IR 05000400/2010402
| ML101810401 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/25/2010 |
| From: | Ernstes M NRC/RGN-II/DRS/PSB2 |
| To: | Burton C Carolina Power & Light Co |
| References | |
| IR-10-402 | |
| Download: ML101810401 (3) | |
Text
June 25, 2010
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000400/2010402
Dear Mr. Burton:
On May 28, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with Mr. K. Henderson, and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation which was determined to be of very low safety significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low safety significance of the violation and because it is entered into your corrective actions program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Nuclear Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained CP&L
2 in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA: Jon Wallo for/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety
Docket No.: 50-400 License No.: NPF-63
Enclosure:
Inspection Report 05000400/2010402 w/Attachment Supplemental Information
cc: See Page 3 CP&L
3 cc w/encl:
Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.
P.O. Box 1981 Raleigh, NC 27602-1981
Christopher Vice President Shearon Harris Nuclear Plant Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
Kelvin Henderson Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 3 New Hill, NC 27562-0165
Phyllis N. Mentel (Acting) Manager Support Services Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
David T. Conley Associate General Counsel Legal Dept.
Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551
John C. Warner Manager Support Services Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant P.O Box 165, Mail Zone 1 New Hill, NC 27562-0165
Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company P.O. Box 1551 Raleigh, NC 27602-1551
Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company P.O. Box 1551 Raleigh, NC 27602-1551