based on the results of this investigation, no findings were identified. However, two licensee-identified violations which were determined to be of very low safety significance are listed in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low safety significance of the violations and because they were entered into your corrective actions program. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report with the basis of your denial, to the Nuclear Regulatory Commission, Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Nuclear Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of the enclosures to this letter will not be available for public inspection. CP&L 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Should you have questions concerning this letter, please contact us.

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-400 License No. NPF-63 Enclosures: 1. Summary of Findings 2. Synopsis OI Investigation 2-2010-023 3. Licensee Identified Violations 4. Administrative Closure cc w/Encl: See Page 3 3 cc w/Encl: John C. Warner cc w/Inspection Summary: Manager Brian C. McCabe Support Services Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 1981 P.O Box 165, Mail Zone 1 Raleigh, NC 27602-1981 New Hill, NC 27562-0165 Christopher Christos Kamilaris Vice President Director Shearon Harris Nuclear Plant Fleet Support Services Carolina Power & Light Company Carolina Power & Light Company P.O. Box 165, Mail Zone 1 P.O. Box 1551 New Hill, NC 27562-0165 Raleigh, NC 27602-1551 Kelvin Henderson Joseph W. Donahue Plant General Manager Vice President Carolina Power and Light Company Nuclear Oversight Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Zone 3 P.O. Box 1551 New Hill, NC 27562-0165 Raleigh, NC 27602-1551 Phyllis N. Mentel (Acting) Manager Support Services Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165 David T. Conley Associate General Counsel Legal Dept.

Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551